# US 2013/0253671 A1 · Process control system

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2013/0253671 A1
- Document ID: US20130253671A1
- Status: Published application
- Kind: A1
- Application number: 13/827,634
- Filed: 2013-03-14
- Published: 2013-09-26
- Earliest claimed: 2012-03-23
- Assignees: Yokogawa Electric Corporation
- Applicants: Yokogawa Electric Corporation
- Inventors: Kenji Torigoe
- Web page: https://patentgrep.com/patent/US20130253671A1

## CPC

- G05B 15/02: electric
- G05B 19/0421: {Multiprocessor system}
- G06F 11/1482: using middleware or operating system [OS] functionalities
- G06F 11/20: using active fault-masking, e.g. by switching out faulty elements or by switching in spare elements
- G06F 11/2007: {using redundant communication media}
- G06F 11/2038: {with a single idle spare processing component}
- G06F 11/2097: {maintaining the standby controller/processing unit updated (initialisation or re-synchronisation thereof G06F11/1658 and subgroups)}
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)

## Abstract

A process control system performing control of an industrial process implemented in a plant, may include: a network provided in the plant; a plurality of field devices connected to the network, each of the plurality of field devices is configured to perform at least one of measurement and actuation required for control of the industrial process; and a controller, connected to the network, having a virtual part configured to operate in hardware in place of hardware, and a control unit configured to operate in the virtual part and to control operations of the field devices via the network, the controller being configured to enable replacement of hardware without changing the control unit.

## Claims

### Claim 1

A process control system performing control of an industrial process implemented in a plant, the process control system comprising:
a network provided in the plant;
a plurality of field devices connected to the network, each of the plurality of field devices is configured to perform at least one of measurement and actuation required for control of the industrial process; and
a controller, connected to the network, having a virtual part configured to operate in hardware in place of hardware, and a control unit configured to operate in the virtual part and to control operations of the field devices via the network, the controller being configured to enable replacement of hardware without changing the control unit.

### Claim 2 (depends on 1)

The process control system according to claim 1, wherein the virtual part is a hypervisor.

### Claim 3 (depends on 1)

The process control system according to claim 1, wherein at least two of the controllers are provided and operate redundantly.

### Claim 4 (depends on 1)

The process control system according to claim 1, further comprising:
input/output nodes connecting to the network, the input/output nodes being configured to relay a signal input/output at the field devices and a signal communicated via the network.

### Claim 5 (depends on 1)

The process control system according to claim 1, further comprising:
a spare controller connecting to the network, the spare controller having a virtual part configured to be capable of causing operation of a control unit that is the same as a control unit provided in a controller in which a failure has occurred.

### Claim 6 (depends on 1)

The process control system according to claim 1, wherein the control unit has an operating system that runs in the virtual part and an application that runs in the operating system.

### Claim 7 (depends on 3)

The process control system according to claim 3, wherein the network is made redundant.

### Claim 8 (depends on 3)

The process control system according to claim 3, wherein the control unit has an operating system that runs in the virtual part and an application that runs in the operating system, and the process control system further comprises:
a monitoring apparatus configured to monitor and manage an operating status of the operating system and the applications running in the controller so that the application in a controller in a standby status can be stopped, transfer being made to another controller that is idling and, after reaching synchronization with a currently used controller, redundant operation being started.

### Claim 9 (depends on 6)

The process control system according to claim 6, wherein,
when replacing an old hardware to a new hardware, a program implementing the virtual part is first installed into the new hardware so as to implement a functionality of the virtual part, and next, a program implementing the operating system and a program implementing the application that had been used previously in the old hardware are installed into the new hardware, so as to implement a functionality of the operating system and a functionality of the application, so that a previously used operating system and application can be run on the new hardware.

### Claim 10 (depends on 6)

The process control system according to claim 6, wherein,
when replacing an old hardware to a new hardware, installing software into the new hardware is performed beforehand and the new hardware subjected to this installing is then brought on-site so that it is possible to limit tasks performed on-site to a replacement of the hardware.

### Claim 11 (depends on 7)

The process control system according to claim 7, wherein
the network includes a first network and a second network, and
the process control system further comprising:
input/output nodes connecting to the first network and the second network, the input/output nodes being configured to relay a signal input/output at the field devices and a signal communicated via the first network and the second network.

### Claim 12 (depends on 11)

The process control system according to claim 11, wherein
the control unit has an operating system that runs in the virtual part and an application that runs in the operating system, and
the process control system further comprising:
a monitoring apparatus configured to monitor and manage an operating status of the operating system and the applications running in the controller so that the application in a controller in a standby status can be stopped, transfer being made to another controller that is idling and, after reaching synchronization with a currently used controller, redundant operation being started.

### Claim 13 (depends on 12)

The process control system according to claim 12, wherein:
when an old controller is replaced by a new controller, first the virtual part provided in the new controller accesses the monitoring apparatus regarding the controller to which synchronization is to be done;
when notification is made as to the controller to which synchronization is to be done, the virtual part of the new controller communicates with the virtual part of the notified controller to which synchronization is to be done, and decides a synchronized operation starting time that is a starting point for synchronized operation;
the virtual part of the new controller goes into a state of waiting for an arrival of the synchronized operation starting time; and
when the synchronized operation starting time arrives, the virtual part of the controller to which synchronization is to be done transmits execution information to the virtual part of the new controller and, based on the execution information, the virtual part of the new controller starts synchronized operation.

### Claim 14

A process control method for controlling an industrial process implemented in a plant, by using a process control system comprising:
a network provided in the plant;
a plurality of field devices connected to the network, each of the plurality of field devices is configured to perform at least one of measurement and actuation required for control of the industrial process; and
a controller, connected to the network, having a hypervisor configured to operate in hardware in place of hardware, and a control unit configured to operate in the hypervisor and to control operations of the field devices via the network, the control unit having an operating system that runs in the hypervisor and an application that runs in the operating system, the controller being configured to enable replacement of hardware without changing the control unit,
the process control method comprising a step of replacing an old hardware to a new hardware, the step including:
installing a program implementing the hypervisor into the new hardware so as to implement a functionality of the hypervisor; and
installing a program implementing the operating system and a program implementing the application that had been used previously in the old hardware into the new hardware, so as to implement a functionality of the operating system and a functionality of the application.

### Claim 15 (depends on 14)

The process control method according to claim 14, wherein at least two of the controllers are provided and operate redundantly, and the process control method further comprises:
accessing, by the hypervisor provided in the new controller, a monitoring apparatus regarding the controller to which synchronization is to be done when an old controller is replaced by a new controller;
communicating, by the hypervisor of the new controller, with the hypervisor of the notified controller to which synchronization is to be done, and deciding a synchronized operation starting time that is a starting point for synchronized operation when notification is made as to the controller to which synchronization is to be done;
going, by the hypervisor of the new controller, into a state of waiting for an arrival of the synchronized operation starting time;
transmitting, by the hypervisor of the controller to which synchronization is to be done, execution information to the hypervisor of the new controller when the synchronized operation starting time arrives; and
starting, by the hypervisor of the new controller, synchronized operation based on the execution information.
