# US 2013/0253974 A1 · System And Method For Inspecting And Assessing Risk of Mechanical Equipment And Facilities

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2013/0253974 A1
- Document ID: US20130253974A1
- Status: Published application
- Kind: A1
- Application number: 13/894,705
- Filed: 2013-05-15
- Published: 2013-09-26
- Earliest claimed: 2011-12-02
- Assignees: Technical Standards And Safety Authority
- Applicants: Technical Standards And Safety Authority
- Inventors: Srikanth MANGALAM; Lency Abraham MULAMOOTIL; Arun VEERAMANY
- Web page: https://patentgrep.com/patent/US20130253974A1

## CPC

- G06Q 10/06315: {Needs-based resource requirements planning or analysis}
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR

## Abstract

A method for determining a risk of mechanical or electrical failure and for determining an inspection interval to mitigate said risk; the method including determining by a computer system an acceptable risk score based on computer readable instructions provided on a non-transitory computer readable medium, determining by said computer system an inspection interval based on said risk score, determining by said computer system a tolerance within said inspection interval based on said increased risk; and, specifying by said computer system an inspection interval and an inspection tolerance based on said determined schedule and said determined tolerance.

## Claims

### Claim 1

A method for determining a risk of mechanical or electrical failure and for determining an inspection interval to mitigate said risk; the method comprising:
determining by a computer system an acceptable risk score based on computer readable instructions provided on a non-transitory computer readable medium;
determining by said computer system an inspection interval based on said risk score;
determining by said computer system a tolerance within said inspection interval based on said increased risk; and,
specifying by said computer system an inspection interval and an inspection tolerance based on said determined schedule and said determined tolerance;
wherein said step of determining an inspection interval comprises calculating an inspection interval tm or tl based on equations (3) and (4) for medium and low risk devices, respectively:
t
M
=
12
-
1
0.7

LN

[
λ
6.7
×
10
-
6
]
(
3
)
t
L
=
18
-
1
1.21

LN

[
λ
4.713
×
10
-
9
]
(
4
)
where tm and tL are measured in months, and λ is an acceptable risk score;
and wherein said step of determining of determining an acceptable risk score comprises calculating λ based on equation (5)
λ
d
=
∑
i

SRR
i
*
D
i
∑
i

D
i
(
5
)
where
SRRi is the ith operational risk score for the facility d
Di is the time duration in years between inspection dates corresponding to SRRi-1 and SRRi.

### Claim 2 (depends on 1)

A method according to claim 1, wherein said operational risk score is calculated based on the equation (1):
SRR=fb*D (1)
where fb is the frequency of incident occurrences per year; and,
D is a measure of life years expected to be lost as a result of said occurrences by occurrence type, and is calculated based on equation (2):
D=SW*SD+FL*LW*LD (2)
where:
SW is a short-term weight,
SD is a short-term duration effect measured in years,
FL is a fraction representative of the long-term versus short-term effects,
LW is a long-term weight, and
LD is a long-term duration effect measured in years.

### Claim 3 (depends on 1)

A method according to claim 1, wherein said method is applied to a fuel storage device or a fuel storage facility.

### Claim 4 (depends on 1)

A method according to claim 1, wherein said high risk device is one where the value of D from equation (2) is equal to or greater than 4.5×10−4; said medium risk device is one where the value of D from equation (2) is between 4.5×10−4 and 6.7×10−6 and said low risk device is one where the value of D from equation (2) is less than 6.7×10−6.

### Claim 5 (depends on 1)

A method according to claim 1, further comprising determining a cumulative time-dependent risk curve based equation (6)
Rd(t)=(λt)pD (6)
where
Rd(t) is the cumulative risk up to time t for facility d.
λd=λ/D is the occurrence rate expressed as occurrences per year.
D=is a constant representing average health impact observed in any given year.
t is the time since the last inspection.
p is the shape factor independent of the facility, determined by fitting a statistical distribution to a dataset containing a time to first occurrence signifying underlying failure since the last periodic inspection;
wherein said time dependent risk curve is used to determine an increase in risk score from a time proportional to a time elapsed since a previous inspection.

### Claim 6

A system for determining a risk of failure and for determining an inspection interval to mitigate said risk; the system comprising:
a module for determining an acceptable risk score;
a module for determining an inspection interval based on said risk score;
a module for determining an increase in risk score proportional to a time elapsed since an expected inspection in said inspection interval if said expected inspection has been missed;
a module for determining a tolerance within said inspection interval based on said increased risk; and,
a module for specifying an inspection interval and an inspection tolerance based on said determined schedule and said determined tolerance.
wherein said determining an inspection interval comprises calculating an inspection interval tm or tl based on equations (3) and (4) for medium and low risk devices, respectively:
t
M
=
12
-
1
0.7

LN

[
λ
6.7
×
10
-
6
]
(
3
)
t
L
=
18
-
1
1.21

LN

[
λ
4.713
×
10
-
9
]
(
4
)
where tM and tL are measured in months, and λ is an acceptable risk score;
and wherein said step of determining of determining an acceptable risk score comprises calculating λ based on equation (5)
λ
d
=
∑
i

SRR
i
*
D
i
∑
i

D
i
(
5
)
where
SRRi is the ith operational risk score for the facility d
Di is the time duration in years between inspection dates corresponding to SRRi-1 and SRRi.

### Claim 7 (depends on 6)

The system according to claim 6, wherein said operational risk score is calculated based on the equation (1):
SRR=fb*D (1)
where fb is the frequency of incident occurrences per year; and,
D is a measure of life years expected to be lost as a result of said occurrences by occurrence type, and is calculated based on equation (2):
D=SW*SD+FL*LW*LD (2)
where:
SW is a short-term weight,
SD is a short-term duration effect measured in years,
FL is a fraction representative of the long-term versus short-term effects,
LW is a long-term weight, and
LD is a long-term duration effect measured in years.

### Claim 8 (depends on 6)

The system according to claim 6, wherein the system is applied to a fuel storage device or a fuel storage facility.

### Claim 9 (depends on 6)

The system according to claim 6, wherein said high risk device is one where the value of D from equation (2) is equal to or greater than 4.5×10−4; said medium risk device is one where the value of D from equation (2) is between 4.5×10−4 and 6.7×10−6 and said low risk device is one where the value of D from equation (2) is less than 6.7×10−6.

### Claim 10 (depends on 6)

The system according to claim 6, further comprising determining a cumulative time-dependent risk curve based equation (6)
Rd(t)=(λt)pD (6)
where
Rd(t) is the cumulative risk up to time t for facility d.
λd=λ/D is the occurrence rate expressed as occurrences per year.
D=is a constant representing average health impact observed in any given year.
t is the time since the last inspection.
p is the shape factor independent of the facility, determined by fitting a statistical distribution to a dataset containing a time to first occurrence signifying underlying failure since the last periodic inspection;
wherein said time dependent risk curve is used to determine an increase in risk score from a time proportional to a time elapsed since a previous inspection.