# US 2013/0152496 A1 · System for anchoring a load

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2013/0152496 A1
- Document ID: US20130152496A1
- Status: Published application
- Kind: A1
- Application number: 13/818,522
- Filed: 2011-08-24
- Published: 2013-06-20
- Earliest claimed: 2010-08-24
- Inventors: Mark Ronald Sinclair
- Web page: https://patentgrep.com/patent/US20130152496A1

## CPC

- E02D 5/74: Means for anchoring structural elements or bulkheads (anchoring piles E02D5/54 {; anchored foundations E02D27/50})
- E02D 5/76: Anchorings for bulkheads or sections thereof {in as much as specially adapted therefor}
- E02D 27/50: Anchored foundations
- E04G 21/00: Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work (conveying in general B65G; lifting devices B66; working stone-like materials B28D; measuring instruments G01)
- E01D 22/00: Methods or apparatus for repairing or strengthening existing bridges {(electrochemical desalination or re-alkalisation C04B41/00); Methods or apparatus for dismantling bridges}
- E02D: FOUNDATIONS; EXCAVATIONS; EMBANKMENTS (specially adapted for hydraulic engineering E02B); UNDERGROUND OR UNDERWATER STRUCTURES {(tunnels, tunnelling, mining E21)}
- E04G: SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E01D: CONSTRUCTION OF BRIDGES, {ELEVATED ROADWAYS} OR VIADUCTS; ASSEMBLY OF BRIDGES (bridges extending between terminal buildings and aircraft for embarking or disembarking passengers B64F1/305; {tracks for special kinds of railways E01B25/00; culverts E01F5/005})

## Abstract

The invention relates to a method for anchoring a load (26) to an anchorage (30) utilising at least one unitary anchoring tendon (10) including a plurality of tensile elements (12) each having a free length (14) and a bond length (18). The tendon is located lengthwise in a bore (34) formed through the load into the anchorage, and different groups (G1, G2, G3) of the strands of the tendon are tensioned in a predetermined sequence to a respective initial displacement length prior to the different groups being collectively tensioned to a respective final displacement length to anchor the load.

## Claims

### Claim at position 1

1-31. (canceled)

### Claim 32

A method for anchoring a load to an anchorage, comprising:
providing at least one unitary anchoring tendon including a plurality of tensile elements each having a bond length and a free length, the tensile elements being fixed together at a leading end of the tendon;
forming a respective bore through the load into the anchorage for each said tendon;
inserting a said tendon lengthwise in its respective said bore such that the leading end of the tendon is passed through the load into the anchorage, the bond lengths of different groups of the tensile elements providing staggered bond transfer regions along a bond zone of the tendon for load transfer to the anchorage via grout with tensioning of the groups of tensile elements;
once the grout has sufficiently cured or set, tensioning different said groups of tensile elements in a predetermined sequence to extend the free length of the tensile elements to a respective initial displacement length, to compensate for differences in the free length of the tensile elements between respective of the groups;
subsequently, collectively further tensioning all of the tensile elements of the tendon at essentially the same time to extend the free length of the tensile elements by the same predetermined length to a respective increased final displacement length; and
securing the tendon to the load to maintain the tension in the tensile elements.

### Claim 33 (depends on 32)

A method according to claim 32, wherein the tensile elements of the tendon are tensioned in sequence from tensile elements with the longest free length to tensile elements with the shortest free length.

### Claim 34 (depends on 32)

A method according to claim 32, wherein the groups of tensile elements of the tendon are notionally ordered and the tensioning of respective of the groups to their initial displacement length comprises collectively tensioning groups lower in the order with each group that is higher in the order, in turn.

### Claim 35 (depends on 34)

A method according to claim 34, wherein each said group lower in the order is extended in said sequence by a length determined to compensate for difference in the free length of the strands in that group with the strands in a said group that is next highest in the order.

### Claim 36 (depends on 33)

A method according to claim 33, wherein the groups of tensile elements are notionally ordered, and each said group lower in the order is extended in said sequence by a length determined to compensate for difference in the free length of the strands in that group with the strands in a said group that is highest in the order.

### Claim 37 (depends on 36)

A method according to claim 36, comprising tensioning the strand groups to a common predetermined tension level and further extending each said group lower in the order by the respective said compensating length.

### Claim 38 (depends on 32)

A method according to claim 32, wherein tensioning means consisting of a single jacking device is used for at least the tensioning of the groups of strands to their respective final displacement.

### Claim 39 (depends on 32)

A method according to claim 32, wherein a primary sheath is provided in the bore and at least the bond lengths of the tensile elements are disposed in the sheath, and the grout comprises internal grout about the respective bond lengths of the tensile elements and external grout in the bore outside of the sheath.

### Claim 40 (depends on 39)

A method according to claim 39, wherein the sheath is corrugated to facilitate load transfer to the anchorage.

### Claim 41 (depends on 39)

A method according to claim 39, wherein the free lengths of tensile elements of the tendon are disposed in a straight walled sheath mounted on top of the primary sheath.

### Claim 42 (depends on 32)

A method according to claim 32, wherein the load anchored by the anchoring tendon is selected from the group consisting of ground, earthen, building, and engineering structures or formations.

### Claim 43 (depends on 42)

A method according to claim 42, wherein the load is a dam wall.

### Claim 44

A unitary anchoring tendon for being positioned lengthwise in a respective bore formed through a load to anchor the load to an anchorage, the tendon having a leading end for being located within the anchorage and the tendon comprising a plurality of tensile elements each having a bond length and a free length, the tensile elements being fixed together at the leading end of the tendon and the free length of different ones of the tensile elements differ whereby the bond lengths of the tensile elements provide staggered load transfer regions along a bond zone of the tendon for load transfer to the anchorage via grout in the bore with tensioning of the different ones of the tensile elements in a predetermined sequence.

### Claim 45 (depends on 44)

An anchoring tendon according to claim 44, wherein the free length of each said tensile element is received in a respective sleeve.

### Claim 46 (depends on 44)

An anchoring tendon according to claim 44, wherein the tensile elements are fixed together at the leading end of the tendon by an epoxy.

### Claim 47 (depends on 44)

An anchoring tendon according to claim 44, wherein the tendon has at least 19 tensile elements.

### Claim 48 (depends on 44)

An anchoring tendon according to claim 44, wherein the load transfer capacity of the tendon is at least 1500kN UTS.

### Claim 49 (depends on 44)

An anchoring tendon according to claim 44, wherein the different ones of the tensile elements constitute different groups, and wherein the groups of tensile elements are differentially identified thereby defining a said predetermined sequence for the tensioning of the different groups to extend the free length of the tensile elements in each said group to a respective initial displacement length once the grout has sufficiently cured or set.

### Claim 50 (depends on 49)

An anchorage system according to claim 49, wherein the tensile elements of the tendon are differentially identified by one or more of the following selected from the group consisting of different free lengths of the tensile elements, markings, cuttings, colours, sheathing, tagging, heatshrink wrap, and labelling.

### Claim 51 (depends on 44)

An anchorage system according to claim 44, wherein the tensile elements of the tendon are selected from the group consisting of strand, rod, wire, cable, and bar elements.
