System and method for realizing a building system
AssigneeAditazz, Inc.
InventorsWard A. Vercruysse, Deepak J. Aatresh, Zigmund Rubel
Life of this patent
Estimating the term…
Loading patent…
AssigneeAditazz, Inc.
InventorsWard A. Vercruysse, Deepak J. Aatresh, Zigmund Rubel
Estimating the term…
A system and method for realizing a building system is disclosed. In an embodiment, a holistic approach to a complex building system involves using high-productivity high-performance computing resources, such as cloud services, to manage a complex building system from building inception through to building operation. Because high-productivity high-performance computing resources are used, modeling, optimization, simulation, and verification can be performed from a single platform on a scale which heretofore has not been applied to complex building systems. Additionally, the holistic approach to complex building systems involves using a centralized database to manage all of the information related to a building system.
A computer based method for realizing a building system, the method comprising:
A computer based method for realizing a building system within which healthcare services will be provided to patients, the method comprising:
A system comprising:
A system comprising:
Dependencies are inferred from the claim text.