# US 2012/0257424 A1 · Limiting Peak Electrical Power Drawn by Mining Excavators

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2012/0257424 A1
- Document ID: US20120257424A1
- Status: Published application
- Kind: A1
- Application number: 13/466,802
- Filed: 2012-05-08
- Published: 2012-10-11
- Earliest claimed: 2009-05-15
- Assignees: Siemens Industry, Inc.; Caterpillar Global Mining LLC; Siemens Aktiengesellschaft
- Inventors: Joy Mazumdar; Walter Köllner; Andreas Holweck; Michael G. Onsager; Ekkehard Pittius
- Web page: https://patentgrep.com/patent/US20120257424A1

## CPC

- H02P 5/74: controlling two or more AC dynamo-electric motors (H02P5/46, H02P5/60 take precedence)
- E02F 9/207: {of the type electric propulsion units, e.g. electric motors or generators}
- E02F 9/2091: {Control of energy storage means for electrical energy, e.g. battery or capacitors (energy recovery arrangements in hydraulic or pneumatic drives E02F9/2217)}
- H02P: CONTROL OR REGULATION OF ELECTRIC MOTORS, ELECTRIC GENERATORS OR DYNAMO-ELECTRIC CONVERTERS; CONTROLLING TRANSFORMERS, REACTORS OR CHOKE COILS
- E02F: DREDGING; SOIL-SHIFTING (winning peat E21C49/00)

## Abstract

The maximum electrical power drawn from an electrical power source by a mining excavator comprising electric motors is reduced by supplying supplementary electrical power from an electrical energy storage unit. The input electrical power drawn by the mining excavator is cyclic. An upper limit is set for the electrical power drawn from the electrical power source. When the input electrical power drawn by the mining excavator exceeds the upper limit, electrical power is supplied by the electrical energy storage unit, such as an ultracapacitor bank. The ultracapacitor bank may be charged by the electrical power source during off-peak intervals. Electrical power generated by electrical motors operating in a regeneration interval may also be recaptured and stored in the electrical energy storage unit.

## Claims

### Claim at position 1

1-30. (canceled)

### Claim 31

A method for transferring electrical power, the method comprising:
receiving a first electrical power regenerated from an electrical motor operating during a regeneration interval;
converting the first electrical power to a direct-current electrical power;
feeding a direct-current link with the direct-current electrical power; and
transferring a second electrical power from the direct-current link to electrical power grid.

### Claim 32 (depends on 31)

The method of claim 31, wherein transferring a second electrical power from the direct-current link to an electrical power grid comprises:
converting the second electrical power to an alternating-current electrical power; and
transferring the alternating-current electrical power to the electrical power grid.

### Claim 33 (depends on 32)

The method of claim 32, wherein converting the second electrical power to an alternating-current electrical power is performed by an active front end.

### Claim 34 (depends on 31)

The method of claim 31, wherein the electrical power grid comprises a public utility electrical power grid,

### Claim 35

A method for transferring electrical power, the method comprising:
receiving a first electrical power regenerated from an electrical motor operating during a regeneration interval;
converting the first electrical power to a direct-current electrical power;
feeding a direct-current link with the direct-current electrical power;
determining a charge of an electrical energy storage unit;
upon determining that the charge is less than a user-defined charge limit, transferring a second electrical power from the direct-current link to the electrical energy storage unit; and
upon determining that the charge is greater than or equal to the user-defined charge limit, transferring the second electrical power from the direct-current link to an electrical power grid.

### Claim 36 (depends on 35)

The method of claim 35, wherein transferring the second electrical power from the direct-current link to an electrical power grid comprises:
converting the second electrical power to an alternating-current electrical power; and
transferring the alternating-current electrical power to the electrical power grid.

### Claim 37 (depends on 36)

The method of claim 36, wherein converting the second electrical power to an alternating-current electrical power is performed by an active front end.

### Claim 38 (depends on 35)

The method of claim 35, wherein the electrical energy storage unit comprises an ultracapacitor.

### Claim 39 (depends on 35)

The method of claim 35, wherein the electrical power grid comprises a public utility electrical power grid.

### Claim 40

A system for transferring electrical power, the system comprising:
an electrical power conversion system configured to:
receive a first electrical power regenerated from an electrical motor operating during a regeneration interval; and
convert the first electrical power to a direct-current electrical power;
a direct-current link operatively coupled to the electrical power conversion system, wherein the direct-current link is configured to receive the direct-current electrical power; and
an active front end operatively coupled to the direct-current link, wherein the active front end is configured to:
receive a second electrical power from the direct-current link:
convert the second electrical power to an alternating-current electrical power; and
transfer the alternating-current electrical power to an electrical power grid.

### Claim 41 (depends on 40)

The system of claim 40, further comprising a controller, wherein:
the controller is operatively coupled to the direct-current link;
the controller is operatively coupled to the active front end; and
the controller is configured to:
determine a third electrical power drawn by an application load from the direct-current link; and
upon determining that the third electrical power is less than a user-defined electrical power limit, transfer the second electrical power to the active front end.

### Claim 42 (depends on 40)

The system of claim 40, wherein the electrical power grid comprises a public utility electrical power grid.

### Claim 43

A system for transferring electrical power, the system comprising:
an electrical power conversion system configured to:
receive a first electrical power regenerated from an electrical motor operating during a regeneration interval; and
convert the first electrical power to a direct-current electrical power;
a direct-current link operatively coupled to the electrical power conversion system, wherein the direct-current link is configured to receive the direct-current electrical power;
an electrical energy storage unit operatively coupled to the direct-current link, wherein the electrical energy storage unit is configured to receive a second electrical power from the direct-current link; and
an active front end operatively coupled to the direct-current link, wherein the active front end is configured to:
receive a third electrical power from the direct-current link;
convert the third electrical power to an alternating-current electrical power; and
transfer the alternating-current electrical power to an electrical power grid.

### Claim 44 (depends on 43)

The system of claim 43, further comprising a controller, wherein:
the controller is operatively coupled to the direct-current link;
the controller is operatively coupled to the electrical energy storage unit;
the controller is operatively coupled to the active front end; and
the controller is configured to:
determine a charge of the electrical energy storage unit;
upon determining that the charge is less than a user-defined charge limit, transfer the second electrical power from the direct-current link to the electrical energy storage unit; and
upon determining that the charge is greater than or equal to the user-defined charge limit, transfer the third electrical power from the direct-current link to the active front end.

### Claim 45 (depends on 43)

The system of claim 43, further comprising a controller, wherein:
the controller is operatively coupled to the direct-current link;
the controller is operatively coupled to the electrical energy storage unit;
the controller is operatively coupled to the active front end; and
the controller is configured to:
determine a fourth electrical power drawn by an application load from the direct-current link; and
upon determining that the fourth electrical power is less than a user-defined power limit:
determine a charge of the electrical energy storage unit;
upon determining that the charge is less than a user-defined charge limit, transfer the second electrical power from the direct-current link to the electrical energy storage unit; and
upon determining that the charge is greater than or equal to the user-defined charge limit, transfer the third electrical power from the direct-current link to the active front end.

### Claim 46 (depends on 43)

The system of claim 43, wherein the electrical energy storage unit comprises an ultracapacitor.

### Claim 47 (depends on 43)

The system of claim 43, wherein the electrical power grid comprises a public utility electrical power grid.