# US 2013/0097606 A1 · Dynamic Scheduling for Frames Representing Views of a Geographic Information Environment

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2013/0097606 A1
- Document ID: US20130097606A1
- Status: Published application
- Kind: A1
- Application number: 13/272,721
- Filed: 2011-10-13
- Published: 2013-04-18
- Earliest claimed: 2011-10-13
- Assignees: Google Inc.
- Inventors: Gregory William Coombe; Jeremy Paul Erickson
- Web page: https://patentgrep.com/patent/US20130097606A1

## CPC

- G06F 9/4887: {involving deadlines, e.g. rate based, periodic}
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)

## Abstract

An exemplary method for scheduling jobs in frames representing views of a geographic information environment is disclosed. An exemplary method includes determining a remaining frame period in a frame representing a view of a geographic information environment. The exemplary method also includes identifying a dynamic job in a scheduling queue. The dynamic job has a non-preemptive section that is between a start of the job and a preemption point of the job. The exemplary method further includes determining an estimated execution time for executing the job. When the estimated execution time is not greater than the remaining frame period, the exemplary method includes executing the non-preemptive section of the job in the frame. When the estimated execution time is greater than the remaining frame period, the exemplary method includes postponing the execution of the job in the frame.

## Claims

### Claim 1

A method for scheduling jobs in frames representing views of a geographic information environment, comprising:
determining a first remaining frame period in a first frame representing a first view of the geographic information environment, the first remaining frame period being a time period after executing a first set of fixed jobs in the first frame and at a frame boundary of the first Lame;
identifying a first dynamic job in a scheduling queue, the first dynamic job having a first non-preemptive section that is between a start of the first job and a first preemption point of the first job;
determining a first estimated execution time for executing the first job;
when the first estimated execution time is not greater than the first remaining frame period, executing the first non-preemptive section of the first job in the first frame; and
when the first estimated execution time is greater than the first remaining frame period, postponing the execution of the first job in the first frame.

### Claim 2 (depends on 1)

The method of claim 1, wherein postponing the execution of the first job in the first frame comprises executing the first job in a next frame.

### Claim 3 (depends on 1)

The method of claim 1, further comprising:
when the first estimated execution time is not greater than the first remaining frame period, determining a second remaining frame period in the first frame, the second remaining frame period being a time period after executing the first non-preemptive section of the first job and at the frame boundary of the first frame;
determining whether the first job has a second non-preemptive section that is between the first preemption point of the first job and a subsequent preemption point of the first job;
determining a second estimated execution time for executing the first job;
when the second estimated execution time is not greater than the second remaining frame period, executing the second non-preemptive section of the first job in the first frame; and
when the second estimated execution time is greater than the second remaining frame period, postponing the execution of the first job at the first preemption point.

### Claim 4 (depends on 1)

The method of claim 1, further comprising:
when the first estimated execution time is not greater than the first remaining frame period, determining a second remaining frame period in the first frame, the second remaining frame period being a time period after executing the first non-preemptive section of the first job and at the frame boundary of the first frame;
determining whether the first job has a second non-preemptive section that is between the first preemption point of the first job and an end of the first job, wherein the first job has one preemption point;
determining a second estimated execution time for executing the first job;
when the second estimated execution time is not greater than the second remaining frame period, executing the second non-preemptive section of the first job in the first frame; and
when the second estimated execution time is greater than the second remaining frame period, postponing the execution of the first job at the first preemption point.

### Claim 5 (depends on 1)

The method of claim 1, further comprising:
when the first estimated execution time is greater than the first remaining frame period, identifying a second dynamic job in the scheduling queue, the second dynamic job having a second non-preemptive section that is between a start of the second job and a first preemption point of the second job;
determining a second estimated execution time for executing the second job;
when the second estimated execution time is not greater than the first remaining frame period, executing the second non-preemptive section of the second job in the first frame; and
when the second estimated execution time is greater than the first remaining frame period, postponing the execution of the second job in the first frame.

