# US 2013/0158954 A1 · Method and system for optimizing the configuration of a solar power system

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2013/0158954 A1
- Document ID: US20130158954A1
- Status: Published application
- Kind: A1
- Application number: 13/327,549
- Filed: 2011-12-15
- Published: 2013-06-20
- Earliest claimed: 2011-12-15
- Assignees: Sunrun Inc.
- Inventors: Gary WAYNE; Billy HINNERS
- Web page: https://patentgrep.com/patent/US20130158954A1

## CPC

- G06F 30/20: Design optimisation, verification or simulation (optimisation, verification or simulation of circuit designs G06F30/30)
- G06F 30/00: Computer-aided design [CAD]
- G06F 2119/06: Power analysis or power optimisation
- Y02E 60/00: Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
- Y04S 40/20: Information technology specific aspects, e.g. CAD, simulation, modelling, system security
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y04S: SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS

## Abstract

An optimization engine determines the optimal configuration for a solar power system by simulating the performance of different solar module arrays projected onto a target surface. The optimization engine selects the optimally-performing solar module array and then simulates the performance of additional solar module subarrays projected onto various regions of the target surface not already covered by the optimally-performing solar module array. The optimal configuration includes the optimally-performing solar module array and one or more optimally-performing solar module subarrays.

## Claims

### Claim 1

A computer-implemented method for determining a configuration of a solar power system, the method comprising:
projecting a first plurality of solar module arrays onto a target surface;
identifying a first solar module array within the first plurality of solar module arrays that has an optimal performance estimate relative to the other solar module arrays in the first plurality of a solar module arrays;
projecting a first plurality of solar module subarrays onto regions of the target surface not covered by the first solar module array; and
identifying a first solar module subarray within the first plurality of solar module subarrays that has an optimal performance estimate relative to the other solar module subarrays in the first plurality of solar module subarrays,
wherein the configuration of the solar power system comprises at least the first solar module array and the first solar module subarray.

### Claim 2 (depends on 1)

The computer-implemented method of claim 1, wherein projecting the first plurality of solar module arrays onto the target surface comprises:
projecting a tile grid onto the target surface that comprises an array of rectangular tiles;
culling tiles from the tile grid that do not meet a set of tile construction requirements to produce a first set of tiles;
generating a performance estimate for each tile in the first set of tiles;
culling tiles in the first set of tiles that do not meet a set of tile performance requirements to produce a second set of tiles;
identifying a region of contiguous tiles within the second set of tiles; and
projecting the first plurality of solar module arrays onto the region of contiguous tiles.

### Claim 3 (depends on 1)

The computer-implemented method of claim 1, wherein identifying the first solar module array within the first plurality of solar module arrays comprises:
projecting a solar module grid onto the target surface that comprises an array of rectangular solar modules;
culling solar modules from the solar module grid that do not meet a set of solar module construction requirements to produce a first set of solar modules;
identifying one or more arrays of contiguous solar modules in the first set of solar modules;
generating a performance estimate for each array of the one or more arrays of contiguous solar modules; and
identifying the first solar module array within the one or more arrays of contiguous solar modules as having an optimal performance estimate relative to the other solar module arrays in the one or more arrays of contiguous solar modules.

### Claim 4 (depends on 1)

The computer-implemented method of claim 1, wherein projecting the first plurality of solar module subarrays onto regions of the target surface not covered by the first solar module array comprises:
receiving a set of tiles that represents at least a portion of the target surface;
excluding tiles associated with the first solar module array from additional processing to create a first subset of tiles;
culling tiles from the first subset of tiles that do not meet a set of tile construction requirements to produce a second subset of tiles;
identifying a subregion of contiguous tiles within the second subset of tiles; and
projecting the first plurality of solar module subarrays onto the subregion of contiguous tiles.

### Claim 5 (depends on 1)

The computer-implemented method of claim 1, wherein identifying the first solar module subarray within the first plurality of solar module subarrays comprises:
projecting a solar module subgrid onto the target surface that comprises an array of rectangular solar modules;
culling solar modules from the solar module subgrid that do not meet a set of solar module construction requirements to produce a first subset of solar modules;
identifying one or more subarrays of contiguous solar modules in the first subset of solar modules;
generating a performance estimate for each subarray of the one or more subarrays of contiguous solar modules; and
identifying the first solar module subarray within the one or more subarrays of contiguous solar modules as having an optimal performance estimate relative to the other solar module subarrays in the one or more subarrays of contiguous solar modules.

