# US 2013/0153216 A1 · Recovery From A Hydrocarbon Reservoir

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2013/0153216 A1
- Document ID: US20130153216A1
- Status: Published application
- Kind: A1
- Application number: 13/667,837
- Filed: 2012-11-02
- Published: 2013-06-20
- Earliest claimed: 2011-12-16
- Inventors: George R. Scott
- Web page: https://patentgrep.com/patent/US20130153216A1

## CPC

- E21B 43/2406: {Steam assisted gravity drainage [SAGD]}
- E21B 43/088: {Wire screens (comprising porous materials E21B43/082; comprising woven materials E21B43/084)}
- E21B 2200/02: Down-hole chokes or valves for variably regulating fluid flow
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS

## Abstract

A method and systems for improving recovery from a hydrocarbon reservoir are described. A method includes identifying an interval within the reservoir that comprises a reduced reservoir quality, wherein the interval includes hydrocarbons. A production chamber is formed in a reservoir interval below the interval of reduced reservoir quality, wherein the production chamber is in contact with the interval of reduced reservoir quality. Hydrocarbons are mobilized in the interval of reduced reservoir quality by contact with a mobilizing agent and a pressure is changed within the interval of reduced reservoir quality to allow hydrocarbon flow from the interval of reduced reservoir quality.

## Claims

### Claim 1

A method for improving recovery from a hydrocarbon reservoir, comprising:
identifying an interval within the reservoir that comprises a reduced reservoir quality, wherein the interval comprises hydrocarbons;
forming a production chamber in a reservoir interval below the interval of reduced reservoir quality, wherein the production chamber is in contact with the interval of reduced reservoir quality;
mobilizing hydrocarbons in the interval of reduced reservoir quality by contact with a mobilizing agent; and
changing a pressure within the interval of reduced reservoir quality to allow hydrocarbon flow from the interval of reduced reservoir quality.

### Claim 2 (depends on 1)

The method of claim 1, comprising cycling a steam pressure within the production chamber.

### Claim 3 (depends on 1)

The method of claim 1, comprising cycling a solvent pressure within the production chamber.

### Claim 4 (depends on 1)

The method of claim 1, comprising cycling the pressure over a period of at least one month.

### Claim 5 (depends on 1)

The method of claim 1, comprising cycling different areas of a reservoir using offset pressure phases to keep the total injection rate of the mobilizing fluid substantially constant over time.

### Claim 6 (depends on 1)

The method of claim 1, comprising drilling a lateral segment through the interval of reduced reservoir quality, wherein the lateral segment is configured to allow mobilizing agent flow into the interval of reduced reservoir quality.

### Claim 7 (depends on 6)

The method of claim 6, comprising drilling the lateral section through the intervals of reduced reservoir quality at an angle to a bed dip.

### Claim 8 (depends on 6)

The method of claim 6, comprising drilling the lateral section as a side track drilled from one of the gravity drainage wellbores.

### Claim 9 (depends on 6)

The method of claim 6, comprising leaving the lateral section open to the production chamber.

### Claim 10 (depends on 6)

The method of claim 6, comprising completing the portion of the lateral segment that is within the interval of reduced reservoir quality with a slotted liner, a wirewrap screen, or a mesh rite screen.

### Claim 11 (depends on 6)

The method of claim 6, comprising drilling the lateral segment from the surface.

### Claim 12

A system for increasing hydrocarbon production from an interval of low quality reservoir, comprising:
an injection well configured to inject an injectant into a reservoir;
a production well configured to produce fluids from the reservoir, wherein the fluids comprise a hydrocarbon; and
a pressure system configured to change a pressure within a production chamber to increase a flow of hydrocarbon from an interval of low quality reservoir in contact with the production chamber.

### Claim 13 (depends on 12)

The system of claim 12, wherein a maximum operating pressure for the production chamber is less than a reservoir failure pressure.

### Claim 14 (depends on 12)

The system of claim 12, wherein a minimum operating pressure for the production chamber is at least 10% lower than a maximum operating pressure.

### Claim 15 (depends on 12)

The system of claim 12, wherein the pressure system comprises an injection system configured to lower the pressure by slowing an injection rate.

### Claim 16 (depends on 12)

The system of claim 12, wherein the pressure system comprises a production system configured to lower the pressure by increasing fluid withdrawal.

### Claim 17 (depends on 12)

The system of claim 12, comprising a plurality of injection and production well pairs, and wherein the pressure of a production chamber associated with a single one of the plurality of injection and production well pairs is cycled.

### Claim 18 (depends on 17)

The system of claim 17, wherein two or more production chambers are independently pressure cycled, wherein each production chamber is associated with one of the plurality of injection and production well pairs.

### Claim 19 (depends on 12)

The system of claim 12, wherein the injection well and production well are drilled parallel to the direction of a bed dip in the lower quality resource.

### Claim 20

A system for harvesting resources in a low quality interval of a reservoir, comprising:
a gravity drainage system configured to drain a first portion of resources from a high quality interval of a reservoir; and
a pressure control system, wherein the pressure control system is configured to change a pressure on a production chamber to drain a second portion of resources from a low quality interval of a reservoir.
