# US 2012/0253764 A1 · Method of optimising a wind park construction

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2012/0253764 A1
- Document ID: US20120253764A1
- Status: Published application
- Kind: A1
- Application number: 13/431,014
- Filed: 2012-03-27
- Published: 2012-10-04
- Earliest claimed: 2011-04-04
- Inventors: Soeren E. Nielsen
- Web page: https://patentgrep.com/patent/US20120253764A1

## CPC

- F03D 1/0633: {of the blades}
- F03D 9/257: {the wind motor being part of a wind farm}
- F05B 2250/183: zigzag
- F05B 2260/96: Preventing, counteracting or reducing vibration or noise
- F05B 2270/333: Noise or sound levels
- Y02B 10/30: Wind power
- Y02E 10/72: Wind turbines with rotation axis in wind direction
- F03D: WIND MOTORS
- F05B: INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
- Y02B: CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION

## Abstract

A method of optimising a wind park construction is provided. The wind park includes at least a first wind turbine and a second wind turbine. According to the method, a first blade topology is selected for the first wind turbine depending on a noise optimisation parameter which is measured and/or predicted at a reference position at a distance from the wind park. A second blade topology is selected for the second wind turbine depending on an energy efficiency optimisation parameter.

## Claims

### Claim 1

A method of optimising a wind park construction, the wind park comprising at least a first wind turbine and a second wind turbine, the method comprising:
selecting a first blade topology for the first wind turbine depending on a noise optimisation parameter which is measured and/or predicted at a reference position at a distance from the wind park, and
selecting a second blade topology for the second wind turbine depending on an energy efficiency optimisation parameter.

### Claim 2 (depends on 1)

The method according to claim 1, wherein the first blade topology defines a first shape of a trailing edge of a blade of the first wind turbine and the second blade topology defines a second shape of a trailing edge of a blade of the second wind turbine.

### Claim 3 (depends on 1)

The method according to claim 1, wherein at least the trailing edge of the first wind turbine comprises a first part and a second part.

### Claim 4 (depends on 3)

The method according to claim 3, wherein the trailing edge is serrated over the first part.

### Claim 5 (depends on 4)

The method according to claim 4, wherein the first part is located in a region at the outermost end of the blade.

### Claim 6 (depends on 5)

The method according to claim 5, wherein the first part extends at most one third of the total length of the blade.

### Claim 7 (depends on 3)

The method according to claim 3, wherein the first part is more flexible than the second part.

### Claim 8 (depends on 2)

The method according to claim 2, comprising a step of replacing a non optimized part with a replacement part, which is optimized according to the first or second topology.

### Claim 9 (depends on 8)

The method according to claim 8, wherein the replacement part comprises a saw-tooth pattern.

### Claim 10

A wind turbine for a wind park, comprising:
a plurality of blades with trailing edges which can be optimized according to at least a first blade topology and a second blade topology,
wherein the first blade topology relates to a noise optimisation parameter which is measured and/or predicted at a reference position at a distance from the wind park, and
wherein the second blade topology relates to an energy efficiency optimisation parameter.

### Claim 11

A wind park, comprising:
a first wind turbine and a second wind turbine, wherein
a first blade topology is selected for the first wind turbine depending on a noise optimisation parameter which is measured and/or predicted at a reference position at a distance from the wind park, and
a second blade topology is selected for the second wind turbine depending on an energy efficiency optimisation parameter.
