# US 2013/0159242 A1 · Performing what-if analysis

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2013/0159242 A1
- Document ID: US20130159242A1
- Status: Published application
- Kind: A1
- Application number: 13/818,677
- Filed: 2010-09-01
- Published: 2013-06-20
- Earliest claimed: 2010-09-01
- Assignees: Hewlett-Packard Development Company, L.P.
- Inventors: Maher Rahmouni; Marianne Hickey; Claudio Bartolini; Andrew Byde
- Web page: https://patentgrep.com/patent/US20130159242A1

## CPC

- G06N 5/048: Fuzzy inferencing
- G06Q 10/06313: {Resource planning in a project environment}
- G06N: COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR

## Abstract

Information relating to project metric data and occurrence of events in a plurality of projects is received (102). Uncertainty data is determined (106) based on the received information, where the uncertainty data represents a probability distribution of at least one metric associated with the active project. Input relating to a scenario to perform what-if analysis is received (108), and based on the input, what-if analysis is performed (110).

## Claims

### Claim 1

A method comprising:
receiving (102), by a computer system, information relating to project metric data and the occurrence of events in a plurality of projects;
determining (106), by the computer system, uncertainty data based on the received information, wherein the uncertainty data represents a probability distribution of at least one metric associated with the active project;
receiving (108), by the computer system, input relating to a scenario to perform what-if analysis; and
based on the input, performing (110), by the computer system, the what-if analysis to determine an estimated impact of a particular event specified in the input scenario on the active project and on the uncertainty data.

### Claim 2 (depends on 1)

The method of claim 1, further comprising:
for a given time period in the active project, identify events in a corresponding given time period of each of the plurality of projects of the received information; and
determining, based on the identified events in the corresponding given time period of each of the plurality of projects, the likelihood of the particular event occurring and the likely impact of the particular event.

### Claim 3 (depends on 2)

The method of claim 2, wherein the particular event is of a particular type, and wherein identifying the events comprises identifying the events of the particular type in the corresponding given time period of each of the plurality of projects.

### Claim 4 (depends on 3)

The method of claim 3, wherein determining the likelihood of the particular event occurring in the given time period of the active project comprises determining the likelihood of the particular event occurring based on a total number of times events of the particular type occur in the given time period of the plurality of projects.

### Claim 5 (depends on 3)

The method of claim 3, wherein determining the likely impact of the particular event on the active project in the given time period is based on impact values associated with the events of the particular type in the given time period of the plurality of projects.

### Claim 6 (depends on 1)

The method of claim 1, wherein determining the uncertainty data is based on calculating differences between actual values and estimated values of the at least one metric in the plurality of projects of the received information.

### Claim 7 (depends on 6)

The method of claim 6, further comprising:
providing a first vector representing estimated values of the at least one metric for the plurality of projects;
providing a second vector representing actual values of the at least one metric for the plurality of projects;
computing a result vector based on a difference between the first and second vectors, wherein the result vector contains values corresponding to the differences between the actual values and the estimated values of the at least one metric in the plurality of projects.

### Claim 8 (depends on 7)

The method of claim 7, wherein the first vector represents the estimated values of the at least one metric in a given time period of the plurality of projects, and the second vector represents the actual values of the at least one metric in a given time period of the plurality of projects.

### Claim 9 (depends on 1)

The method of claim 1, further comprising presenting a graph of the probability distribution in a user interface.

### Claim 10

An article comprising at least one computer-readable storage medium storing instructions that upon execution cause a computer system to:
identify (408), for an active project, a plurality of past projects related to the active project;
calculate (414, 416), based on information associated with the plurality of past projects, likelihood of occurrence of a particular type of event and a likely impact of the particular type of event;
calculate (506), based on the information associated with the plurality of past projects, uncertainty data related to at least one metric of the active project; and
estimate (508), as part of what-if analysis, an impact of the particular type of event as specified in an input scenario on the uncertainty data.

### Claim 11 (depends on 10)

The article of claim 10, wherein the instructions upon execution cause the computer system to further:
generate a user interface representation including elements corresponding to multiple active projects, wherein the user interface representation further includes information relating to likely impact of the particular type of event on each of the multiple active projects.

### Claim 12 (depends on 11)

The article of claim 11, wherein the user interface representation further includes user-selectable elements corresponding to the multiple active projects, wherein the instructions upon execution cause the computer system to further:
receive selection or deselection of the corresponding user-selectable elements that indicate which of the multiple active projects have been user selected to include in a portfolio based on the information relating to likely impact of the particular type of event on each of the multiple active projects.

### Claim 13 (depends on 10)

The article of claim 10, wherein the particular type of event is part of a user input scenario, and wherein the user input scenario is provided through a user interface in which a user is able to select or deselect events or to manually add or edit events.

### Claim 14 (depends on 10)

The article of claim 10, wherein calculating the uncertainty data comprises calculating a probability distribution.

### Claim 15

A computer system comprising:
a storage media (608) to store information relating to a plurality of past projects, wherein the information includes a plurality of events in each of the past projects; and
at least one processor (606) configured to:
based on the events of the past projects in a particular time period of each of the past projects, determine a likelihood of a particular event occurring in the particular time period of an active project, and a likely impact of the particular event on the active project in the particular time period;
determine uncertainty data based on differences between estimated metric data and actual metric data of the past projects, wherein the uncertainty data represents a probability distribution of at least one metric associated with the active project;
determine an estimated impact of a particular event in an input scenario on the probability distribution as part of the what-if analysis; and
generate a modified probability distribution based on the estimated impact.