# US 2012/0253532 A1 · Systems and methods for forecasting electrical load

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2012/0253532 A1
- Document ID: US20120253532A1
- Status: Published application
- Kind: A1
- Application number: 13/075,618
- Filed: 2011-03-30
- Published: 2012-10-04
- Earliest claimed: 2011-03-30
- Assignees: General Electric Company
- Inventors: Dale Robert McMullin; Kenneth James Caird
- Web page: https://patentgrep.com/patent/US20120253532A1

## CPC

- G06Q 50/06: Energy or water supply
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR

## Abstract

Systems and methods for forecasting electrical load are provided. A baseline load forecast for a future time period may be determined by a forecasting system associated with a power utility. As desired, the forecasting system may include one or more computers. Information associated with at least one of (i) a scheduled demand for the future time period or (ii) a planned outage associated with the future time period may be determined by the forecasting system. Based at least in part on the determined information, the forecasting system may modify the baseline load forecast. Based at least in part on the modified baseline load forecast, the forecasting system may generate a bid contract for the future time period.

## Claims

### Claim 1

A method comprising:
determining, by a forecasting system associated with a power utility and comprising one or more computers, a baseline load forecast for a future time period;
determining, by the forecasting system, information associated with at least one of (i) a scheduled demand for the future time period or (ii) a planned outage associated with the future time period;
modifying, by the forecasting system based at least in part on the determined information, the baseline load forecast; and
generating, by the forecasting system based at least in part on the modified baseline load forecast, a bid contract for the future time period.

### Claim 2 (depends on 1)

The method of claim 1, further comprising:
determining, by the forecasting system, a renewable resource availability for the future time period,
wherein modifying the baseline load forecast comprises modifying the baseline load forecast based at least in part on the determined renewable resource availability.

### Claim 3 (depends on 2)

The method of claim 2, wherein determining a renewable resource availability comprises:
identifying, by the forecasting system, at least one renewable resource associated with the power utility;
obtaining, by the forecasting system, weather forecast data for the future time period; and
determining, by the forecasting system based at least in part on the weather forecast data, an expected output of the at least one renewable resource.

### Claim 4 (depends on 2)

The method of claim 2, wherein determining a renewable resource availability comprises:
identifying, by the forecasting system, one or more renewable resources associated with one or more customers of the power utility; and
determining, by the forecasting system, a potential impact of the one or more renewable resources on one or more load conditions for the future time period.

### Claim 5 (depends on 4)

The method of claim 4, wherein determining a potential impact of the one or more renewable resources on one or more load conditions comprises determining at least one of (i) an estimated output of the one or more renewable resources that will be supplied to a power distribution network during the future time period or (ii) an estimated output of the one or more renewable resources that will be consumed by the one or more customers during the future time period.

### Claim 6 (depends on 1)

The method of claim 1, wherein determining a baseline load forecast for a future time period comprises determining a baseline load forecast for a subsequent day.

### Claim 7 (depends on 1)

The method of claim 1, wherein determining a baseline load forecast comprises:
determining, by the forecasting system, a degree day associated with the future time period;
obtaining, by the forecasting system, historical load data;
identifying, by the forecasting system based at least in part upon the historical load data, a load associated with a historical degree day similar to the determined degree day; and
multiplying, by the forecasting system, the identified historical load by a load growth factor to determine the baseline load forecast.

### Claim 8 (depends on 1)

The method of claim 1, wherein determining information associated with a scheduled demand comprises:
obtaining, by the forecasting system for the future time period, scheduled electrical load data for one or more customers of the power utility; and
calculating, by the forecasting system based at least in part upon the obtained data, the scheduled demand.

### Claim 9 (depends on 8)

The method of claim 8, further comprising:
directing, by the forecasting system, the communication of a respective request for scheduled electrical load data to a respective device associated with each of the one or more customers,
wherein obtaining scheduled electrical load data comprises receiving the scheduled electrical load data in response to the one or more communicated requests.

### Claim 10 (depends on 1)

The method of claim 1, wherein determining information associated with a planned outage comprises:
identifying, by the forecasting system, a planned outage for the future time period;
determining, by the forecasting system, a switching schedule associated with the identified planned outage; and
determining, by the forecasting system, an impact of the planned outage and the switching schedule on one or more load conditions for the future time period.

### Claim 11

A system, comprising:
at least one memory configured to store computer-executable instructions; and
at least one processor configured to access the at least one memory and execute the computer-executable instructions to:
determine, for a power utility, a baseline load forecast for a future time period;
determine information associated with at least one of (i) a scheduled demand for the future time period or (ii) a planned outage associated with the future time period;
modify, based at least in part on the determined information, the baseline load forecast; and
generate, based at least in part on the modified baseline load forecast, a bid contract for the future time period.

### Claim 12 (depends on 11)

The system of claim 11, wherein the at least one processor is further configured to execute the computer-executable instructions to:
determine a renewable resource availability for the future time period; and
modify the baseline load forecast based at least in part on the determined renewable resource availability.

### Claim 13 (depends on 12)

The system of claim 12, wherein the at least one processor is configured to determine the renewable resource availability by executing the computer-executable instructions to:
identify at least one renewable resource associated with the power utility;
obtain weather forecast data for the future time period; and
determine, based at least in part on the weather forecast data, an expected output of the at least one renewable resource.

### Claim 14 (depends on 12)

The system of claim 12, wherein the at least one processor is configured to determine the renewable resource availability by executing the computer-executable instructions to:
identify one or more renewable resources associated with one or more customers of the power utility; and
determine a potential impact of the one or more renewable resources on one or more load conditions for the future time period.

### Claim 15 (depends on 14)

The system of claim 14, wherein the determined potential impact comprises at least one of (i) an estimated output of the one or more renewable resources that will be supplied to a power distribution network during the future time period or (ii) an estimated output of the one or more renewable resources that will be consumed by the one or more customers during the future time period.

### Claim 16 (depends on 11)

The system of claim 11, wherein the future time period comprises a subsequent day.

### Claim 17 (depends on 11)

The system of claim 11, wherein the at least one processor is configured to determine the baseline load forecast by executing the computer-executable instructions ’ to:
determine a degree day associated with the future time period;
obtain historical load data;
identify, based at least in part upon the historical load data, a load associated with a historical degree day similar to the determined degree day; and
multiply the identified historical load by a load growth factor to determine the baseline load forecast.

### Claim 18 (depends on 11)

The system of claim 11, wherein the at least one processor is configured to determine information associated with the scheduled demand by executing the computer-executable instructions to:
obtain, for the future time period, scheduled electrical load data for one or more customers of the power utility; and
calculate, based at least in part upon the obtained data, the scheduled demand.

### Claim 19 (depends on 18)

The system of claim 18, wherein the at least one processor is further configured to execute the computer-executable instructions to:
direct the communication of a respective request for scheduled electrical load data to a respective device associated with each of the one or more customers; and
obtain the scheduled electrical load data in response to the one or more communicated requests.

### Claim 20 (depends on 11)

The system of claim 11, wherein the at least one processor is configured to determine information associated with the planned power outage by executing the computer-executable instructions to:
identify a planned outage for the future time period;
determine a switching schedule associated with the identified planned outage; and
determine an impact of the planned outage and the switching schedule on one or more load conditions for the future time period.