### Claim 6 (depends on 1)

The computer-implemented method of claim 1, wherein the performance estimate generated for a solar module array in the first plurality of solar module arrays or a solar module subarray in the first plurality of solar module subarrays is based on one or more of (i) a location and/or orientation of the target surface, (ii) a solar module type within the solar module array or solar module subarray, (iii) a utility rate corresponding to the location of the target surface, (iv) an amount of irradiance and/or net shading associated with each solar module within the solar module array or solar module subarray, (v) historical weather data, (vi) power flow simulators that account for module electrical wiring and topology.

### Claim 7 (depends on 1)

The computer-implemented method of claim 1, wherein each of the solar modules included within the first solar module array or the first solar module subarray is disposed according to either a landscape orientation or a portrait orientation.

### Claim 8

A non-transitory computer-readable medium storing program instructions that, when executed by a processing unit, cause the processing unit to determine a configuration of a solar power system by performing the steps of:
projecting a first plurality of solar module arrays onto a target surface;
identifying a first solar module array within the first plurality of solar module arrays that has an optimal performance estimate relative to the other solar module arrays in the first plurality of a solar module arrays;
projecting a first plurality of solar module subarrays onto regions of the target surface not covered by the first solar module array; and
identifying a first solar module subarray within the first plurality of solar module subarrays that has an optimal performance estimate relative to the other solar module subarrays in the first plurality of solar module subarrays,
wherein the configuration of the solar power system comprises at least the first solar module array and the first solar module subarray.

### Claim 9 (depends on 8)

The non-transitory computer-readable medium of claim 8, wherein the step of projecting the first plurality of solar module arrays onto the target surface comprises:
projecting a tile grid onto the target surface that comprises an array of rectangular tiles;
culling tiles from the tile grid that do not meet a set of tile construction requirements to produce a first set of tiles;
generating a performance estimate for each tile in the first set of tiles;
culling tiles in the first set of tiles that do not meet a set of tile performance requirements to produce a second set of tiles;
identifying a region of contiguous tiles within the second set of tiles; and
projecting the first plurality of solar module arrays onto the region of contiguous tiles.

### Claim 10 (depends on 8)

The non-transitory computer-readable medium of claim 8, wherein the step of identifying the first solar module array within the first plurality of solar module arrays comprises:
projecting a solar module grid onto the target surface that comprises an array of rectangular solar modules;
culling solar modules from the solar module grid that do not meet a set of solar module construction requirements to produce a first set of solar modules;
identifying one or more arrays of contiguous solar modules in the first set of solar modules;
generating a performance estimate for each array of the one or more arrays of contiguous solar modules; and
identifying the first solar module array within the one or more arrays of contiguous solar modules as having an optimal performance estimate relative to the other solar module arrays in the one or more arrays of contiguous solar modules.

### Claim 11 (depends on 8)

The non-transitory computer-readable medium of claim 8, wherein the step of projecting the first plurality of solar module subarrays onto regions of the target surface not covered by the first solar module array comprises:
receiving a set of tiles that represents at least a portion of the target surface;
excluding tiles associated with the first solar module array from additional processing to create a first subset of tiles;
culling tiles from the first subset of tiles that do not meet a set of tile construction requirements to produce a second subset of tiles;
identifying a subregion of contiguous tiles within the second subset of tiles; and
projecting the first plurality of solar module subarrays onto the subregion of contiguous tiles.

### Claim 12 (depends on 8)

The non-transitory computer-readable medium of claim 8, wherein the step of identifying the first solar module subarray within the first plurality of solar module subarrays comprises:
projecting a solar module subgrid onto the target surface that comprises an array of rectangular solar modules;
culling solar modules from the solar module subgrid that do not meet a set of solar module construction requirements to produce a first subset of solar modules;
identifying one or more subarrays of contiguous solar modules in the first subset of solar modules;
generating a performance estimate for each subarray of the one or more subarrays of contiguous solar modules; and
identifying the first solar module subarray within the one or more subarrays of contiguous solar modules as having an optimal performance estimate relative to the other solar module subarrays in the one or more subarrays of contiguous solar modules.

