# US 2013/0219821 A1 · Method of assembling a tubular building structure by using screw sockets

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2013/0219821 A1
- Document ID: US20130219821A1
- Status: Published application
- Kind: A1
- Application number: 13/810,167
- Filed: 2011-07-04
- Published: 2013-08-29
- Earliest claimed: 2010-07-13
- Assignees: Andresen Towers A/S
- Inventors: Tom Andresen
- Web page: https://patentgrep.com/patent/US20130219821A1

## CPC

- E04H 12/342: {Arrangements for stacking tower sections on top of each other (E04H12/344 takes precedence)}
- E04H 12/00: Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures (cooling towers E04H5/12; derricks for oil drilling E21B15/00)
- E04H 12/08: of metal
- E04H 12/34: Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
- F03D 13/20: Arrangements for mounting or supporting wind motors; Masts or towers for wind motors
- F05B 2240/912: on a tower
- Y02B 10/30: Wind power
- Y02E 10/72: Wind turbines with rotation axis in wind direction
- Y02E 10/728: Onshore wind turbines
- Y02P 70/50: Manufacturing or production processes characterised by the final manufactured product
- Y02P 80/20: using renewable energy
- Y10T 29/49623: Static structure, e.g., a building component
- Y10T 29/49631: Columnar member
- E04H: BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL (foundations E02D)
- F03D: WIND MOTORS
- F05B: INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
- Y02B: CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02P: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y10T: TECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION

## Abstract

A method of assembling a tubular building structure 1 comprising a circumferential wall structure formed from a plurality of wall elements 2,20. The method comprises mutually assembling at least some of the wall elements 2,20 by use of screw sockets 4 mounted in holes in the wall elements 2,20 and bolts. The wall elements may be superposed tube sections 2 arranged on top of each other, and these tube sections 2_may be formed by interconnecting axially extending tube segments 20. In some embodiments of the invention, the screw sockets 4 are mounted at the manufacturing site, and the wall elements 2,20 are subsequently transported to the erection site of the tubular building structure 1. Preferably the mutual assembly of the wall elements 2,20 is performable solely by people working inside the tubular building structure 1 fastening the bolts 5 to the pre-mounted screw sockets 4.

## Claims

### Claim 1

A method of assembling a tubular building structure comprising a circumferential wall structure formed from a plurality of wall elements, the method comprising mutually assembling at least some of the wall elements by use of screw sockets mounted in holes in the wall elements and bolts which are screwed into the screw sockets to perform the assembly.

### Claim 2 (depends on 1)

A method according to claim 1, wherein the wall elements are made from plate material, such as from steel plate.

### Claim 3 (depends on 1)

A method according to claim 1, wherein at least some of the wall elements are superposed tube sections, the method comprising arranging the tube sections on top of each other.

### Claim 4 (depends on 1)

A method according to claim 1, wherein at least some of the wall elements are axially extending tube segments.

### Claim 5 (depends on 4)

A method according to claim 4, the method comprising interconnecting the tube segments along opposite longitudinal sides by use of screw sockets mounted in holes in the tube segments and bolts which are screwed into the screw sockets to perform the assembly.

### Claim 6 (depends on 1)

A method according to claim 1, wherein the screw sockets are mounted in the wall elements at the manufacturing site, and wherein the wall elements are subsequently transported to the erection site of the tubular building structure.

### Claim 7 (depends on 1)

A method according to claim 1, the method comprising:
a first surface treatment of at least an exterior of the wall elements,
insertion of the screw sockets into holes in the wall elements, and
a second surface treatment of at least the exterior of the wall elements with the screw sockets inserted therein.

### Claim 8 (depends on 7)

A method according to claim 7, wherein the first surface treatment is selected from one or more of the following processes: galvanizing, such as hot dip galvanizing, powder coating and wet paint system.

### Claim 9 (depends on 7)

A method according to claim 7, wherein the second surface treatment comprises application of a coating.

### Claim 10 (depends on 1)

A method according to claim 1, wherein at least some of the screw sockets each comprises a serrated circumferential surface adapted to provide frictional resistance against rotation of the screw socket after mounting.

### Claim 11 (depends on 1)

A method according to claim 1, wherein the screw sockets are mounted by one or more of press fit, magnets or adhesive.

### Claim 12 (depends on 1)

A method according to claim 1, wherein the mutual assembly of the wall elements is performable solely by people working inside the tubular building structure fastening the bolts to the mounted screw sockets.

### Claim 13 (depends on 1)

A method according to claim 1, wherein the tubular building structure is a wind turbine tower comprising a bedframe, the method further comprising mounting the bedframe by use of screw sockets and bolts.

### Claim 14 (depends on 1)

A wind turbine tower assembled by a method according to claim 1.

### Claim 15 (depends on 9)

A method according to claim 9, wherein the coating is one or more of lacquer, powder coating, or a wet paint system.