Abstract
During metering, a screw is retreated to a preset metering completion position while it is being forwardly rotated. Pilot injection is performed such that the screw is reversely rotated and advanced so that a resin pressure reaches a predetermined compression pressure, during a time period between the end of the metering and the start of injection. The screw reverse rotation is continued before the screw advance is started for the pilot injection. In this way, a check valve can be closed at a relatively low pressure such that precision metering can be achieved.
Claims5
A metering controller for an injection molding machine, comprising:
- a screw advancing/retreating unit for advancing and retreating a screw;
- a screw rotating unit for rotating the screw;
- a resin pressure detection unit configured to detect a resin pressure;
- a metering unit configured to retreat the screw to a preset metering completion position while forwardly rotating the screw during metering;
- a screw reverse rotation unit configured to reversely rotate the screw during a time period between the end of the metering and the start of injection;
- and
- a pilot injection unit configured to advance the screw so that the resin pressure reaches a predetermined compression pressure during the time period between the end of the metering and the start of the injection,
- wherein the pilot injection unit is configured to start screw advance after the start of the screw reverse rotation by the screw reverse rotation unit, and
- the screw reverse rotation unit is configured to continue the screw reverse rotation at least before the screw advance is started by the pilot injection unit.