# US 2013/0253968 A1 · Facility control system (fcs, c1) to manage assets planning, design, construction, fabrication, operating, maintence and products

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2013/0253968 A1
- Document ID: US20130253968A1
- Status: Published application
- Kind: A1
- Application number: 13/429,651
- Filed: 2012-03-26
- Published: 2013-09-26
- Earliest claimed: 2012-03-26
- Inventors: David Frederick Martinez; Elias George EL-Dahdah; Chuang-Tsair Shih
- Web page: https://patentgrep.com/patent/US20130253968A1

## CPC

- G06Q 10/06: Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q 50/08: Construction
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR

## Abstract

A facility control system includes lab, field and construction equipment with a wireless transceiver to transmit machine generated actual initial measurement (AIM) data including GPS information from a field activity to a wide area network; a mobile computer with a wireless transceiver to transmit human generated data from an office, a remote lab, or a field test or inspection to the network; and a server coupled to the network, the server including a database to receive machine and human generated AIM data, wherein the server applies statistics and engineering methods to predict specification compliance and performance, wherein the AIM data is used with pre-formatted engineered designed data sheets that reflect the exact location of the event and required standards including incorporating best construction practices for installation of one or more construction items and materials quality to promote standardization, uniformity that insures contract compliance and minimizes non-conforming items in real time.

## Claims

### Claim 1

A facility control system, comprising:
lab and field equipment with a wireless transceiver to transmit machine generated actual initial measurement (AIM) data from a field activities, inspection and tests to a wide area network;
a mobile computer with a wireless transceiver to transmit human generated data from an office, remote construction site, a remote lab, or an inspection or field test to the network;
the mobile logs the AIM data with GPS for 3D identification and AIM/AFM data is accessible through a GIS and
a server coupled to the network, the server including a central database to receive machine and human generated AIM data, wherein the server applies statistics and engineering methods to predict specification compliance and performance, wherein the AIM and AFM data is used with pre-formatted engineered designed data sheets and dynamic reporting that reflect the required standards and best practices including incorporating best construction practices for installation of one or more construction items and materials quality to promote standardization, uniformity that insures contract compliance and minimizes non-conforming items, wherein the AIM and AFM data is calculated on the server over the network in real time,
wherein the server, lab equipment, and mobile computer form a systematic approach to provide real time dynamic reports regarding one or more components of a capital improvement program (CIP); wherein the systematic approach enables one or more construction teams to generate dynamic reports in real time with best practice engineered designed data sheets for installation and testing of project activities and construction items, and wherein the systematic approach supports indexing of complete project specific data to facilitate document retrieval, project collaboration and the roll-up of the various projects in a program and or a portfolio.

### Claim 2 (depends on 1)

The system of claim 1, wherein final data is calculated on the server and shared with project team members over the network.

### Claim 3 (depends on 1)

The system of claim 1, wherein the server stores data in the central database for monitoring multiple projects or programs, regardless of their stage in the life cycle.

### Claim 4 (depends on 1)

The system of claim 1, wherein the server stores data relating to planning, design, construction, operation, maintenance, inspection, testing laboratories and various processes and manufactured construction materials real time on the project cost, schedule, and quality assurance.

### Claim 5 (depends on 1)

The system of claim 1, wherein the status of a given project activity quality can be determined in real time and be shared among all project team members.

### Claim 6 (depends on 1)

The system of claim 1, comprising a integrated project management module coupled to a centralized database.

### Claim 7 (depends on 6)

The system of claim 6, comprising:
a document control system;
an accounting system;
a scheduling system; and
a geographical information system (GIS).

### Claim 8 (depends on 6)

The system of claim 6, comprising a planning module, a design module, a construction module, a maintenance module, and an operations module.

### Claim 9 (depends on 6)

The system of claim 6, comprising an audit module, an estimating/scheduling module, an inspection module, and a testing module.

### Claim 10 (depends on 1)

The system of claim 1, wherein the database captures actual final measurement (AFM).

### Claim 11 (depends on 1)

The system of claim 1, wherein the statistics and engineering methods comprise aggregate, asphalt, concrete and soil tests and all types of construction materials.

### Claim 12 (depends on 1)

The system of claim 1, comprising a plurality of pre-formatted forms stored in the mobile computer.

### Claim 13 (depends on 12)

The system of claim 12, comprising a field engineering form to capture a cost, a schedule, labor, equipment and a quantity.

### Claim 14 (depends on 12)

The system of claim 12, comprising an inspector form to capture a work activity, a daily report and a “checklist” designed with consideration of required standards, indexing logs and consideration of best practices installation report.

### Claim 15 (depends on 12)

The system of claim 12, comprising a tester form to capture laboratory and field test data.

### Claim 16

The system of claim one receive information form the construction schedule and activity log to forecast and dispatch human and mechanical equipment needs to insure field activities and compliance is logged using mobile devices.

### Claim 17 (depends on 1)

The system of claim 1, wherein the database stores GIS and GPS data along with AIM data or human generated field data, and calculated or generated AFD or reports.

### Claim 18 (depends on 1)

The system of claim 1, AIM data resulting from audits, engineered workmanship checklist and test data sheets are calculated in the web server, systematically logged and retrievable through the use of GIS maps and viewed in 3D.

### Claim 19 (depends on 1)

The system of claim 1, provides real time AIM data thereby allowing the designers to modify their original designs based on actual field conditions

### Claim 20 (depends on 1)

The system of claim 1, wherein the server runs a preventative systematic checklist to minimize the length of a punch list or a list of non-compliant items therefore facilitating the project commissioning.

### Claim 21 (depends on 1)

The system of claim 1, wherein the checklist is formatted on a mobile device to facilitate a rollup of field data and other sources of data occurring throughout the construction team, one or more site offices, and one or more project locations.