# US 2013/0075108 A1 · Barrier valve system and method of closing same by withdrawing upper completion

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2013/0075108 A1
- Document ID: US20130075108A1
- Status: Published application
- Kind: A1
- Application number: 13/433,991
- Filed: 2012-03-29
- Published: 2013-03-28
- Earliest claimed: 2010-12-07
- Assignees: Baker Hughes Incorporated
- Inventors: Raymond A. Frisby; Jeffrey S. Phillips; Roy N. Nelson; Donald Lauderdale
- Web page: https://patentgrep.com/patent/US20130075108A1

## CPC

- E21B 34/14: operated by movement of tools, e.g. sleeve valves operated by pistons or wire line tools {(E21B34/066 takes precedence)}
- E21B 34/00: Valve arrangements for boreholes or wells
- E21B 34/06: in wells
- E21B 43/14: Obtaining from a multiple-zone well
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS

## Abstract

A completion system, including a barrier valve transitionable between an open position and a closed position. An upper completion is operatively coupled with the barrier valve for mechanically transitioning the barrier valve to the closed position when the upper completion is withdrawn. A method of operating a completion system is also included.

## Claims

### Claim 1

A completion system, comprising:
a barrier valve transitionable between an open position and a closed position; and
an upper completion operatively coupled with the barrier valve for mechanically transitioning the barrier valve to the closed position when the upper completion is withdrawn.

### Claim 2 (depends on 1)

The completion system of claim 1, wherein mechanical movement of the upper completion also enables the upper completion to transition the barrier valve to the open position.

### Claim 3 (depends on 1)

The completion system of claim 1, wherein the upper completion comprises a production string.

### Claim 4 (depends on 1)

The completion system of claim 1, wherein the upper completion includes a stroker that is actuatable by fluid pressure for mechanically moving the barrier valve between the open and closed positions.

### Claim 5 (depends on 1)

The completion system of claim 1, wherein the barrier valve is part of an intermediate assembly located between a lower completion and the upper completion.

### Claim 6 (depends on 5)

The completion system of claim 5, wherein the lower completion includes at least one assembly for enabling stimulation, hydraulic fracturing, frac packing, gravel packing, or a combination including at least one of the foregoing.

### Claim 7 (depends on 5)

The completion system of claim 5, wherein the intermediate assembly includes a packer device for isolating the borehole, anchoring the intermediate assembly, or a combination including at least one of the foregoing.

### Claim 8 (depends on 7)

The completion system of claim 7, wherein the upper completion is a production string run in with a removable plug for enabling the packer device of the intermediate assembly to be set by pressurizing fluid against the removable plug.

### Claim 9 (depends on 7)

The completion system of claim 7, wherein the upper completion string includes a shifting tool that extends through the packer device for engagement with the barrier valve.

### Claim 10 (depends on 5)

The completion system of claim 5, further comprising a subsequent intermediate assembly stacked with the intermediate assembly, the subsequent intermediate assembly having a subsequent barrier valve.

### Claim 11 (depends on 10)

The completion system of claim 10, wherein the intermediate assembly is engaged between the subsequent intermediate assembly and the lower completion and the subsequent intermediate assembly is engaged between the intermediate assembly and the upper completion string.

### Claim 12 (depends on 11)

The completion system of claim 11, wherein the upper completion includes a first tool operatively arranged for enabling the subsequent barrier valve to transition between open and closed positions and the subsequent intermediate assembly is arranged with a second tool for holding the barrier valve in its open position while the subsequent intermediate assembly is engaged with the first intermediate assembly.

### Claim 13 (depends on 1)

The completion system of claim 1, wherein the production string comprises an artificial lift system.

### Claim 14

A method of operating a completion system, comprising:
withdrawing an upper completion, the upper completion operatively coupled to a barrier valve for controlling operation of the barrier valve; and
closing the barrier valve mechanically due to the withdrawing.

### Claim 15 (depends on 14)

The method of claim 14, further comprising:
running in the upper completion or a subsequent upper completion; and
opening the barrier valve mechanically due to the running in.

### Claim 16 (depends on 14)

The method of claim 14, wherein the barrier valve is part of an intermediate assembly located between a lower completion and the upper completion.

### Claim 17 (depends on 16)

The method of claim 16, wherein the upper completion string includes a removable plug, the method further comprising pressurizing against the removable plug for setting a packer device of the intermediate assembly and removing the removable plug.

### Claim 18 (depends on 16)

The method of claim 16, further comprising stacking a subsequent intermediate assembly on the intermediate assembly, the subsequent intermediate assembly having a subsequent barrier valve and holding the barrier valve of the intermediate assembly in the open position, the upper completion being operatively engagable with the subsequent intermediate assembly for transitioning the subsequent intermediate assembly between open and closed positions.

### Claim 19 (depends on 14)

The method of claim 14, wherein the barrier valve is part of a lower completion.

### Claim 20 (depends on 14)

The method of claim 14, further comprising running the barrier valve in on the upper completion.

### Claim 21 (depends on 14)

The method of claim 14, wherein the upper completion is a production string.
