# US 2013/0206547 A1 · Excavator dump range extender

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2013/0206547 A1
- Document ID: US20130206547A1
- Status: Published application
- Kind: A1
- Application number: 13/882,148
- Filed: 2011-10-27
- Published: 2013-08-15
- Earliest claimed: 2010-10-27
- Assignees: ThyssenKrupp Robins, Inc.
- Inventors: Martin S. Lurie
- Web page: https://patentgrep.com/patent/US20130206547A1

## CPC

- B65G 47/18: Arrangements or applications of hoppers or chutes
- B65G 65/04: with pick-up shovels (constructions of shovels E02F)
- E02F 5/26: Combined conveying-bridges and dredgers
- E02F 7/00: Equipment for conveying or separating excavated material (barges adapted for carrying-away material from floating dredgers B63B35/28)
- B65G: TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS (packaging B65B; handling thin or filamentary materials, e.g. paper sheets or thread, B65H; cranes B66C; portable mobile or lifting or hauling appliances, e.g. hoists, B66D; devices for lifting or lowering goods for loading or unloading purposes, e.g. fork-lift trucks, B66F9/00; emptying bottles, jars, casks, barrels or similar containers, not otherwise provided for, B67C9/00; delivering or transferring liquids B67D; filling or discharging vessels for liquefied, solidified or compressed gases F17C; pipe-line systems for fluids F17D)
- E02F: DREDGING; SOIL-SHIFTING (winning peat E21C49/00)

## Abstract

A material handling machine for transferring discrete loads of excavated, uncrushed waste from an excavator or other excavation equipment to a dumping location beyond the reach of the excavator. The material handling machine may include a mobile bridge supported by two or more crawlers. The material handling machine may further include at least one skip that is selectively moved between a first end and a second end of the mobile bridge. The at least one skip may receive material from excavation equipment at the first end and deposit the received material proximate the second end. When the material handling machine includes two skips, one skip may be positioned above the other skip, or the skips may be positioned to be side-by-side.

## Claims

### Claim at position 1

-38. (canceled)

### Claim 39

A method of operating equipment in an excavation, comprising:
excavating uncrushed material from a site using excavation equipment;
at a first end of a mobile bridge, transferring the uncrushed material from the excavation equipment to a conveyance mechanism supported on the mobile bridge, wherein the step of transferring the uncrushed material from the excavation equipment to the conveyance mechanism comprises transferring the uncrushed material from the excavation equipment to a transfer chute positioned at the first end of the mobile bridge, and then transferring, at a controlled rate, the uncrushed material from the transfer chute to the conveyance mechanism;
moving the conveyance mechanism loaded with the uncrushed material from the first end of the mobile bridge to a second end of the mobile bridge that is distal the first end of the mobile bridge; and
unloading the uncrushed material from the conveyance mechanism proximate the second end of the mobile bridge.

### Claim 40 (depends on 39)

The method of claim 39, wherein the conveyance mechanism comprises a first skip.

### Claim 41

(canceled)

### Claim 42 (depends on 40)

The method of claim 40, further comprising transferring uncrushed material to a second skip supported on a mobile bridge at the first end of the mobile bridge; moving the second skip loaded with the uncrushed material from the first end of the mobile bridge to the second end of the mobile bridge; and unloading the uncrushed material from the second skip proximate the second end of the mobile bridge, wherein the first skip is unloaded closer to the second end of the mobile bridge than the second skip.

### Claim 43

(canceled)

### Claim 44 (depends on 40)

The method of claim 40, wherein the step of unloading the uncrushed material further includes directly unloading the uncrushed material from the first skip into a truck positioned proximate the second end of the mobile bridge.

### Claim 45 (depends on 44)

The method of claim 44, wherein the truck is located at either a higher or a lower bench than the excavation equipment.

### Claim 46 (depends on 39)

The method of claim 39, wherein the uncrushed material that is excavated by the excavation equipment is located at a face that is at an obtuse angle relative to a high wall of the site, and a longitudinal axis the mobile bridge starts substantially parallel to the face and the second end of the mobile bridge swings away from the face to deposit uncrushed material at the second end of the mobile bridge in an arc as excavation progresses along the face.

