# US 2012/0253539 A1 · Systems and methods for synchronizing switching within a power distribution network

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2012/0253539 A1
- Document ID: US20120253539A1
- Status: Published application
- Kind: A1
- Application number: 13/075,568
- Filed: 2011-03-30
- Published: 2012-10-04
- Earliest claimed: 2011-03-30
- Assignees: General Electric Company
- Inventors: Dale Robert McMullin
- Web page: https://patentgrep.com/patent/US20120253539A1

## CPC

- H02J 3/0073: by providing alternative feeding paths when the main path fails
- H02J 3/17: Demand-responsive operation of AC power transmission or distribution networks
- H02J 13/13: characterised by the transmission of data to equipment in the power network
- H02J 13/333: the equipment forming part of substations
- H02J 3/381: {Dispersed generators}
- H02J 2105/51: {according to a condition being electrical}
- Y02B 70/3225: Demand response systems, e.g. load shedding, peak shaving
- Y02E 60/00: Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
- Y04S 20/222: Demand response systems, e.g. load shedding, peak shaving
- Y04S 40/12: characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- Y02B: CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y04S: SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS

## Abstract

Systems and methods for synchronizing switching within a power distribution network are provided. A switch plan for restoring electrical power to a power distribution network following a power outage may be identified by a control system. The control system may be associated with a power utility and may include one or more computers. A plurality of switching operations associated with the switch plan may be identified by the control system. The plurality of switching operations may include at least one automatic switching operation and at least one manual switching operation. A synchronized execution of the plurality of switching operations may be coordinated by the control system.

## Claims

### Claim 1

A method comprising:
identifying, by a control system associated with a power utility and comprising one or more computers, a switch plan for restoring electrical power to a power distribution network following a power outage;
identifying, by the control system, a plurality of switching operations associated with the switch plan, the plurality of switching operations comprising at least one automatic switching operation and at least one manual switching operation; and
coordinating, by the control system, a synchronized execution of the plurality of switching operations.

### Claim 2 (depends on 1)

The method of claim 1, wherein coordinating a synchronized execution of the plurality of switching operations comprises:
determining, by the control system, an order for executing the plurality of switching operations; and
directing, by the control system based at least in part upon the determined order, the execution of each of the plurality of switching operations.

### Claim 3 (depends on 2)

The method of claim 2, wherein directing the execution of each of the plurality of switching operations comprises:
determining, by the control system for each of the plurality of switching operations, whether the switching operation is an automatic switching operation or a manual switching operation; and
directing, by the control system based at least in part on the determinations, the execution of the switching operation.

### Claim 4 (depends on 3)

The method of claim 3, wherein it is determined that the switching operation is an automatic switching operation, and wherein directing the execution of the switching operation comprises:
directing, by the control system, communication of a command to execute the switching operation to an automatic switching control system.

### Claim 5 (depends on 3)

The method of claim 3, wherein it is determined that the switching operation is a manual switching operation, and wherein directing the execution of the switching operation comprises:
directing, by the control system, the communication of a message to execute the switching operation to a user device associated with a field technician.

### Claim 6 (depends on 3)

The method of claim 3, further comprising:
receiving, by the control system, an indication that the switching operation has been completed,
wherein coordinating a synchronized execution of the plurality of switching operations comprises executing a next switching operation included in the plurality of switching operations based at least in part upon the received indication.

### Claim 7 (depends on 1)

The method of claim 1, further comprising:
directing, by the control system, conduction of a load balancing analysis within the power distribution network; and
modifying, by the control system based at least in part upon the load balancing analysis, the switch plan.

### Claim 8 (depends on 1)

The method of claim 1, further comprising:
communicating, by the control system to a distributed energy resource, an indication that one or more switching operations have been executed,
wherein the distributed energy resource determines, based at least in part on the indication, an effect of the one or more switching operations on a power delivery associated with the distributed energy resource.

