# US 2012/0266796 A1 · Offshore wind turbine installation

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2012/0266796 A1
- Document ID: US20120266796A1
- Status: Published application
- Kind: A1
- Application number: 13/393,986
- Filed: 2010-08-23
- Published: 2012-10-25
- Earliest claimed: 2009-09-04
- Assignees: Itrec B.V.
- Inventors: Joop Roodenburg; Diederick Bernardus Wijning; Alexei Bereznitski; Theodorus Cornelis Joanes Maria Stijnman
- Web page: https://patentgrep.com/patent/US20120266796A1

## CPC

- B63B 35/003: {for transporting very large loads, e.g. offshore structure modules (construction methods for artificial islands mounted on piles E02B17/00; for transporting marine vessels B63B35/40; docks B63C1/00)}
- B63B 1/107: {Semi-submersibles; Small waterline area multiple hull vessels and the like, e.g. SWATH}
- B63B 27/10: of cranes
- B63B 27/16: of lifts or hoists {(pilot lifts B63B27/146)}
- B63B 39/02: to decrease vessel movements by displacement of masses
- B63B 43/08: by transfer of solid ballast
- B66C 23/185: {for use erecting wind turbines (B66C23/207 takes precedence)}
- B66C 23/52: Floating cranes (floating dredgers E02F)
- Y02E 10/727: Offshore wind turbines
- B63B: SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING (arrangements of vessel ventilation, heating, cooling, or air-conditioning B63J2/00; floating substructures as supports of dredgers or soil-shifting machines E02F9/06)
- B66C: CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES ({specially adapted for lifting invalids A61G7/10;} rope, cable, or chain winding mechanisms, braking or detent devices therefor B66D; specially adapted for nuclear reactors G21)
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION

## Abstract

An offshore wind turbine installation vessel, wherein the wind turbine is of the type to be installed on a foundation that is installed on the seabed prior to the installation of the wind turbine on the foundation, wherein the wind turbine is of the type with a vertical mast to be fitted with its lower end onto the foundation, wherein the vessel includes a non-jack-up type floating hull; and a crane structure extending upward from said hull. The crane structure is provided with a hoisting device having one or more wind turbine suspension elements and a wind turbine engagement device supported by the suspension elements and adapted to engage with said wind turbine. The hoisting device is adapted to support and to raise and lower in controllable manner at least the mast of the wind turbine while in vertical orientation.

## Claims

### Claim 1

An offshore wind turbine installation vessel for installation of an offshore wind turbine, wherein the wind turbine is of the type to be installed on a foundation that is installed on the seabed prior to the installation of the wind turbine on the foundation, wherein the wind turbine is of the type with a vertical mast to be fitted with its lower end onto the foundation, and with a nacelle with a hub and blades supported on top of said mast, wherein said vessel comprises:
a non-jack-up type floating hull; and
a crane structure extending upward from said hull,
wherein the crane structure is provided with a wind turbine hoisting device having one or more wind turbine suspension elements and a wind turbine engagement device supported by said one or more suspension elements, wherein said wind turbine engagement device is adapted to engage with the mast of said wind turbine, said wind turbine hoisting device being adapted to support and to raise and lower in controllable manner at least the mast of the wind turbine while in vertical orientation;
wherein the vessel includes an active horizontal motion device adapted to actively compensate for sea-state induced horizontal displacement of said wind turbine engagement device in at least one horizontal direction, while the vertically oriented mast of the wind turbine is engaged by said wind turbine engagement device.

### Claim 2 (depends on 1)

The vessel according to claim 1, wherein the crane structure is a rigid crane structure extending upward from said hull, which crane structure is rigidly connected to the hull of the vessel,
wherein said crane structure has at least a first vertical side, wherein said first vertical side is provided with a trolley guide,
wherein said crane comprises a wind turbine supporting trolley which is vertically mobile along said trolley guide on the first vertical side of the crane structure, wherein said trolley is supported by said one or more suspension elements, and wherein said trolley supports the wind turbine engagement device, and wherein said trolley and the wind turbine engagement device are adapted to support the weight of the wind turbine,
and wherein an active horizontal motion device is mounted between said trolley and the wind turbine engagement device, said active horizontal motion device being adapted to actively compensate for sea-state induced horizontal displacement of the wind turbine engagement device in at least one horizontal direction, while a wind turbine is supported by said wind turbine engagement device.

