# US 2012/0084213 A1 · Business process development and run time tool

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2012/0084213 A1
- Document ID: US20120084213A1
- Status: Published application
- Kind: A1
- Application number: 12/897,284
- Filed: 2010-10-04
- Published: 2012-04-05
- Earliest claimed: 2010-10-04
- Assignees: International Business Machines Corporation
- Inventors: Asit Dan; Claus T. Jensen
- Web page: https://patentgrep.com/patent/US20120084213A1

## CPC

- G06Q 10/0635: Risk analysis of enterprise or organisation activities
- G06Q 10/0633: Workflow analysis
- G06Q 10/103: {Workflow collaboration or project management}
- G06Q 40/06: Asset management; Financial planning or analysis
- G06F 11/0781: {Error filtering or prioritizing based on a policy defined by the user or on a policy defined by a hardware/software module, e.g. according to a severity level}
- G06F 11/0793: {Remedial or corrective actions (recovery from an exception in an instruction pipeline G06F9/3861; by retry G06F11/1402; for recovering from a failure of a protocol instance or entity H04L69/40)}
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)

## Abstract

A process development and run time tool identifies dependent relationships between information sources and processes of an enterprise system at design time. The process development and run time tool determines a business value and business risk for each process and stores this information in an information source and process dependency table. The process development and run time tool determines if a particular information source is a critical business risk and if so adds redundancy for the critical risk information source and/or fault tolerance into the process design. An operating system assembles the dependent processes for run time evaluation. If a dependent information source fails at run time, the process development and run time tool identifies each process within the enterprise system that is dependent upon this failed information source. The process development and run time tool informs all stakeholders that rely on information from the failed information source, then prioritizes the elimination of failed information source defects that exceed a predetermined business risk threshold. The process development and run time tool may terminate at risk business processes that exceed a predetermined business risk threshold.

## Claims

### Claim 1

A computer implemented method, comprising:
forming at design time, by a process development and run time tool, a dependency table that includes a list of information sources with dependent processes, the dependency table further including a list of business values, each business value corresponding to a respective dependent process, the dependency table further including a list of business risks, each business risk corresponding to a respective dependent process, the dependency table further including a respective composite information source business risk for each information source in the list of information sources;
identifying at design time, by the process development and run time tool, those information sources of the list of information sources that exhibit a composite information source business risk that exceeds a predetermined business risk threshold, thus providing identified critical information sources;
providing at design time, fault tolerance to those processes dependent on identified critical information sources;
detecting at run time, by the process development and run time tool, information source failures of particular information sources, thus designating particular failed information sources;
identifying at run time, by the process development and run time tool, those processes dependent on the particular failed information sources as exhibiting information source defects;
disabling at run time, by the process development and run time tool, those processes dependent on the particular failed information sources;
communicating at run time, by the process development and run time tool, a list of terminated processes to stakeholders of the terminated processes;
prioritizing at run time, by the process development and run time tool, failures of particular information sources in accordance with business risk, the prioritizing at run time designating information source failures as critical information source failures or non-critical information source failures in accordance with the predetermined business risk threshold; and
bypassing at run time, by the process development and run time tool, those information source defects that correspond to critical information source failures.

### Claim 2 (depends on 1)

The method of claim 1, wherein the providing fault tolerance includes providing redundancy to identified critical information sources.

### Claim 3 (depends on 1)

The method of claim 1, further comprising assembling at design time each dependent process.

### Claim 4 (depends on 1)

The method of claim 1, wherein the predetermined business risk threshold is associated with critical business risk.

### Claim 5 (depends on 1)

The method of claim 1, wherein the identifying at run time step comprises accessing, by the process development and run time tool, the dependency table to determine those processes dependent on the particular information source.

### Claim 6 (depends on 1)

The method of claim 1, further comprising forming at design time the composite information source business risk for each information source by combining the business risks in the dependency table for each information source.

