# US 2012/0254681 A1 · Synchronizing a device that has been power cycled to an already operational system

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2012/0254681 A1
- Document ID: US20120254681A1
- Status: Published application
- Kind: A1
- Application number: 13/489,641
- Filed: 2012-06-06
- Published: 2012-10-04
- Earliest claimed: 2007-06-07
- Assignees: Texas Instruments Incorporated
- Inventors: Gary L. Swoboda
- Web page: https://patentgrep.com/patent/US20120254681A1

## CPC

- G01R 31/3177: Testing of logic operation, e.g. by logic analysers
- G01R 31/317: Testing of digital circuits
- G06F 1/12: Synchronisation of different clock signals {provided by a plurality of clock generators}
- G06F 1/3206: Monitoring of events, devices or parameters that trigger a change in power modality
- G06F 11/221: {to test buses, lines or interfaces, e.g. stuck-at or open line faults}
- G06F 11/2284: {by power-on test, e.g. power-on self test [POST]}
- G06F 11/267: Reconfiguring circuits for testing, e.g. LSSD, partitioning
- H04L 7/046: {using a dotting sequence}
- G01R: MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES (indicating correct tuning of resonant circuits H03J3/12)
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- H04L: TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION (arrangements common to telegraphic and telephonic communication H04M)

## Abstract

A method comprises a system comprising a host device coupled to a first remote device actively operating according to a state diagram that the host device and all remote devices follow during operation of the system. The method further comprises powering up a second remote device while the host device and first remote device are actively operating according to the state diagram. The second remote device waits for a synchronization point sequence. Upon detecting the synchronization point sequence, the second remote device implements a predetermined feature set and synchronizes itself to the state diagram at a common point as the host device and first remote device.

## Claims

### Claim 1

A target system comprising:
A. a communications link that includes a test data input signal, a test data output signal, a test clock signal, and a test mode select signal;
B. a first remote device including:
i. first scan test logic including a first test access port controller having a test clock input and a test mode select input, the first test access port controller including a state machine having the states of TEST LOGIC RESET, RUN TEST IDLE, SELECT-DR, CAPTURE-DR, SHIFT-DR, EXIT1-DR, PAUSE-DR, EXIT2-DR, and UPDATE-DR; and
ii. first adapter circuitry including a second test access port controller having a test clock input and a test mode select input, the first adapter circuitry being connected to the communications link signals and selectively coupling the first scan test logic to the communications link signals, the second test access port controller including a state machine having the states of TEST LOGIC RESET, RUN TEST IDLE, SELECT-DR, CAPTURE-DR, SHIFT-DR, EXIT1-DR, PAUSE-DR, EXIT2-DR, and UPDATE-DR, the first adapter circuitry at power up connecting the test clock signal to the test clock inputs of the controllers of the first adapter circuitry and the first scan test logic and connecting the test mode select signal to the test mode select inputs of the controllers of the first adapter circuitry and the first scan test logic, causing both the first and second test access port controllers to cycle to the IDLE state, and then decoupling the first controller of the first scan test logic from the test clock signal while recognizing a serial, synchronization point sequence on the test mode select input; and
C. a second remote device including:
i. second scan test logic including a third test access port controller having a test clock input and a test mode select input, the third test access port controller including a state machine having the states of TEST LOGIC RESET, RUN TEST IDLE, SELECT-DR, CAPTURE-DR, SHIFT-DR, EXIT1-DR, PAUSE-DR, EXIT2-DR, and UPDATE-DR; and
ii. second adapter circuitry including a fourth test access port controller having a test clock input and a test mode select input, the second adapter circuitry being connected to the communications link signals and selectively coupling the second scan test logic to the communications link signals, the fourth test access port controller including a state machine having the states of TEST LOGIC RESET, RUN TEST IDLE, SELECT-DR, CAPTURE-DR, SHIFT-DR, EXIT1-DR, PAUSE-DR, EXIT2-DR, and UPDATE-DR, the second adapter circuitry at power up connecting the test clock signal to the test clock inputs of the controllers of the second adapter circuitry and the second scan test logic and connecting the test mode select signal to the test mode select inputs of the controllers of the second adapter circuitry and the second scan test logic, causing both the third and fourth test access port controllers to cycle to the IDLE state, and then decoupling the third controller of the second scan test logic from the test clock signal while recognizing a serial, synchronization point sequence on the test mode select input.

### Claim 2 (depends on 1)

The target system of claim 1 in which the state machines of all the test access port controllers also cycle through the states of SELECT-IR, CAPTURE-IR, SHIFT-IR, EXIT1-IR, PAUSE-IR, EXIT2-IR, and UPDATE-IR.

### Claim 3 (depends on 1)

The target system of claim 1 including core logic coupled to the scan test logic.

### Claim 4 (depends on 1)

The target system of claim 1 in which the adapter circuitry includes a test data input and a test data output.
