# US 2012/0083939 A1 · Dynamic control of small-scale electrical loads for matching variations in electric utility supply

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2012/0083939 A1
- Document ID: US20120083939A1
- Status: Published application
- Kind: A1
- Application number: 13/252,754
- Filed: 2011-10-04
- Published: 2012-04-05
- Earliest claimed: 2010-10-04
- Inventors: Roger W. Rognli
- Web page: https://patentgrep.com/patent/US20120083939A1

## CPC

- H02J 3/14: by switching loads on to, or off from, the networks, e.g. progressively balanced loading
- H02J 3/381: {Dispersed generators}
- H02J 13/1311: {using the power network as support for the transmission}
- H02J 13/1337: {involving the use of Internet protocols}
- H02J 13/14: the power network being locally controlled, e.g. home energy management systems [HEMS]
- H02J 13/333: the equipment forming part of substations
- H02J 2101/24: Photovoltaics
- H02J 2101/28: Wind energy
- H02J 2101/40: Hybrid power plants, i.e. a plurality of different generation technologies being operated at one power plant
- H02J 2105/12: supplying households or buildings
- H02J 2105/51: {according to a condition being electrical}
- H02J 2105/52: for limitation of the power consumption in the networks or in one section of the networks, e.g. load shedding or peak shaving
- Y02B 70/3225: Demand response systems, e.g. load shedding, peak shaving
- Y02E 10/56: Power conversion systems, e.g. maximum power point trackers
- Y02E 10/76: Power conversion electric or electronic aspects
- Y02E 40/70: Smart grids as climate change mitigation technology in the energy generation sector
- Y02E 60/00: Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
- Y04S 10/123: the energy generation units being or involving renewable energy sources
- Y04S 20/222: Demand response systems, e.g. load shedding, peak shaving
- Y04S 40/121: using the power network as support for the transmission
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- Y02B: CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y04S: SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS

## Abstract

A method of collectively controlling small-scale electrical loads receiving energy from an electricity grid that includes sources of renewable generation causing variable electricity supply so as to match collective electricity load to electricity supply. The method includes setting a runtime delay time, sensing a request for energy from the electrical loads, preventing the loads from receiving the energy for the first delay time, and adjusting the runtime delay time based on changes in electrical supply.

## Claims

### Claim 1

A method of controlling a small-scale electrical load receiving energy from an electricity grid that includes sources of renewable generation causing variations in electricity supply of the electricity grid, the small-scale electrical load coupled to a load-matching device having a timer and controller that manage electricity load to electricity supply for the electrical load, the method comprising:
setting the timer of the load-matching device to a runtime delay time;
sensing at the load-matching device a request for power from the electrical load;
starting the timer of the load-matching device in response to the request for power from the electrical load;
causing the load-matching device to prevent the electrical load from receiving power from the electricity supply while the timer is delaying for the runtime delay time;
sensing a first parameter of the electricity supply;
causing the load-matching device to automatically adjust the runtime delay time set in the timer based upon the first parameter, thereby adjusting a delay time prior to which the electrical load receives power from the electricity supply.

### Claim 2 (depends on 1)

The method of claim 1, wherein sensing at the load-matching device a request for power from the electrical load comprises sensing electrical current in an electrical line supplying power to the electrical load using a current transformer.

### Claim 3 (depends on 1)

The method of claim 1, wherein sensing a first parameter of the electricity supply comprises sensing a frequency of the electricity supply.

### Claim 4 (depends on 1)

The method of claim 1, wherein sensing a first parameter of the electricity supply comprises sensing a voltage of the electricity supply.

### Claim 5 (depends on 1)

The method of claim 1, wherein sensing a first parameter of the electricity supply comprises sensing a power factor of the electricity supply.

### Claim 6 (depends on 1)

The method of claim 1, wherein sensing a first parameter of the electricity supply comprises sensing a first parameter of the electricity supply at a remote location.

### Claim 7 (depends on 6)

The method of claim 6, wherein sensing a first parameter of the electricity supply comprises sensing a first parameter of the electricity supply at a premise where the electrical load is located.

### Claim 8 (depends on 1)

The method of claim 1 further comprising sensing a second parameter of the electricity supply, and causing the load-matching device to automatically adjust the runtime delay time set in the timer based upon the first and the second parameter.

### Claim 9 (depends on 1)

The method of claim 1, wherein setting the timer of the load-matching device to a runtime delay time comprises receiving a runtime delay time at a communication module of the load-matching device, the runtime delay time transmitted over a communications network by a remote controller.

### Claim 10 (depends on 1)

The method of claim 1, wherein setting the timer of the load-matching device to a runtime delay time comprises setting the timer of the load-matching device prior to installation at a premise.

### Claim 11 (depends on 1)

The method of claim 1, wherein causing the load-matching device to prevent the electrical load from receiving power from the electricity supply while the timer is delaying the runtime delay time comprises causing a switch of the load-matching device connected to a power line of the electrical load to open.

### Claim 12 (depends on 1)

The method of claim 1, wherein causing the load-matching device to automatically adjust the runtime delay time set in the timer based upon the first parameter comprises increasing a runtime delay time so as to decrease load on the electricity supply.

### Claim 13 (depends on 1)

The method of claim 1, wherein causing the load-matching device to automatically adjust the runtime delay time set in the timer based upon the first parameter comprises decreasing a runtime delay time so as to increase load on the electricity supply.

