# US 2012/0291248 A1 · Process and apparatus for a combined casting and rolling installation

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2012/0291248 A1
- Document ID: US20120291248A1
- Status: Published application
- Kind: A1
- Application number: 13/562,740
- Filed: 2012-07-31
- Published: 2012-11-22
- Earliest claimed: 2008-04-04
- Assignees: Siemens Vai Metals Technologies GmbH
- Inventors: Gerald HOHENBICHLER; Michael JESCHE; Daniel NESS; Wolfgang PEITL; Heinrich PUEHRINGER; Alois SEILINGER; Robert Andrew SHORE
- Web page: https://patentgrep.com/patent/US20120291248A1

## CPC

- B22D 11/1206: {for plastic shaping of strands (rolling mills B21B1/46)}
- B21B 1/463: {in a continuous process, i.e. the cast not being cut before rolling}
- B21B 15/0007: {Cutting or shearing the product}
- B21B 2015/0014: {transversely to the rolling direction}
- Y10T 29/49989: Followed by cutting or removing material
- Y10T 29/49991: Combined with rolling
- Y10T 29/5184: Casting and working
- B22D: CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES (shaping of plastics or substances in a plastic state B29C; metallurgical processing, selection of substances to be added to metal C21, C22)
- B21B: ROLLING OF METAL (auxiliary operations used in connection with metal-working operations covered in B21, see B21C; bending by rolling B21D; manufacture of particular objects, e.g. screws, wheels, rings, barrels, balls, by rolling B21H; pressure welding by means of a rolling mill B23K20/04)
- Y10T: TECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION

## Abstract

An apparatus for producing hot-rolled products in a combined casting-rolling installation when there is a planned or unplanned interruption to production. This can bridge an interruption in production downstream of the cutting-up and delivering device (6): a) cutting off a strand portion (21) of the continuously produced preliminary material (3) by means of a first shears (9); b) raising the tail part of the strand portion (21) from the roller table (4) by means of a raising device (11); c) breaking up the preliminary material (3) passing the first shears (9) into pieces of scrap (19) by means of the first shears (9)into pieces of scrap (19) by means of the first shears (9), delivering the pieces of scrap (19) and removing the strand portion (21) unit the operational readiness of the combined casting-rolling installation is restored.

## Claims

### Claim 1

A combined casting and rolling installation for producing hot-rolled products from a continuously cast precursor material, the installation comprising:
at least one continuous casting installation configured to produce a continuously cast precursor material;
after the casting installation along a path of continuous casting, a cutting-up and discharging device for the precursor material, the cutting-up and discharging device comprising first shears after the casting installation;
downstream from the first shears, a lowerable roller table and a raising apparatus configured to raise the lowerable roller table;
a single-stand or multi-stand finishing rolling mill train after the cutting-up and discharging device;
a precursor material cooling section positioned after the finishing rolling mill train; and
a storage device positioned after the precursor material cooling section.

### Claim 2 (depends on 1)

The installation as claimed in claim 1, further comprising:
second shears situated upstream from the first shears; and
a discharging apparatus between the second shears and the first shears.

### Claim 3 (depends on 1)

The installation as claimed in claim 1, further comprising: a single-stand or multi-stand rough-rolling mill train between the continuous casting installation and the cutting-up and discharging device.

### Claim 4 (depends on 1)

The installation as claimed in claim 1, further comprising: a heating section and a de-scaling installation for the cast precursor material located upstream from the single-stand or multi-stand finishing rolling mill train.

### Claim 5 (depends on 1)

The installation as claimed in claim 1, wherein the raising apparatus comprises a hydraulically driven jib.

### Claim 6 (depends on 15)

The installation as claimed in claim 15 further comprising: a housing assigned to the discharging apparatus.

### Claim 7 (depends on 2)

The installation as claimed in claim 2, further comprising: motor-driven rollers or driving rollers respectively situated upstream and/or downstream from the first shears and/or the second shears.

### Claim 8 (depends on 1)

The installation as claimed in claim 1, wherein the first shears comprise drum shears.

### Claim 9 (depends on 2)

The installation as claimed in claim 2, wherein the second shears comprise pendulum shears.

### Claim 10 (depends on 1)

The installation as claimed in claim 1, wherein the heating section comprises a tunnel heating section with induction heating.