### Claim 3 (depends on 2)

The vessel according to claim 2, wherein at said first vertical side of the crane structure—in addition to the wind turbine supporting trolley—a second trolley is provided which is vertically mobile along a trolley guide on said first vertical side of the crane structure, wherein said second trolley supports a second wind turbine engagement device,
and wherein an active horizontal motion device is mounted between the second trolley and the associated wind turbine engagement device, said active horizontal motion device being adapted to actively compensate for sea-state induced horizontal displacement of the wind turbine engagement device in at least one horizontal direction,
wherein said crane allows to engage the mast of the wind turbine with said wind turbine engagement devices at vertically spaced apart positions so as to support the mast in vertical orientation, the one engagement device primarily supporting the weight of the wind turbine the other engagement device primarily serving to stabilize the wind turbine in vertical orientation,
wherein, said crane allows to engage the mast with said wind turbine engagement devices at positions that are at least 20 metres apart in vertical direction.

### Claim 4 (depends on 3)

The vessel according to claim 3, wherein one more connecting rods are provided that are adapted to directly interconnect the wind turbine supporting trolley and the second trolley at said first vertical side so that a vertical spacing is maintained between said trolleys.

### Claim 5 (depends on 2)

The vessel according to claim 2, wherein the crane further comprises a foundation hoisting device associated with a second vertical side of said crane structure, opposite from the first vertical side, which foundation hoisting device allows to support as well as raise and lower in a controllable manner the foundation suspended there along the second vertical side of the crane structure.

### Claim 6 (depends on 5)

The vessel according to claim 5, wherein the foundation hoisting device comprises a foundation support trolley that is vertically mobile along a trolley guide at said second side of the crane structure, and wherein said foundation support trolley is supported by one or more suspension members of said foundation hoisting device, and wherein a foundation suspension member is provided for connecting the foundation to the foundation support trolley, such that the foundation can be lifted and/or lowered by operation of the foundation hoisting device.

### Claim 7 (depends on 1)

The vessel according to claim 1, wherein the vessel is a twin hull vessel with two parallel hulls connected by a central bridge so as to form a generally H-shape deck forming open spaces between the hulls towards the bow and the stern of the vessel, wherein the rigid crane structure is located above the central bridge.

### Claim 8 (depends on 7)

The vessel according to claim 7, wherein the vessel further comprises a roll damping device comprising one or more mobile solid ballast bodies guided on a track on the hull, and an associated displacement drive and displacement drive control, said drive control being adapted to cause motion of said one or more solid ballast bodies so as to compensate for sea-state induced vessel roll motion.

### Claim 9 (depends on 7)

The vessel according to claim 7, wherein the vessel further comprising at least one pitch damping device comprising one or more mobile solid ballast bodies guided on a track and an associated displacement drive and displacement drive control, said drive control being adapted to cause motion of said one or more solid ballast bodies so as to compensate for sea-state induced vessel pitch motion, the pitch damping device being associated with each parallel hull.

### Claim 10 (depends on 1)

The vessel according to claim 1, wherein the crane structure is provided with one or more top cable sheave assemblies at said first said, and wherein the wind turbine supporting trolley and/or the associated wind turbine engagement device is provided with one or more lower cable sheave assemblies, and wherein the suspension elements are one or more cables guided over said cable sheave assemblies, the wind turbine hoisting device comprising one or more winches for said one or more cables.

### Claim 11 (depends on 1)

The vessel according to claim 1, wherein the wind turbine hoisting device comprises a heave compensation device adapted to compensate for sea-state induced vertical displacement of the wind turbine engagement device supporting the weight of the wind turbine.