### Claim 6 (depends on 1)

The method of claim 1, further comprising:
executing a second set of fixed jobs in a second frame representing a second view of the geographic information environment; and
when the first estimated execution time is greater than the first remaining frame period and after executing the second set of fixed jobs, executing the first non-preemptive section of the first job in the second frame.

### Claim 7 (depends on 1)

The method of claim 1, further comprising
determining whether the execution of the first job has exceeded the frame boundary of the first frame; and
when it is determined that the execution of the first job has exceeded the frame boundary, halting the execution of the first job.

### Claim 8 (depends on 1)

The method of claim 1, wherein determining the first estimated execution time is based at least in part on past behavior.

### Claim 9 (depends on 1)

The method of claim 1, wherein the first estimated execution time is determined at runtime.

### Claim 10 (depends on 1)

The method of claim 1, wherein the first estimated execution time is based in part on at least one of a task identifier of the first job, a type of the first non-preemptive section of the first job, or a section length of at least one non-preemptive section of the first job.

### Claim 11

A system for scheduling jobs in frames representing views of a geographic information environment, comprising:
(a) a scheduler configured to:
(i) determine a first remaining frame period in a first frame representing a first view of the geographic information environment, the first remaining frame period being a time period after executing a first set of fixed jobs in the first frame and at a frame boundary of the first frame;
(ii) identify a first dynamic job in a scheduling queue, the first dynamic job having a first non-preemptive section that is between a start of the first job and a first preemption point of the first job;
(iii) when the first estimated execution time is not greater than the first remaining frame period, execute the first non-preemptive section of the first job in the first frame; and
(iv) when the first estimated execution time is greater than the first remaining frame period, postpone the execution of the first job in the first frame; and
(b) a predictor configured to determine a first estimated execution time for executing the first job.

### Claim 12 (depends on 11)

The system of claim 11 wherein
the scheduler is configured to
(v) when the first estimated execution time is not greater than the first remaining frame period, determine a second remaining frame period in the first frame, the second remaining frame period being a time period after executing the first non-preemptive section of the first job and at the frame boundary of the first frame;
(vi) determine whether the first job has a second non-preemptive section that is between the first preemption point of the first job and a subsequent preemption point of the first job;
(vii) when the second estimated execution time is not greater than the second remaining frame period, execute the second non-preemptive section of the first job in the first frame; and
(viii) when the second estimated execution time is greater than the second remaining frame period, postpone the execution of the first job at the first preemption point; and
the predictor is configured to determine a second estimated execution time for executing the first job.

### Claim 13 (depends on 11)

The system of claim 11 wherein
the scheduler is configured to
(v) when the first estimated execution time is not greater than the first remaining frame period, determine a second remaining frame period in the first frame, the second remaining frame period being a time period after executing the first non-preemptive section of the first job and at the frame boundary of the first frame;
(vi) determine whether the first job has a second non-preemptive section that is between the first preemption point of the first job and an end of the first job, wherein the first job has one preemption point;
(vii) when the second estimated execution time is not greater than the second remaining frame period, execute the second non-preemptive section of the first job in the first frame; and
(viii) when the second estimated execution time is greater than the second remaining frame period, postpone the execution of the first job at the first preemption point; and
the predictor is configured to determine a second estimated execution time for executing the first job.

### Claim 14 (depends on 11)

The system of claim 11 wherein
the scheduler is configured to
(v) when the first estimated execution time is greater than the first remaining frame period, identify a second dynamic job in the scheduling queue, the second dynamic job having a second non-preemptive section that is between a start of the second job and a first preemption point of the second job;
(vi) when the second estimated execution time is not greater than the first remaining frame period, execute the second non-preemptive section of the second job in the first frame; and
(vii) when the second estimated execution time is greater than the first remaining frame period, postpone the execution of the second job in the first frame; and
the predictor is configured to determine a second estimated execution time for executing the second job.

