# US 2013/0254737 A1 · Project delivery system

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2013/0254737 A1
- Document ID: US20130254737A1
- Status: Published application
- Kind: A1
- Application number: 13/755,699
- Filed: 2013-01-31
- Published: 2013-09-26
- Earliest claimed: 2012-03-23
- Assignees: Tata Consultancy Services Limited
- Applicants: Tata Consultancy Services Limited
- Inventors: Manoj Kumar LAL
- Web page: https://patentgrep.com/patent/US20130254737A1

## CPC

- G06F 8/70: Software maintenance or management
- G06Q 10/06: Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR

## Abstract

Systems and methods for managing projects are described herein. In one implementation, the computer implemented method for delivering projects includes obtaining project detail components comprising at least one of a project scope definition, a project business requirements set, a project technical requirements set and a project test requirements set. The method further includes retrieving at least one project analysis rule, pertaining to the project, wherein the at least one project analysis rule integrates a plurality of the project detail components of the project details; analyzing the project detail components, based on the at least one project analysis rule; and determining, based on the analyzing, an inconsistency parameter, indicative of inconsistencies present in at least one of the project scope definition, the project business requirements set, and the project technical requirements set. The method further comprises creating a system design report for completion the project based in part on the analyzing.

## Claims

### Claim 1

A computer implemented method for delivering a software development project, the method comprising:
obtaining project detail components comprising at least one of a project scope definition, a project business requirements set, a project technical requirements set, and a project test requirements set;
retrieving, from a rule repository, at least one project analysis rule pertaining to the project, wherein the at least one project analysis rule integrates a plurality of the project detail components of the project details;
analyzing the project detail components, based on the at least one project analysis rule;
determining, based on the analyzing, an inconsistency parameter indicative of inconsistencies present in at least one of the project scope definition, the project business requirements set, and the project technical requirements set; and
creating a system design report for completion the project based in part on the analyzing.

### Claim 2 (depends on 1)

The method as claimed in claim 1, wherein the obtaining further comprises receiving at least one of details of application modules, and details of functions associated with the project.

### Claim 3 (depends on 1)

The method as claimed in claim 1, wherein the obtaining further comprises at least one of receiving test components, wherein the test components comprise at least one of test objectives and test scenarios and receiving test cases.

### Claim 4 (depends on 3)

The method as claimed in claim 3, wherein the method further comprises defining an interrelationship between the project details and the test components.

### Claim 5 (depends on 1)

The method as claimed in claim 1, wherein the creating further comprises generating at least one of a business design report, a requirement catalogue, a traceability report, and a test report.

### Claim 6 (depends on 1)

The method as claimed in claim 1, wherein the creating further comprises generating at least one of a technical design document, a business design document, a project estimate document, a risk log, and a query log.

### Claim 7 (depends on 1)

The method as claimed in claim 1, wherein the method further comprises computing a project status index, indicative of the status of the project, based on the at least one project analysis rule.

### Claim 8 (depends on 1)

The method as claimed in claim 1, wherein the creating further comprises generating workflow for completion of the project, wherein the workflow comprises one or more business processes.

### Claim 9 (depends on 1)

The method as claimed in claim 1, wherein the creating further comprises generating an accounts report, indicative of the accounts pertaining to the project.

### Claim 10

A project delivery system, configured to manage a software development project over a communication network, comprising:
a processor; and
a memory coupled to the processor, the memory comprising
a resource analysis module configured to,
obtain project detail components comprising at least one of a project scope definition, a project business requirements set, a project technical requirements set, and a project test requirements set;
a requirement analysis module configured to,
retrieve, from a rule repository, at least one project analysis rule, pertaining to the project, wherein the at least one project analysis rule integrates a plurality of the project detail components of the project details;
analyze the project detail components, based on the at least one project analysis rule;
determine, based on the analyzing, an inconsistency parameter, indicative of inconsistencies present in at least one of the project scope definition, the project business requirements set, and the project technical requirements set; and
a report generation module configured to
create a system design report for completion the project based in part on the analyzing.

### Claim 11 (depends on 10)

The project delivery system as claimed in claim 10, wherein the resource analysis module is further configured to obtain at least one of details of application modules, and details of functions associated with the project.

### Claim 12 (depends on 10)

The project delivery system as claimed in claim 10, further comprising a project audit module configured to compute a project status index, indicative of the status of the project, based on the at least one project analysis rule.

### Claim 13 (depends on 12)

The project delivery system as claimed in claim 12, wherein the project audit module is further configured to generate workflow for completion of the project, wherein the workflow comprises one or more business processes.

### Claim 14 (depends on 10)

The project delivery system as claimed in claim 10, wherein the report generation module is further configured to generate at least one of a technical design document, a business design document, a project estimate document, a risk log, and a query log.

### Claim 15

A computer-readable medium having embodied thereon a computer program for executing a method comprising:
obtaining project detail components comprising at least one of a project scope definition, a project business requirements set, a project technical requirements set, and a project test requirements set;
retrieving, from a rule repository, at least one project analysis rule, pertaining to the project, wherein the at least one project analysis rule integrates a plurality of the project detail components of the project details;
analyzing the project detail components, based on the at least one project analysis rule;
determining, based on the analyzing, an inconsistency parameter, indicative of inconsistencies present in the at least one of the project scope definition, the project business requirements set, and the project technical requirements set; and
creating a system design report for completion the project based in part on the analyzing.