### Claim 7

An information handling system (IHS), comprising:
a processor;
information sources coupled to the processor;
a memory coupled to the processor, the memory being configured with a process development and run time tool to:
form at design time a dependency table that includes a list of information sources with dependent processes, the dependency table further including a list of business values, each business value corresponding to a respective dependent process, the dependency table further including a list of business risks, each business risk corresponding to a respective dependent process, the dependency table further including a respective composite information source business risk for each information source in the list of information sources;
identify at design time those information sources of the list of information sources that exhibit a composite information source business risk that exceeds a predetermined business risk threshold, thus providing identified critical information sources;
provide at design time fault tolerance to those processes dependent on identified critical information sources;
detect at run time information source failures of particular information sources, thus designating particular failed information sources;
identify at run time those processes dependent on the particular failed information sources as exhibiting information source defects;
disable at run time those processes dependent on the particular failed information sources;
communicate at run time a list of terminated processes to stakeholders of the terminated processes;
prioritize at run time failures of particular information sources in accordance with business risk, the prioritizing at run time designating information source failures as critical information source failures or non-critical information source failures in accordance with the predetermined business risk threshold; and
bypass at run time those information source defects that correspond to critical information source failures.

### Claim 8 (depends on 7)

The IHS of claim 7, wherein the fault tolerance includes redundancy of identified critical information sources.

### Claim 9 (depends on 7)

The IHS of claim 7, wherein each dependent process is assembled at design time.

### Claim 10 (depends on 7)

The IHS of claim 7, wherein the predetermined business risk threshold is associated with critical business risk.

### Claim 11 (depends on 7)

The IHS of claim 7, wherein the process development and run time tool accesses the dependency table at run time to determine those processes dependent on the particular information source.

### Claim 12 (depends on 7)

The IHS of claim 7, wherein the process development and run time tool forms the composite information source business risk for each information source at design time by combining the business risks in the dependency table for each information source.

### Claim 13

A process development and run time tool computer program product, comprising:
a computer readable storage medium;
first program instructions that form at design time a dependency table that includes a list of information sources with dependent processes, the dependency table further including a list of business values, each business value corresponding to a respective dependent process, the dependency table further including a list of business risks, each business risk corresponding to a respective dependent process, the dependency table further including a respective composite information source business risk for each information source in the list of information sources;
second program instructions that identify at design time those information sources of the list of information sources that exhibit a composite information source business risk that exceeds a predetermined business risk threshold, thus providing identified critical information sources;
third program instructions that provide at design time fault tolerance to those processes dependent on identified critical information sources;
fourth program instructions that detect at run time information source failures of particular information sources, thus designating particular failed information sources;
fifth program instructions that identify at run time those processes dependent on the particular failed information sources as exhibiting information source defects;
sixth program instructions that disable at run time those processes dependent on the particular failed information sources;
seventh program instructions that communicate at run time a list of terminated processes to stakeholders of the terminated processes;
eighth program instructions that prioritize at run time failures of particular information sources in accordance with business risk, the prioritizing at run time designating information source failures as critical information source failures or non-critical information source failures in accordance with the predetermined business risk threshold; and
ninth program instructions that bypass at run time those information source defects that correspond to critical information source failures,
wherein the first, second, third, fourth, fifth, sixth, seventh, eighth and ninth program instructions are stored on the computer readable storage medium.

### Claim 14 (depends on 13)

The process development and run time tool computer program product of claim 13, wherein the fault tolerance includes redundancy of identified critical information sources.

### Claim 15 (depends on 13)

The process development and run time tool computer program product of claim 13, wherein each dependent process is assembled at design time.

### Claim 16 (depends on 13)

The process development and run time tool computer program product of claim 13, wherein the predetermined business risk threshold is associated with critical business risk.

### Claim 17 (depends on 13)

The process development and run time tool computer program product of claim 13, further comprising tenth program instructions that access the dependency table at run time to determine those processes dependent on the particular information source.

### Claim 18 (depends on 13)

The process development and run time tool computer program product of claim 13, further comprising eleventh program instructions that form the composite information source business risk for each information source at design time by combining the business risks in the dependency table for each information source.