# US 2012/0266800 A1 · Spar mooring line sharing method and system

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2012/0266800 A1
- Document ID: US20120266800A1
- Status: Published application
- Kind: A1
- Application number: 13/266,481
- Filed: 2010-04-30
- Published: 2012-10-25
- Earliest claimed: 2009-04-30
- Assignees: Technip France
- Inventors: David N. Edelson; Jim Wang; Andrew Buck; Peter Sharp; Timothy Arthur Hale
- Web page: https://patentgrep.com/patent/US20120266800A1

## CPC

- B63B 21/50: Anchoring arrangements {or methods} for special vessels, e.g. for floating drilling platforms or dredgers
- A61L 24/001: {Use of materials characterised by their function or physical properties}
- A61L 24/0031: {Hydrogels or hydrocolloids}
- A61L 24/06: obtained by reactions only involving carbon-to-carbon unsaturated bonds {(A61L24/043, A61L24/046 take precedence)}
- A61L 31/14: Materials characterised by their function or physical properties {, e.g. injectable or lubricating compositions, shape-memory materials, surface modified materials}
- A61L 31/145: {Hydrogels or hydrocolloids}
- A61L 31/18: Materials at least partially X-ray or laser opaque
- A61L 2430/36: for embolization or occlusion, e.g. vaso-occlusive compositions or devices
- B63B: SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING (arrangements of vessel ventilation, heating, cooling, or air-conditioning B63J2/00; floating substructures as supports of dredgers or soil-shifting machines E02F9/06)
- A61L: METHODS OR APPARATUS FOR STERILISING MATERIALS OR OBJECTS IN GENERAL; DISINFECTION, STERILISATION OR DEODORISATION OF AIR; CHEMICAL ASPECTS OF BANDAGES, DRESSINGS, ABSORBENT PADS OR SURGICAL ARTICLES; MATERIALS FOR BANDAGES, DRESSINGS, ABSORBENT PADS OR SURGICAL ARTICLES (preservation of bodies or disinfecting characterised by the agents employed A01N; preserving, e.g. sterilising, food or foodstuffs A23; preparations for medical, dental or toiletry purposes A61K)

## Abstract

The disclosure provides a method and system of coupling end-to-end at least two existing mooring lines (12A, 12B) that are already deployed from the floating platform (56) to the seabed or other connecting structure to create a single shared line from the two lines. The shared lines then form a single looped line with both ends deployed to the subsea connections. The shared length provides enough payout of line to loosen one line sufficiently, while the other line becomes correspondingly tighter using the catenary length of the tight line. In part, the line can be loosened while the other is tightened because the lines are generally in the same overall direction to the seabed, such as in a same quadrant around the platform. Thus, the lines share their available lengths to provide the necessary payout for the repairs.

## Claims

### Claim 1

A method for sharing of mooring lines, comprising:
coupling end-to-end at least a first mooring line and a second mooring line that are already deployed from a floating platform to a seabed or other connecting structure to create a single shared line from the two lines with the ends of the shared line deployed to the seabed or other connecting structure;
tightening the first mooring line to provide payout of line for the second mooring line; and
loosening the second mooring line.

### Claim 2 (depends on 1)

The method of claim 1, repairing the second mooring line when loosened with the payout of line from the first mooring line.

### Claim 3 (depends on 2)

The method of claim 2, further comprising:
tightening the second mooring line to provide payout of line for the first mooring line; and
loosening the first mooring line.

### Claim 4 (depends on 3)

The method of claim 3, repairing the first mooring line when loosened with the payout of line from the second mooring line.

### Claim 5 (depends on 4)

The method of claim 4, further comprising:
tightening the first mooring line;
loosening the second mooring line; and
decoupling the first mooring line from the second mooring line.

### Claim 6 (depends on 1)

The method of claim 1, further comprising:
tightening the second mooring line to provide payout of line for the first mooring line; and
loosening the first mooring line.

### Claim 7 (depends on 1)

The method of claim 1, wherein coupling end-to-end at least a first mooring line and a second mooring line comprises:
paying out the first mooring line to access a first portion of the first mooring line coupled to the floating platform;
disconnecting the first portion of the first mooring line from a remainder of the first mooring line to create an end of the first mooring line not connected to the floating platform;
paying out the second mooring line to access a first portion of the second mooring line coupled to the floating platform;
disconnecting the first portion of the second mooring line from a remainder of the second mooring line to create an end of the second mooring line not connected to the floating platform;
coupling the end of the first mooring line with the end of the second mooring line.

### Claim 8 (depends on 7)

The method of claim 7, further comprising:
repairing the loosened second mooring line;
tightening the second mooring line;
loosening the first mooring line;
decoupling the first mooring line from the second mooring line;
reconnecting the first portion of the first mooring line to the remainder of the first mooring line; and
reconnecting the first portion of the second mooring line to the remainder of the second mooring line.

### Claim 9 (depends on 1)

The method of claim 1, further comprising:
lifting the loosened second mooring line from a subsea elevation;
repairing the second mooring line; and
lowering the second mooring line.

### Claim 10 (depends on 9)

The method of claim 9, further comprising:
disconnecting the second mooring line from the seabed or other connecting structure;
lifting the disconnected second mooring line;
repairing the disconnected second mooring line;
reconnecting the second mooring line to the seabed or other connecting structure; and
lowering the second mooring line.

### Claim 11 (depends on 10)

The method of claim 10, further comprising:
tightening the second mooring line to provide payout of line for the first mooring line; and
loosening the first mooring line.

### Claim 12 (depends on 11)

The method of claim 11, further comprising:
lifting the loosened first mooring line from a subsea elevation;
repairing the first mooring line; and
lowering the first mooring line.

### Claim 13

12, further comprising:
disconnecting the first mooring line from the seabed or other connecting structure;
lifting the disconnected first mooring line;
repairing the disconnected first mooring line;
reconnecting the first mooring line to the seabed or other connecting structure; and
lowering the first mooring line.

### Claim 14 (depends on 13)

The method of claim 13, further comprising:
tightening the first mooring line;
loosening the second mooring line; and
decoupling the first mooring line from the second mooring line.

### Claim 15

A system for sharing of mooring lines, comprising:
at least one holding element adapted to hold at least a first mooring line and a second mooring line with ends available for coupling, the mooring lines being already deployed from a floating platform to couple with a seabed or other connecting structure with other ends of the lines;
a coupling element adapted to couple end-to-end the two mooring lines to create a single shared line from the two lines; and
a first tightening element adapted to tighten the first mooring line to provide payout of line for the second mooring line to allow loosening of the second mooring line.

### Claim 16 (depends on 15)

The system of claim 15, further comprising a second tightening element adapted to tighten the second mooring line to provide payout of line for the first mooring line to allow loosening of the first mooring line.

### Claim 17 (depends on 16)

The system of claim 16, wherein the holding element is coupled between the first and second tightening elements and adapted to guide the mooring lines between the first and second tightening elements.