### Claim 47 (depends on 39)

The method claim 39, wherein the first end of the mobile bridge is located at an upper bench of the site, the second end of the mobile bridge is located proximate a mined out area of the site that is at a lower elevation than the upper bench, and the uncrushed material is unloaded from the second end of the mobile bridge into the mined out area.

### Claim 48 (depends on 39)

The method of claim 39, wherein the first end of the mobile bridge is located proximate a lowest bench of the site, the mobile bridge spans over a mined out area of the site, and unloading the uncrushed material from the second end of the mobile bridge creates a lowest waste bench.

### Claim 49 (depends on 48)

The method of claim 48, wherein the lowest bench and the lowest waste bench are spaced a sufficient distance apart to allow for mineral-extraction operations on a floor of the site where the floor of the site is located between the lowest bench and the lowest waste bench.

### Claim at position 13

-51. (canceled)

### Claim 52 (depends on 39)

The method of claim 39, wherein the conveyor conveyance mechanism comprises an apron conveyor or an armored conveyor.

### Claim 53 (depends on 52)

The method of claim 52, wherein the transfer chute includes a latching door with a curved back, and the latching door is further configured to allow loads from the excavation equipment to be contained within the transfer chute for a select period of time before delivering the loads from the transfer chute to the conveyor.

### Claim 54

A material handling apparatus comprising:
a mobile bridge including a first end and a second end distal the first end;
a conveyance mechanism operatively joined to the mobile bridge and configured to move materials between the first end and the second end of the mobile bridge; and
a transfer chute positioned proximate the first end of the mobile bridge and configured to transfer a load to the conveyance mechanism at a controlled rate.

### Claim 55 (depends on 54)

The material handling apparatus of claim 54, wherein the conveyor conveyance mechanism comprises an apron conveyor or an armored conveyor.

### Claim 56 (depends on 54)

The material handling apparatus of claim 54, wherein the transfer chute includes a latching door with a curved back, and the latching door is configured to be selectively opened to allow finer material to be delivered from the transfer chute to the conveyance mechanism before allowing larger material to be delivered from the transfer chute to the conveyance mechanism.

### Claim 57

(canceled)

### Claim 58 (depends on 56)

The material handling apparatus of claim 56, wherein the latching door is further configured to allow loads from an excavator to be contained within the transfer chute for a select period of time before delivering the loads from the transfer chute to the conveyance mechanism.

### Claim 59

The material handling apparatus of claim of 54, wherein the conveyance mechanism comprises a conveyor, and a conveyor belt of the conveyor is supported on wheeled carts that travel on rails that are supported by the mobile bridge.

### Claim 60 (depends on 54)

The material handling system of claim 54, wherein the conveyance mechanism comprises a first skip operatively joined to the mobile bridge and configured for selective positioning between the first end and the second end of the mobile bridge, and the transfer chute transfers the load to the first skip when the first skip is positioned proximate the first end of the mobile bridge.

### Claim 61 (depends on 60)

The material handling apparatus of claim 60, further comprising a winding system operatively associated with the first skip and configured to move the first skip between the first and second ends of the mobile bridge, and the winding system further including flexible members that are joined to the first skip and that are positioned outside of a spatial envelope traversed by the first skip.

### Claim 62 (depends on 54)

The material handling apparatus of claim 54, wherein the mobile bridge includes a foot element that supports the mobile bridge at the first end of the mobile bridge, a linkage assembly that joins the transfer chute to the foot element and to the mobile bridge, and a hydraulic cylinder operatively associated with the foot element to move the foot element between a raised position and a lowered position; and the linkage assembly is configured to shield the hydraulic cylinder from transmitting dumping energy that is transferred to the ground through the foot element when loads are deposited from an excavator onto the transfer chute.

### Claim 63 (depends on 54)

The material handling apparatus of claim 54, wherein the transfer chute includes a shock absorber that at least partially supports the transfer chute, and the shock absorber is joined to a foot element in such a manner that dumping energy that arises from loading the transfer chute with an excavator is primarily directly transferred from the transfer chute to the ground via the foot member.