### Claim 15 (depends on 11)

The system of claim 11 wherein the scheduler is configured to
(v) execute a second set of fixed jobs in a second frame representing a second view of the geographic information environment; and
(vi) when the first estimated execution time is greater than the first remaining frame period and after executing the second set of fixed jobs, execute the first non-preemptive section of the first job in the second frame.

### Claim 16 (depends on 11)

The system of claim 11 wherein the scheduler is configured to
(v) determine whether the execution of the first job has exceeded the frame boundary of the first frame; and
(vi) when it is determined that the execution of the first job has exceeded the frame boundary, halt the execution of the first job.

### Claim 17 (depends on 11)

The system of claim 11, wherein the predictor is configured to determine the first estimated execution time based at least in part on past behavior.

### Claim 18 (depends on 11)

The system of claim 11, wherein the predictor is configured to determine the first estimated execution time at runtime.

### Claim 19 (depends on 11)

The system of claim 11, wherein the predictor is configured to determine the first estimated execution time based in part on at least one of a task identifier of the first job, a type of the first non-preemptive section of the first job, or a section length of at least one non-preemptive section of the first job.

### Claim 20 (depends on 11)

The system of claim 11, wherein the scheduler is a uniprocessor scheduler.

### Claim 21 (depends on 11)

The system of claim 11, wherein the scheduler is a multiprocessor scheduler.

### Claim 22

An apparatus comprising at least one non-transitory computer readable storage medium encoding instructions thereon that, in response to execution by a computing device, cause the computing device to perform operations comprising:
determining a first remaining frame period in a first frame representing a first view of the geographic information environment, the first remaining frame period being a time period after executing a first set of fixed jobs in the first frame and at a frame boundary of the first frame;
identifying a first dynamic job in a scheduling queue, the first dynamic job having a first non-preemptive section that is between a start of the first job and a first preemption point of the first job;
determining a first estimated execution time for executing the first job;
when the first estimated execution time is not greater than the first remaining frame period, executing the first non-preemptive section of the first job in the first frame; and
when the first estimated execution time is greater than the first remaining frame period, postponing the execution of the first job in the first frame.

### Claim 23 (depends on 22)

The apparatus of claim 22, wherein the operations further comprise;
when the first estimated execution time is not greater than the first remaining frame period, determining a Second remaining frame period in the first frame, the second remaining frame period being a time period after executing the first non-preemptive section of the first job and at the frame boundary of the first frame;
determining whether the first job has a second non-preemptive section that is between the first preemption point of the first job and a subsequent preemption point of the first job;
determining a second estimated execution time for executing the first job;
when the second estimated execution time is not greater than the second remaining frame period, executing the second non-preemptive section of the first job in the first frame; and
when the second estimated execution time is greater than the second remaining frame period, postponing the execution of the first job at the first preemption point.

### Claim 24 (depends on 22)

The apparatus of claim 22, wherein the operations further comprise:
when the first estimated execution time is not greater than the first remaining frame period, determining a second remaining frame period in the first frame, the second remaining frame period being a time period after executing the first non-preemptive section of the first job and at the frame boundary of the first frame;
determining whether the first job has a second non-preemptive section that is between the first preemption point of the first job and an end of the first job, wherein the first job has one preemption point;
determining a second estimated execution time for executing the first job;
when the second estimated execution time is not greater than the second remaining frame period, executing the second non-preemptive section of the first job in the first frame; and
when the second estimated execution time is greater than the second remaining frame period, postponing the execution of the first job at the first preemption point.

### Claim 25 (depends on 22)

The apparatus of claim 22, wherein the operations further comprise:
when the first estimated execution time is greater than the first remaining frame period, identifying a second dynamic job in the scheduling queue, the second dynamic job having a second non-preemptive section that is between a start of the second job and a first preemption point of the second job;
determining a second estimated execution time for executing the second job;
when the second estimated execution time is not greater than the first remaining frame period, executing the second non-preemptive section of the second job in the first frame; and