Managing a project during transition
AssigneeTata Consultancy Services Limited
InventorVenkatarama Kothanda Raman
Life of this patent
Estimating the term…
Abstract
A method and a system for managing a project during transition are provided. The system comprises a processor, an interface, and a memory coupled to the processor. The system receives a request for initiating the project through the interface. The memory comprises a back end module and a front end module. The back end module is configured to create a standard project workspace and a standard project plan upon receiving the request to initiating the project. The front end module is configured to generate in real time one or more status reports of the project for various stakeholders. These status reports are based on the standard project plan.
Claims20
A system for managing a project during transition, the system comprising:
- a processor;
- an interface to receive a request to initiate the project;
- and
- a non-transitory memory coupled to the processor, wherein the memory comprises processor executable instructions that include:
- a back end module configured to automatically cause the processor to create, upon receiving the request to initiate the project, a standard project workspace for storing project documents and a standard project plan listing a plurality of predefined activities and a plurality of predefined deliverables for each of a plurality of stages of the project, wherein the standard project plan defines at least one tollgate for transition from one stage of the project to another stage;
- and
- a front end module configured to cause the processor to generate in real time a plurality of status reports of the project for a plurality of stakeholders, wherein the plurality of status reports of the project are based on the standard project plan.
A method for managing a project during transition, the method comprising:
- receiving a request to initiate a project;
- creating, automatically, based on the request, a standard project workspace for storing project documents and a standard project plan listing a plurality of predefined activities and a plurality of predefined deliverables for each of a plurality of stages of the project, wherein the standard project plan defines at least one tollgate for transition from a previous stage of the project to a next stage of the project;
- and
- generating in real time a plurality of status reports of the project for a plurality of stakeholders, wherein the plurality of status reports of the project are based on the standard project plan generating in real time a status report of the project.
A computer readable medium having embodied thereon a computer program for executing a method for managing a project during transition, the method comprising:
- receiving a request to initiate a project;
- creating, automatically based on the request, a standard project workspace for storing project documents and a standard project plan listing a plurality of predefined activities and a plurality of predefined deliverables for each of a plurality of stages of the project, wherein the standard project plan defines at least one tollgate for transition from a previous stage of the project to a next stage of the project;
- and
- generating in real time a plurality of status reports of the project for a plurality of stakeholders, wherein the plurality of status reports of the project are based on the standard project plan generating in real time a status report of the project.
Dependencies are inferred from the claim text.