### Claim 12 (depends on 1)

The method for installation of an offshore wind turbine, at least the mast thereof, on a pre-installed seabed foundation, wherein the wind turbine is of the type having a vertical mast to be fitted with its lower end onto the foundation, and with a nacelle with a hub and blades supported on top of said mast, said method comprising the steps of:
using the offshore wind turbine installation vessel according to claim 1;
with the hull of the vessel in floating condition—holding the wind turbine, at least the mast thereof, in vertical orientation with the wind turbine hoisting device.
positioning the lower end of the mast of the wind turbine above the pre-installed foundation; and
with the lower end of the mast being positioned above the pre-installed foundation—at least during the steps of lowering the mast onto the foundation and fastening the mast to the foundation, operating the one or more active horizontal motion devices so as to compensate for sea-state induced horizontal motion of the wind turbine engagement device,
and wherein the wind turbine hoisting device comprises a heave compensation device adapted to compensate for sea-state induced vertical displacement of the wind turbine engagement device supporting the weight of the wind turbine, and wherein the method further includes—with the lower end of the mast being positioned above the pre-installed foundation—at least during the steps of lowering the mast onto the foundation and fastening the mast to the foundation, operating the heave compensation device so as to compensate for sea-state induced vertical motion of the lower end of the mast relative to the pre-installed foundation.

### Claim 13 (depends on 12)

The method according to claim 12, wherein the vessel is a twin hull vessel with two parallel hulls connected by a central bridge so as to form a generally H-shape deck forming open spaces between the hulls towards the bow and the stern of the vessel, wherein the rigid crane structure is located above the central bridge, preferably crew accommodation being mounted on the central bridge, and wherein—at least during the steps of lowering the mast onto the foundation and fastening the mast to the foundation—the vessel is facing the waves with its bow or its stern, and wherein the active horizontal motion device performs active horizontal displacement of the one or more wind turbine engagement assemblies at least in longitudinal direction of the vessel.

### Claim 14 (depends on 12)

The method according to claim 12, wherein the vessel further comprises a roll damping device comprises one or more mobile solid ballast bodies guided on a track on the hull, preferably housed within a compartment of the hull of the vessel, preferably within the central bridge of the hull, and an associated displacement drive and displacement drive control, said drive control being adapted to cause motion of said one or more solid ballast bodies so as to compensate for sea-state induced vessel roll motion, and wherein—at least during the steps of lowering the mast onto the foundation and fastening the mast to the foundation—the roll damping device and/or one or more pitch damping devices are operated to compensate for sea-state induced vessel motion.

### Claim 15 (depends on 1)

In combination, a vessel according to claim 1 and a wind turbine supported by the wind turbine hoisting device in vertical orientation along a first side of the crane structure.

### Claim 16

An offshore wind turbine installation vessel for installation of an offshore wind turbine, wherein the wind turbine is of the type to be installed on a foundation that is installed on the seabed prior to the installation of the wind turbine on the foundation, wherein the wind turbine is of the type with a vertical mast to be fitted with its lower end onto the foundation, and with a nacelle with a hub and blades supported on top of said mast, wherein said vessel comprises:
a non-jack-up type floating hull; and
a crane structure extending upward from said hull,
wherein the crane structure is provided with a wind turbine hoisting device having one or more wind turbine suspension elements and a wind turbine engagement device supported by said one or more suspension elements and adapted to engage with said wind turbine, said hoisting device being adapted to support and to raise and lower in controllable manner at least the mast of the wind turbine while in vertical orientation;
wherein the vessel has single rigid crane structure, the mentioned wind turbine hoisting device being arranged to hold the wind turbine, at least the mast thereof, suspended along a first vertical side of the crane structure, a foundation hoisting device also being provided that allows to support as well as raise and lower in a controllable manner the foundation suspended there from along an opposed second vertical side of the crane structure.

