Skirted Foundation For Penetrating Soft Material
AssigneeKeppel Offshore & Marine Technology Centre Pte Ltd
InventorsKOK SENG FOO, CHIN KAU QUAH, OKKY AHMAD PURWANA, HENRY KRISDANI
Life of this patent
Estimating the term…
Loading patent…
AssigneeKeppel Offshore & Marine Technology Centre Pte Ltd
InventorsKOK SENG FOO, CHIN KAU QUAH, OKKY AHMAD PURWANA, HENRY KRISDANI
Estimating the term…
The present invention provides a skirted foundation that can be used in a jack-up rig for providing enhanced bearing capacity. The skirted foundation comprises a spudcan footing having an upper part and a base, wherein the upper part and the base are coupled at their peripherals to form an outer edge, wherein both the upper part and the base have a flat or conical configuration, and wherein the upper part supports one leg of a jack-up rig, and the base has a flat bottom or downward slope, and a skirt having an upper end being integrally coupled to the spudcan footing and downwardly projected to encircle the base and a lower end for penetrating seabed, wherein the skirt comprises a plurality of circumferential openings adjacent to the base of the spudcan footing and located within the top half of the skirt height.
A skirted foundation comprising:
A jack-up rig comprising a working platform, a plurality of legs, and a plurality of skirted foundations, wherein each leg has two ends, one end coupled to the working platform for providing support and the other end is coupled with one skirted foundation so that the skirted foundations provide anchor and support for the jack-up rig;
A method for installing a skirted foundation, wherein the skirted foundation comprises a spudcan footing having an upper part and a base, wherein the upper part and the base are coupled at their peripherals to form an outer edge, wherein both the upper part and the base have a flat or conical configuration, and wherein the upper part supports one leg of a jack-up rig, and the base has a flat bottom or downward slope, and a skirt having an upper end being integrally coupled to the spudcan footing and downwardly projected to encircle the base and a lower end for penetrating seabed, wherein the skirt comprises a plurality of circumferential openings adjacent to the base of the spudcan footing and located within the top half of the skirt height, and wherein the openings are configured to allow soil to flow out of the interior space defined by the skirt and the base as the foundation descends into the seabed;