Maintenance of an offshore wind farm making use of an assembly of a floating harbour ship and a plurality of shuttle vessels
AssigneeZ Knowledge B.V.
InventorReinout Klaar Norfolc Jaap Prins
Life of this patent
Estimating the term…
Loading patent…
AssigneeZ Knowledge B.V.
InventorReinout Klaar Norfolc Jaap Prins
Estimating the term…
A method for use with maintenance of an offshore wind farm includes a plurality of offshore wind turbines installed in open sea, where the method uses an assembly of a plurality of shuttle vessels 8, 9 and a seaworthy harbour ship 1 which includes an internal harbour basin 4 within outlines of the ship 1 and a plurality of mooring positions 7 for mooring the plurality of shuttle vessels 8, 9 to the ship 1 when lying inside the basin 4, where the method further includes comprises sailing the assembly of the plurality of shuttle vessels 8, 9 and the harbour ship 1 towards an anchoring position near or in the wind farm and anchoring the harbour ship 1 there, and sailing the plurality of shuttle vessels 8, 9 back and forth between the mooring positions 7 of the anchored harbour ship 1 and distinctive ones of the wind turbines for performing the maintenance thereto.
A method for use with maintenance of an offshore wind farm comprising a plurality of offshore wind turbines installed in open sea, in which the method comprises:
Dependencies are inferred from the claim text.