### Claim 13 (depends on 8)

The non-transitory computer-readable medium of claim 8, wherein the performance estimate generated for a solar module array in the first plurality of solar module arrays or a solar module subarray in the first plurality of solar module subarrays is based on one or more of (i) a location and/or orientation of the target surface, (ii) a solar module type within the solar module array or solar module subarray, (iii) a utility rate corresponding to the location of the target surface, (iv) an amount of irradiance and/or net shading associated with each solar module within the solar module array or solar module subarray, (v) historical weather data, (vi) power flow simulators that account for module electrical wiring and topology.

### Claim 14 (depends on 8)

The non-transitory computer-readable medium of claim 8, wherein each of the solar modules included within the first solar module array or the first solar module subarray is disposed according to either a landscape orientation or a portrait orientation.

### Claim 15

A computing device configured to determine a configuration of a solar power system, comprising:
a processing unit configured to:
project a first plurality of solar module arrays onto a target surface;
identify a first solar module array within the first plurality of solar module arrays that has an optimal performance estimate relative to the other solar module arrays in the first plurality of a solar module arrays;
project a first plurality of solar module subarrays onto regions of the target surface not covered by the first solar module array; and
identify a first solar module subarray within the first plurality of solar module subarrays that has an optimal performance estimate relative to the other solar module subarrays in the first plurality of solar module subarrays,
wherein the configuration of the solar power system comprises at least the first solar module array and the first solar module subarray.

### Claim 16 (depends on 15)

The computing-device of claim 15, further comprising:
a memory coupled to the processing unit and storing program instructions that, when executed by the processing unit, cause the processing unit to:
project the first plurality of solar module arrays onto the target surface;
identify the first solar module array within the first plurality of solar module arrays;
project the first plurality of solar module subarrays onto regions of the target surface not covered by the first solar module array; and
identify the first solar module subarray within the first plurality of solar module subarrays.

### Claim 17 (depends on 15)

The computer-implemented method of claim 15, wherein the processing unit projects the first plurality of solar module arrays onto the target surface by:
projecting a tile grid onto the target surface that comprises an array of rectangular tiles;
culling tiles from the tile grid that do not meet a set of tile construction requirements to produce a first set of tiles;
generating a performance estimate for each tile in the first set of tiles;
culling tiles in the first set of tiles that do not meet a set of tile performance requirements to produce a second set of tiles;
identifying a region of contiguous tiles within the second set of tiles; and
projecting the first plurality of solar module arrays onto the region of contiguous tiles.

### Claim 18 (depends on 1)

The computer-implemented method of claim 1, wherein the processing unit identifies the first solar module array within the first plurality of solar module arrays by:
projecting a solar module grid onto the target surface that comprises an array of rectangular solar modules;
culling solar modules from the solar module grid that do not meet a set of solar module construction requirements to produce a first set of solar modules;
identifying one or more arrays of contiguous solar modules in the first set of solar modules;
generating a performance estimate for each array of the one or more arrays of contiguous solar modules; and
identifying the first solar module array within the one or more arrays of contiguous solar modules as having an optimal performance estimate relative to the other solar module arrays in the one or more arrays of contiguous solar modules.

### Claim 19 (depends on 1)

The computer-implemented method of claim 1, wherein the processing unit projects the first plurality of solar module subarrays onto regions of the target surface not covered by the first solar module array by:
receiving a set of tiles that represents at least a portion of the target surface;
excluding tiles associated with the first solar module array from additional processing to create a first subset of tiles;
culling tiles from the first subset of tiles that do not meet a set of tile construction requirements to produce a second subset of tiles;
identifying a subregion of contiguous tiles within the second subset of tiles; and
projecting the first plurality of solar module subarrays onto the subregion of contiguous tiles.

### Claim 20 (depends on 1)

The computer-implemented method of claim 1, wherein the processing unit identifies the first solar module subarray within the first plurality of solar module subarrays by:
projecting a solar module subgrid onto the target surface that comprises an array of rectangular solar modules;
culling solar modules from the solar module subgrid that do not meet a set of solar module construction requirements to produce a first subset of solar modules;
identifying one or more subarrays of contiguous solar modules in the first subset of solar modules;
generating a performance estimate for each subarray of the one or more subarrays of contiguous solar modules; and
identifying the first solar module subarray within the one or more subarrays of contiguous solar modules as having an optimal performance estimate relative to the other solar module subarrays in the one or more subarrays of contiguous solar modules.
