# US 2012/0250653 A1 · Method and system for scheduling frequency physical resources based on frequency hopping

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2012/0250653 A1
- Document ID: US20120250653A1
- Status: Published application
- Kind: A1
- Application number: 13/258,101
- Filed: 2010-07-22
- Published: 2012-10-04
- Earliest claimed: 2009-10-16
- Assignees: Zte Corporation
- Inventors: Changsheng Zhang; Zhuo Yang
- Web page: https://patentgrep.com/patent/US20120250653A1

## CPC

- H04W 72/54: based on quality criteria
- H04B 1/7143: Arrangements for generation of hop patterns
- H04L 1/1893: {Physical mapping arrangements (physical resource mapping in general H04L5/00)}
- H04W 28/26: Resource reservation
- H04W 72/0453: Resources in frequency domain, e.g. a carrier in FDMA
- H04W: WIRELESS COMMUNICATION NETWORKS (broadcast communication H04H; communication systems using wireless links for non-selective communication, e.g. wireless extensions H04M1/72)
- H04B: TRANSMISSION
- H04L: TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION (arrangements common to telegraphic and telephonic communication H04M)

## Abstract

The disclosure discloses a method and a system for scheduling frequency physical resources based on frequency hopping. The method comprises: in two time slots of frequency hopping transmission, reserving frequency physical resources for an activated semi-persistent scheduling new transmission user with a transmission period reached and a retransmission user; obtaining a scheduling type of a user required for scheduling, and according to an occupancy situation of the frequency physical resources, obtaining corresponding available frequency physical resources when employing a frequency-selective scheduling type and a non-frequency-selective scheduling type; and according to the scheduling type of the user required for scheduling, searching for corresponding available frequency physical resources, and allocating the frequency physical resources to a frequency-selective scheduling user and a non-frequency-selective scheduling user simultaneously during one scheduling period. The disclosure comprehensively utilizes advantages of the frequency-selective scheduling and non-frequency-selective scheduling, so that the users with good channel quality can utilize the frequency-selective scheduling to obtain the optimal frequency resources, the users without channel quality information can obtain frequency diversity gain through frequency hopping, and the system capacity can be improved without increasing equipment costs.

## Claims

### Claim 1

A method for scheduling frequency physical resources based on frequency hopping, comprising:
in two time slots of frequency hopping transmission, reserving frequency physical resources for an activated semi-persistent scheduling new transmission user with a transmission period reached and a retransmission user;
obtaining a scheduling type of a user required for scheduling, and according to an occupancy situation of the frequency physical resources, obtaining corresponding available frequency physical resources when employing a frequency-selective scheduling type and a non-frequency-selective scheduling type; and
according to the scheduling type of the user required for scheduling, searching for corresponding available frequency physical resources, and allocating the frequency physical resources to a frequency-selective scheduling user and a non-frequency-selective scheduling user simultaneously during one scheduling period.

### Claim 2 (depends on 1)

The method according to claim 1, wherein when the scheduling type of the user required for scheduling is non-frequency-selective scheduling, allocating the frequency physical resources to the user comprises:
when first frequency physical resources, with a first time slot not occupied while a second time slot occupied, are found, allocating the first frequency physical resources with the first time slot not occupied to the non-frequency-selective scheduling user; or
when first frequency physical resources are not found and a band of second frequency physical resources with two continuous time slots not occupied is found, allocating this band of the second frequency physical resources to the non-frequency-selective scheduling user.

### Claim 3 (depends on 1)

The method according to claim 1, wherein when the scheduling type of the user required for scheduling is frequency-selective scheduling, allocating the frequency physical resources to the user comprises:
when a band of second frequency physical resources with two continuous time slots not occupied is found, allocating this band of the second frequency physical resources to the frequency-selective scheduling user.

### Claim 4 (depends on 1)

The method according to claim 1, wherein obtaining the scheduling type of the user required for scheduling comprises:
when uplink channel quality information of the user is obtained, the scheduling type of the user is the frequency-selective scheduling type;
when uplink channel quality information of the user is not obtained, the scheduling type of the user is the non-frequency-selective scheduling type based on frequency hopping transmission;
when the user is a semi-persistent scheduling user waiting for an activation, the scheduling type of the user is the non-frequency-selective scheduling type based on frequency hopping transmission.

### Claim 5 (depends on 1)

The method according to claim 1, further comprising:
when there are multiple users required for scheduling, constructing a scheduling queue according to scheduling priorities of the users;
taking out the users one by one from the scheduling queue, searching for corresponding available frequency physical resources according to the scheduling types of the users, and allocating the frequency physical resources to the users.

### Claim 6 (depends on 1)

The method according to claim 1, wherein,
the two time slots are one subframe employing intra-subframe frequency hopping; or
the two time slots are a new transmission subframe or retransmission subframe employing inter-subframe frequency hopping.

### Claim 7

A system for scheduling frequency physical resources based on frequency hopping, comprising: a resource reserving unit, a scheduling type obtaining unit, an available resource obtaining unit and a scheduling unit; wherein,
the resource reserving unit is configured to, in two time slots of frequency hopping transmission, reserve frequency physical resources for an activated semi-persistent scheduling new transmission user with a transmission period reached and a retransmission user;
the scheduling type obtaining unit is configured to obtain a scheduling type of a user required for scheduling;
the available resource obtaining unit is configured to, according to an occupancy situation of the frequency physical resources, obtain corresponding available frequency physical resources when employing a frequency-selective scheduling type and a non-frequency-selective scheduling type; and
the scheduling unit is configured to, according to the scheduling type of the user required for scheduling, search for corresponding available frequency physical resources, and allocate the frequency physical resources to a frequency-selective scheduling user and a non-frequency-selective scheduling user simultaneously during one scheduling period.

