# US 2013/0154262 A1 · Quick start-up of wind turbine generators

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2013/0154262 A1
- Document ID: US20130154262A1
- Status: Published application
- Kind: A1
- Application number: 13/330,298
- Filed: 2011-12-19
- Published: 2013-06-20
- Earliest claimed: 2011-12-19
- Assignees: Vestas Wind Systems A/S
- Inventors: Anshuman Tripathi; Elvis Yu; Yugarajan Karuppanan
- Web page: https://patentgrep.com/patent/US20130154262A1

## CPC

- F03D 7/026: {for starting-up}
- F03D 7/048: {controlling wind farms}
- H02P 2101/15: for wind-driven turbines
- Y02E 10/72: Wind turbines with rotation axis in wind direction
- F03D: WIND MOTORS
- H02P: CONTROL OR REGULATION OF ELECTRIC MOTORS, ELECTRIC GENERATORS OR DYNAMO-ELECTRIC CONVERTERS; CONTROLLING TRANSFORMERS, REACTORS OR CHOKE COILS
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION

## Abstract

A wind farm is provided that is capable of quickly starting up without delay after an electrical grid becomes available after an outage. According to one embodiment, the wind farm comprises one or more main WTGs and an auxiliary WTG having a substantially lower start-up energy requirement than the one or more main WTGs. The auxiliary WTG is coupled to supply power to the one or more main WTGs to prepare the one or more main WTGs for start-up.

## Claims

### Claim 1

A wind farm capable of quick start up, the wind farm comprising:
one or more main wind turbine generators (WTGs); and
an auxiliary WTG having a substantially lower start-up energy requirement than any one of the one or more main WTGs,
wherein the auxiliary WTG is coupled to supply power to the one or more main WTGs to prepare the one or more main WTGs for start-up.

### Claim 2 (depends on 1)

The wind farm according to claim 1, wherein the auxiliary WTG is a vertical axis WTG.

### Claim 3 (depends on 1)

The wind farm according to claim 1, wherein at least one of the one or more main WTGs starts up with substantially no delay after power from the external electrical gird becomes available.

### Claim 4 (depends on 1)

The wind farm according to claim 1, wherein at least one of the one or more main WTGs prepares for start-up by using the power supplied by the auxiliary WTG to at least one of:
pre-heat at least one of a fluid and a component of each of the one or more main WTGs; and
yaw each of the one or more main WTGs upwind.

### Claim 5 (depends on 1)

The wind farm according to claim 1, wherein at least one of the one or more main WTGs is coupled to supply power to start up the auxiliary WTG before power from the external electrical grid becomes unavailable.

### Claim 6 (depends on 1)

The wind farm according to claim 1, further comprising:
a fuel cell that supplies power to start up the auxiliary WTG.

### Claim 7 (depends on 1)

The wind farm according to claim 1, wherein the auxiliary WTG requires no start-up energy and is self-starting.

### Claim 8 (depends on 1)

The wind farm according to any one of claim 1, further comprising:
a high voltage DC bus, at least one of the one or more main WTGs outputting DC power to the high voltage DC bus.

### Claim 9

A method for quickly starting up one or more wind turbine generators (WTGs) in a wind farm, the method comprising:
during an electrical grid outage, preparing one or more WTGs in the wind farm for start-up using locally supplied power before the electrical grid is able to receive and distribute power generated by the wind farm; and
starting up at least one of the one or more WTGs with substantially no delay after the electrical grid is able to receive and distribute power generated by the wind farm.

### Claim 10 (depends on 9)

The method according to claim 9, wherein the locally supplied power is supplied by a vertical axis WTG.

### Claim 11 (depends on 9)

The method according to claim 9, wherein preparing the one or more WTGs for start-up includes at least one of:
pre-heating at least one of a fluid and a component of each of the one or more WTGs; and
yawing each of the one or more WTGs upwind.

### Claim 12 (depends on 9)

The method according to claim 9, further comprising:
starting up a generator to provide the locally supplied power using power supplied by the wind farm.

### Claim 13 (depends on 9)

The method according to claim 9, further comprising:
starting up a generator to provide the locally supplied power using power supplied by a fuel cell.

### Claim 14 (depends on 9)

The method according to claim 9, further comprising:
starting up a generator to provide the locally supplied power, wherein the generator that provides the locally supplied power is self-starting.

### Claim 15 (depends on 9)

The method according to claim 9, further comprising:
at least one of the one or more WTGs outputting DC power to a high voltage DC bus.