### Claim 9 (depends on 1)

The method of claim 1, further comprising:
identifying, by the control system based at least in part on the switch plan, an area of the power distribution network isolated as a result of the plurality of switching operations; and
directing, by the control system, an optimization of maintenance associated with the identified area.

### Claim 10 (depends on 9)

The method of claim 9, wherein directing an optimization of maintenance comprises:
communicating, by the control system to an asset management system, information associated with a power outage for the isolated area, wherein the asset management system schedules maintenance associated with the isolated area based at least in part on the received information;
receiving, by the control system from the asset management system, scheduled maintenance information for the isolated area; and
modifying, by the control system based at least in part upon the scheduled maintenance information, the switch plan.

### Claim 11

A system, comprising:
at least one memory configured to store computer-executable instructions; and
at least one processor configured to access the at least one memory and execute the computer-executable instructions to:
identify a switch plan for restoring electrical power to a power distribution network following a power outage;
identify a plurality of switching operations associated with the switch plan, the plurality of switching operations comprising at least one automatic switching operation and at least one manual switching operation; and
coordinate a synchronized execution of the plurality of switching operations.

### Claim 12 (depends on 11)

The system of claim 11, wherein the at least one processor is configured to coordinate the synchronized execution of the plurality of switching operations by executing the computer-executable instructions to:
determine an order for executing the plurality of switching operations; and
direct, based at least in part upon the determined order, the execution of each of the plurality of switching operations.

### Claim 13 (depends on 12)

The system of claim 12, wherein directing the execution of each of the plurality of switching operations comprises:
determining, by the control system for each of the plurality of switching operations, whether the switching operation is an automatic switching operation or a manual switching operation; and
directing, by the control system based at least in part on the determinations, the execution of the switching operation.

### Claim 14 (depends on 13)

The system of claim 13, wherein the switching operation is an automatic switching operation, and wherein the at least one processor is configured to direct the execution of the switching operation by executing the computer-executable instructions to:
direct communication of a command to execute the switching operation to an automatic switching control system.

### Claim 15 (depends on 13)

The system of claim 13, wherein the switching operation is a manual switching operation, and wherein the at least one processor is configured to direct the execution of the switching operation by executing the computer-executable instructions to:
direct the communication of a message to execute the switching operation to a user device associated with a field technician.

### Claim 16 (depends on 13)

The system of claim 13, wherein the at least one processor is further configured to execute the computer-executable instructions to:
receive an indication,that the switching operation has been completed; and
coordinate the synchronized execution of the plurality of switching operations based at least in part upon the received indication.

### Claim 17 (depends on 11)

The system of claim 11, wherein the at least one processor is further configured to execute the computer-executable instructions to:
direct conduction of a load balancing analysis within the power distribution network; and
modify, based at least in part upon the load balancing analysis, the switch plan.

### Claim 18 (depends on 11)

The system of claim 11, wherein the at least one processor is further configured to execute the computer-executable instructions to:
direct the communication of an indication that one or more switching operations have been executed to a distributed energy resource, the distributed energy resource configured to determine based at least in part on the indication, an effect of the one or more switching operations on a power delivery associated with the distributed energy resource.

### Claim 19 (depends on 11)

The system of claim 11, wherein the at least one processor is further configured to execute the computer-executable instructions to:
identify, based at least in part on the switch plan, an area of the power distribution network isolated as a result of the plurality of switching operations; and
direct an optimization of maintenance associated with the identified area.

### Claim 20 (depends on 19)

The system of claim 19, wherein the at least one processor is configured to direct the optimization of maintenance by executing the computer-executable instructions to:
direct the communication of information associated with a power outage for the isolated area to an asset management system, wherein the asset management system schedules maintenance associated with the isolated area based at least in part on the received information;
receive, from the asset management system, scheduled maintenance information for the isolated area; and
modify, based at least in part upon the scheduled maintenance information, the switch plan.