### Claim 8 (depends on 7)

The system according to claim 7, wherein the scheduling unit further comprises:
a first scheduling unit configured to, when the scheduling type of the user required for scheduling is non-frequency-selective scheduling, allocate the frequency physical resources to the user in the following ways: when first frequency physical resources, with a first time slot not occupied while a second time slot occupied, are found, the first scheduling unit is configured to allocate the first frequency physical resources with the first time slot not occupied to the non-frequency-selective scheduling user; or, when first frequency physical resources are not found and a band of second frequency physical resources with two continuous time slots not occupied is found, the first scheduling unit is configured to allocate this band of second frequency physical resources to the non-frequency-selective scheduling user.

### Claim 9 (depends on 7)

The system according to claim 7, wherein the scheduling unit further comprises:
a second scheduling unit configured to, when the scheduling type of the user required for scheduling is frequency-selective scheduling, allocate the frequency physical resources to the user in the following way: when a band of second frequency physical resources with two continuous time slots not occupied is found, the second scheduling unit is configured to allocate this band of the second frequency physical resources to the frequency-selective scheduling user.

### Claim 10 (depends on 7)

The system according to claim 7, wherein the scheduling type obtaining unit comprises a first type obtaining unit and a second type obtaining unit; wherein,
the first type obtaining unit is configured to, when uplink channel quality information of the user is obtained, identify the scheduling type of the user as the frequency-selective scheduling type;
the second type obtaining unit is configured to, when channel quality information of the user is not obtained, identify the scheduling type of the user as the non-frequency-selective scheduling type based on frequency hopping transmission, and identify the scheduling type of a semi-persistent scheduling user waiting for an activation as the non-frequency-selective scheduling type based on the frequency hopping transmission.

### Claim 11 (depends on 7)

The system according to claim 7, further comprising:
a scheduling queue constructing unit configured to, when there are multiple users required for scheduling, construct a scheduling queue according to scheduling priorities of the users; and
the scheduling unit is configured to take out users one by one from the scheduling queue, search for corresponding available frequency physical resources according to the scheduling types of the users, and allocate the frequency physical resources to the users.

### Claim 12 (depends on 7)

The system according to claim 7, wherein the system is applied in a communication system employing intra-subframe frequency hopping, and the two time slots are one subframe employing the intra-subframe frequency hopping; or
the system is applied in a communication system employing inter-subframe frequency hopping, and the two time slots are a new transmission subframe or retransmission subframe employing the inter-subframe frequency hopping.

### Claim 13 (depends on 2)

The method according to claim 2, wherein,
the two time slots are one subframe employing intra-subframe frequency hopping; or
the two time slots are a new transmission subframe or retransmission subframe employing inter-subframe frequency hopping.

### Claim 14 (depends on 3)

The method according to claim 3, wherein,
the two time slots are one subframe employing intra-subframe frequency hopping; or
the two time slots are a new transmission subframe or retransmission subframe employing inter-subframe frequency hopping.

### Claim 15 (depends on 4)

The method according to claim 4, wherein,
the two time slots are one subframe employing intra-subframe frequency hopping; or
the two time slots are a new transmission subframe or retransmission subframe employing inter-subframe frequency hopping.

### Claim 16 (depends on 5)

The method according to claim 5, wherein,
the two time slots are one subframe employing intra-subframe frequency hopping; or
the two time slots are a new transmission subframe or retransmission subframe employing inter-subframe frequency hopping.

### Claim 17 (depends on 8)

The system according to claim 8, wherein the system is applied in a communication system employing intra-subframe frequency hopping, and the two time slots are one subframe employing the intra-subframe frequency hopping; or
the system is applied in a communication system employing inter-subframe frequency hopping, and the two time slots are a new transmission subframe or retransmission subframe employing the inter-subframe frequency hopping.

### Claim 18 (depends on 9)

The system according to claim 9, wherein the system is applied in a communication system employing intra-subframe frequency hopping, and the two time slots are one subframe employing the intra-subframe frequency hopping; or
the system is applied in a communication system employing inter-subframe frequency hopping, and the two time slots are a new transmission subframe or retransmission subframe employing the inter-subframe frequency hopping.

### Claim 19 (depends on 10)

The system according to claim 10, wherein the system is applied in a communication system employing intra-subframe frequency hopping, and the two time slots are one subframe employing the intra-subframe frequency hopping; or
the system is applied in a communication system employing inter-subframe frequency hopping, and the two time slots are a new transmission subframe or retransmission subframe employing the inter-subframe frequency hopping.

### Claim 20 (depends on 11)

The system according to claim 11, wherein the system is applied in a communication system employing intra-subframe frequency hopping, and the two time slots are one subframe employing the intra-subframe frequency hopping; or
the system is applied in a communication system employing inter-subframe frequency hopping, and the two time slots are a new transmission subframe or retransmission subframe employing the inter-subframe frequency hopping.
