# US 2013/0157613 A1 · Method and Arrangement for Grace Period Control Associated with a Service Level in a Cellular Communications System

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2013/0157613 A1
- Document ID: US20130157613A1
- Status: Published application
- Kind: A1
- Application number: 13/818,214
- Filed: 2011-08-09
- Published: 2013-06-20
- Earliest claimed: 2010-09-01
- Assignees: Telefonaktiebolaget L M Ericsson (publ)
- Inventors: Andreas Limber; Anders Nordlund
- Web page: https://patentgrep.com/patent/US20130157613A1

## CPC

- H04W 4/24: Accounting or billing
- H04W 28/02: Traffic management, e.g. flow control or congestion control
- H04L 41/5019: Ensuring fulfilment of SLA
- H04L 43/0882: Utilisation of link capacity
- H04L 47/20: Traffic policing
- H04L 47/29: {using a combination of thresholds}
- H04W 8/04: Registration at HLR or HSS [Home Subscriber Server]
- H04W 24/10: Scheduling measurement reports {; Arrangements for measurement reports}
- H04W 72/00: Local resource management
- H04W: WIRELESS COMMUNICATION NETWORKS (broadcast communication H04H; communication systems using wireless links for non-selective communication, e.g. wireless extensions H04M1/72)
- H04L: TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION (arrangements common to telegraphic and telephonic communication H04M)

## Abstract

A method in a telecom node for controlling a grace period associated with a licensed capacity usage in the telecom node is provided. The telecom node is comprised in a cellular telephone network. The licensed capacity usage is associated with a capacity license limit. The telecom node measures (201) over a specific amount of time, the capacity usage in the telecom node overshooting the capacity license limit. When the measured capacity usage exceeds a preset value of an allowed capacity usage overshoot, the telecom node triggers (202) a grace period of the licensed capacity usage at the expiry of the specific amount of time. During the grace period capacity usage overshoot is allowed. Upon expiry of said grace period the licensed capacity usage is enforced according to the capacity license limit unless the licensed capacity usage is increased.

## Claims

### Claim at position 1

1-12. (canceled)

### Claim 13

A method, implemented in a telecom node of a cellular telephone network, for controlling a grace period associated with a licensed capacity usage in the telecom node, wherein the licensed capacity usage is associated with a capacity license limit, the method comprising:
measuring, over a specific amount of time, the capacity usage overshooting the capacity license limit;
in response to the measured capacity usage exceeding a preset value of an allowed capacity usage overshoot, triggering a grace period of the licensed capacity usage at the expiry of the specific amount of time, during which grace period capacity usage overshoot is allowed; and
upon expiry of the grace period, enforcing the licensed capacity usage according to the capacity license limit unless the licensed capacity usage is increased.

### Claim 14 (depends on 13)

The method of claim 13, further comprising resetting the grace period in response to the licensed capacity usage being increased by at least a minimum increase threshold to enable the grace period to be triggered again.

### Claim 15 (depends on 14)

The method of claim 14, further comprising saving the increased licensed capacity usage as an original licensed capacity usage each time the grace period is successfully reset.

### Claim 16 (depends on 13)

The method of claim 13, wherein:
the telecom node comprises a base station;
the measuring the capacity usage overshooting the capacity license limit comprises measuring the capacity usage overshooting the capacity license limit based on determining a load of the base station by monitoring a buffer status in the base station.

### Claim 17 (depends on 13)

The method of claim 13, wherein:
the telecom node comprises a Long Term Evolution eNodeB; and
the measuring the capacity usage overshooting the capacity license limit comprises measuring the capacity usage overshooting the capacity license limit based on counting at least one of resource blocks and resource elements transmitted in a subframe, frame, or group of frames.

### Claim 18 (depends on 13)

The method of claim 13, wherein:
the telecom node comprises a Long Term Evolution eNodeB; and
the measuring the capacity usage overshooting the capacity license limit comprises measuring the capacity usage overshooting the capacity license limit based on counting a number of user equipments connected to the eNodeB.

### Claim 19

A telecom node in a cellular telephone network, the telecom node for controlling a grace period associated with a licensed capacity usage in the telecom node, wherein the licensed capacity usage is associated with a capacity license limit, the telecom node comprising a control processor configured to:
measure, over a specific amount of time, the capacity usage in the telecom node overshooting the capacity license limit;
in response to the measured capacity usage exceeding a preset value of an allowed capacity usage overshoot, trigger a grace period of the licensed capacity usage at the expiry of the specific amount of time, during which grace period capacity usage overshoot is allowed; and
upon expiry of the grace period, enforce the licensed capacity usage according to the capacity license limit unless the licensed capacity usage is increased.

### Claim 20 (depends on 19)

The telecom node of claim 19, wherein the control processor is further configured to reset the grace period in response to the licensed capacity usage being increased by at least a minimum increase threshold to enable the grace period to be triggered again.

### Claim 21 (depends on 20)

The telecom node of claim 20, wherein the control processor is further configured to save the increased licensed capacity usage as an original licensed capacity usage each time the grace period is reset.

### Claim 22 (depends on 19)

The telecom node of claim 19, wherein:
the telecom node comprises a base station; and
the control processor is further configured to measure the capacity usage based on a determined load of the base station by monitoring a buffer status in the base station.

### Claim 23 (depends on 19)

The telecom node of claim 19, wherein:
the telecom node comprises a Long Term Evolution eNodeB; and
the control processor is further configured to measure the capacity usage based on at least one of counted resource blocks and resource elements transmitted in a subframe, frame, or group of frames.

### Claim 24 (depends on 19)

The telecom node of claim 19, wherein:
the telecom node comprises a Long Term Evolution eNodeB; and
the control processor is further configured to measure the capacity usage based on a counted number of user equipments connected to the eNodeB.