### Claim 14 (depends on 1)

The method of claim 1, wherein causing the load-matching device to automatically adjust the runtime delay time set in the timer based upon the first parameter comprises receiving an adjusted runtime delay time from a remote controller.

### Claim 15

A load-matching device to dynamically control a small-scale electrical load receiving energy from an electricity grid that includes sources of renewable generation causing variations in electricity supply so as to manage electricity load to the variable electricity supply, the device comprising:
a switch electrically connectable to a power line of the small-scale electrical load and configured to selectively delay power to the electrical load; and
a controller communicatively coupled to the switch, the controller including a timer defining a runtime delay time and a sensor that detects a request for power from the electrical load, the controller being configured to cause the switch to delay power to the electrical load for the runtime delay time and to automatically adjust the runtime delay time based on a first parameter sensed as to the electricity supply, thereby dynamically adjusting a delay time prior to which the electrical load receives power from the electricity supply.

### Claim 16 (depends on 15)

The load-matching device of claim 15, further comprising a communication module including a transceiver that communicates over a communications network.

### Claim 17 (depends on 16)

The load-matching device of claim 16, wherein the communication module is configured to receive the runtime delay time as transmitted from a remote source over the communications network.

### Claim 18 (depends on 15)

The load-matching device of claim 15, wherein the switch is a relay switch.

### Claim 19 (depends on 15)

The load-matching device of claim 15, wherein the electrical load comprises a resistive electrical load.

### Claim 20 (depends on 15)

The load-matching device of claim 15 further comprising a processor configured to adjust the runtime delay time based on the first parameter.

### Claim 21 (depends on 15)

The load-matching device of claim 15, further comprising a current sensor in communication with the controller and configured to detect a request for power from the electrical load.

### Claim 22

A load-matching device to dynamically control a small-scale electrical load receiving energy from an electricity grid that includes sources of renewable generation causing variations in electricity supply so as to manage electricity load to the variable electricity supply, the device comprising:
means for setting the timer of the load-matching device to a runtime delay time;
means for sensing at the load-matching device a request for power from the electrical load;
means for starting the timer of the load-matching device in response to the request for power from the electrical load;
means for causing the load-matching device to prevent the electrical load from receiving power from the electricity supply while the timer is delaying for the runtime delay time;
means for sensing a first parameter of the electricity supply; and
means for causing the load-matching device to automatically adjust the runtime delay time set in the timer based upon the first parameter, thereby adjusting a delay time prior to which the electrical load receives power from the electricity supply.

### Claim 23 (depends on 22)

The load-matching device of claim 22, wherein the means for sensing a first parameter of the electricity supply comprises sensing a first parameter selected from a group consisting of a frequency of the electricity supply, a voltage of the electricity supply, and a power factor of the electricity supply.

### Claim 24 (depends on 22)

The load-matching device of claim 22 further comprising means for sensing a second parameter of the electricity supply, and means for causing the load-matching device to automatically adjust the runtime delay time set in the timer based upon the first and the second parameter.

### Claim 25 (depends on 22)

The load-matching device of claim 22, wherein the means for setting the timer of the load-matching device to a runtime delay time comprises receiving a runtime delay time at a communication module of the load-matching device, the runtime delay time transmitted over a communications network by a remote controller.

### Claim 26 (depends on 22)

The load-matching device of claim 22, wherein the means for causing the load-matching device to prevent the electrical load from receiving power from the electricity supply while the timer is delaying the runtime delay time comprises causing a switch of the load-matching device connected to a power line of the electrical load to open.

### Claim 27 (depends on 22)

The load-matching device of claim 22, wherein the means for causing the load-matching device to automatically adjust the runtime delay time set in the timer based upon the first parameter comprises increasing a runtime delay time so as to decrease load on the electricity supply.

### Claim 28

A non-transitory, computer-readable medium storing instructions for implementing a method of controlling a small-scale electrical load receiving energy from an electricity grid that includes sources of renewable generation causing variations in electricity supply of the electricity grid, the small-scale electrical load coupled to a load-matching device having a timer and controller that manage electricity load to electricity supply for the electrical load, the method comprising:
setting the timer of the load-matching device to a runtime delay time;
sensing at the load-matching device a request for power from the electrical load;
starting the timer of the load-matching device in response to the request for power from the electrical load;
causing the load-matching device to prevent the electrical load from receiving power from the electricity supply while the timer is delaying for the runtime delay time;
sensing a first parameter of the electricity supply;
causing the load-matching device to automatically adjust the runtime delay time set in the timer based upon the first parameter, thereby adjusting a delay time prior to which the electrical load receives power from the electricity supply.

### Claim 29 (depends on 28)

The non-transitory, computer-readable medium of claim 28, wherein the method step of causing the load-matching device to prevent the electrical load from receiving power from the electricity supply while the timer is delaying the runtime delay time comprises causing a switch of the load-matching device connected to a power line of the electrical load to open.

### Claim 30 (depends on 28)

The non-transitory, computer-readable medium of claim 28, wherein the method step of causing the load-matching device to automatically adjust the runtime delay time set in the timer based upon the first parameter comprises increasing a runtime delay time so as to decrease load on the electricity supply.