### Claim 17 (depends on 16)

The vessel according to claim 16, wherein the vessel is a twin hull vessel with two parallel hulls connected by a central bridge so as to form a generally H-shape deck forming open spaces between the hulls towards the bow and the stern of the vessel, wherein the rigid crane structure is located above the central bridge.

### Claim 18

A twin hull vessel having two parallel buoyant hulls interconnected by a hull cross-structure above the waterline,
wherein the vessel further comprises a roll damping device comprises one or more mobile solid ballast bodies guided on a track, and an associated displacement drive and displacement drive control, said drive control being adapted to cause motion of said one or more solid ballast bodies so as to compensate for sea-state induced vessel roll motion,
and wherein the vessel further comprises at least one pitch damping device comprising one or more mobile solid ballast bodies guided on a track and an associated displacement drive and displacement drive control, said drive control being adapted to cause motion of said one or more solid ballast bodies so as to compensate for sea-state induced vessel pitch motion.

### Claim 19 (depends on 18)

The vessel according to claim 18, wherein in said roll damping device the one or more solid ballast bodies are displaceable in transverse direction of the hull over at least 10 metres.

### Claim 20 (depends on 18)

The vessel according to claim 18, wherein in each pitch damping device the one or more mobile solid ballast bodies are displaceable in longitudinal direction of the hull over at least 20 metres.

### Claim 21 (depends on 18)

The vessel according to claim 18, wherein each parallel hull is of the SWATH-type having a submarine form lower hull portion and one or more streamlined struts on top of said hull portion, said one or more struts extending through the water surface, the upper ends of the one or more struts connecting to the cross-structure.

### Claim 22 (depends on 18)

Vessel The vessel according to claim 18, wherein the vessel is a crane vessel and has a rigid crane structure erected on said cross-structure of the vessel.

### Claim 23

A twin hull crane vessel having two parallel buoyant hulls interconnected by a load-bearing cross-structure above the waterline,
wherein said hull cross-structure supports a crane,
wherein the crane has a vertically extending rigid structural framework that is erected on said vessel,
wherein said framework of the crane is embodied to form a load-bearing structure absorbing sea-state induced forces complementary to the cross-structure of the vessel.

### Claim 24 (depends on 23)

The vessel according to claim 23, wherein the rigid structural framework comprises two parallel rows of multiple vertical posts arranged on the cross-structure, each row being spaced from the outer side of the adjacent hull, horizontal girders between the posts in axial and transversal direction, one or more diagonal braces in vertical planes between the posts, and one or more diagonal braces between each hull and one or more of the posts.

### Claim 25

An offshore wind turbine installation tool for installation of an offshore wind turbine on a foundation that is installed on the seabed prior to the installation of the wind turbine on the foundation, wherein the wind turbine is of the type with a vertical mast to be fitted with its lower end onto the foundation,
wherein the tool is adapted to be fastened to the foundation prior to mating the mast of the wind turbine with the foundation,
wherein the mast is provided with a circumferential flange on its exterior, said flange being adapted to be engaged by the wind turbine installation tool, the tool providing a temporary fastening of the mast to the foundation allowing to effect permanent fastening of the mast to the foundation,
wherein the tool is adapted to allow for rotation of the mast about its longitudinal axis while the mast is temporary fastened to the foundation with the tool,
wherein the tool comprises a set of lower rollers engaging the flange of the mast from below and a set of upper rollers engaging said the flange from above.

### Claim 26 (depends on 25)

The tool according to claim 25, wherein each upper roller is displaceable between a retracted position and an active position engaging on the flange, and wherein one or more actuators, are associated with the upper rollers so that said flange can be forcibly clamped between the lower and upper rollers.

### Claim 27 (depends on 25)

The tool according to claim 25, wherein the tool comprises vertical displacement actuators, allowing to vertically position at least the lower set of rollers while the mast is temporary fastening by the tool.

### Claim 28 (depends on 25)

Method for installation and/or transportation of a wind turbine and/or a wind turbine foundation, comprising the step of using the vessel according to claim 25.