# US 2012/0083914 A1 · Modeling tool for planning the operation of refineries

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2012/0083914 A1
- Document ID: US20120083914A1
- Status: Published application
- Kind: A1
- Application number: 13/007,877
- Filed: 2011-01-17
- Published: 2012-04-05
- Earliest claimed: 2010-10-05
- Assignees: ExxonMobil Research and Engineering Company
- Inventors: Gary R. KOCIS; Philip H. WARRICK; Victor P. DePAOLA
- Web page: https://patentgrep.com/patent/US20120083914A1

## CPC

- G05B 13/04: involving the use of models or simulators
- G05B 17/02: electric
- G06F 30/20: Design optimisation, verification or simulation (optimisation, verification or simulation of circuit designs G06F30/30)
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)

## Abstract

A modeling tool for determining the operation of a production facility. A variety of different activities can be modeled by the present invention, including (a) feed material selection, including quantity and timing, (b) product sales, including quantity and timing, (c) process operations, including process conditions and timing, (d) blending operations, including process conditions and timing, and/or (e) inventory management. The modeling tool may represent time using continuous-time, discrete-time, asynchronous time periods, synchronous time periods, and combinations of these various approaches.

## Claims

### Claim 1

A method for operating a production facility comprising:
(a) constructing a mathematical model of the production facility, wherein the mathematical model includes a representation of a first non-tank production entity, a second non-tank production entity, and a tank production entity;
wherein the first non-tank production entity is represented by a submodel containing a set of equations that model the behavior of the first non-tank production entity, the number of equations in the submodel being related to the number of operational time intervals for the first non-tank production entity;
wherein the second non-tank production entity is represented by a submodel containing a set of equations that model the behavior of the second non-tank production entity, the number of equations in the submodel being related to the number of operational time intervals for the second non-tank production entity;
wherein the tank entity is represented by a submodel containing a set of equations that model the behavior of the tank entity, the number of equations in the submodel being related to the number of operational time intervals for the first non-tank production entity and the number of operational time intervals for the second non-tank production entity;
(b) solving the mathematical model to obtain solution results for the first non-tank production entity, the second non-tank production entity, and the tank entity;
(c) using the solution results to determine an operational plan for the production facility; and
(d) operating the production facility according to the operational plan.

### Claim 2 (depends on 1)

The method of claim 1, wherein the submodel for the first non-tank production entity includes decision variables relating to the operation of the first non-tank production entity, and the submodel for the second non-tank production entity includes decision variables relating to the operation of the second non-tank production entity.

### Claim 3 (depends on 1)

The method of claim 1, wherein the number of operational time intervals for the first non-tank production entity, the second non-tank production entity, or both, are given as input.

### Claim 4 (depends on 1)

The method of claim 1, wherein the first non-tank production entity represents the transportation or purchase of feed material.

### Claim 5 (depends on 1)

The method of claim 1, wherein the second non-tank production entity represents the transportation or sale of products.

### Claim 6 (depends on 1)

The method of claim 1, wherein at least one of the first non-tank production entity or the second non-tank production entity represents the transportation, sale, or purchase of a feed material that is an intermediate material.

### Claim 7 (depends on 1)

The method of claim 1, wherein the mathematical model further comprises variables or mathematical relationships that represent the relationships between the operational time intervals of the tank entity with the operational time intervals of the first non-tank production entity and the second non-tank production entity.

### Claim 8 (depends on 1)

The method of claim 1, wherein the mathematical model further includes decision variables relating to the duration of each of the operational time intervals of the first non-tank production entity and the second non-tank production entity.

### Claim 9 (depends on 1)

The method of claim 1, wherein the mathematical model comprises an objective function for a performance metric of the production facility;
wherein the objective function comprises terms from the submodels for the first non-tank production entity, the second non-tank production entity, and the tank entity that contribute to the performance metric; and
wherein the mathematical model is solved for maximizing or minimizing the performance metric.

### Claim 10 (depends on 9)

The method of claim 9, wherein the mathematical model comprises:
parameters relating to the cost of feed materials;
parameters relating to the cost of holding inventory in the tank entity;
decision variables relating to the selection of feed materials;

### Claim 11 (depends on 10)

The method of claim 10, wherein the mathematical model further comprises:
parameters relating to the cost of transportation options; and
decision variables relating to transportation scheduling.

### Claim 12 (depends on 1)

The method of claim 1, wherein the tank entity is a first tank entity, and wherein the mathematical model further includes a representation of a second tank entity; and
wherein the second tank entity is represented by a submodel containing a set of equations that model the behavior of the second tank entity, the number of equations in the submodel being related to the number of operational time intervals for the second non-tank production entity.

### Claim 13 (depends on 12)

The method of claim 12, wherein the number of equations in submodel for the second tank entity is further related to the number of operational time intervals for the first tank entity.

### Claim 14 (depends on 12)

The method of claim 12, wherein the mathematical model further includes a representation of a third non-tank production entity that is represented by a submodel containing a set of equations that model the behavior of the third non-tank production entity, the number of equations in the submodel being related to the number of operational time intervals for the third non-tank production entity;
wherein the number of equations in the submodel for the second tank entity is further related to the number of operational time intervals for the third non-tank production entity.

### Claim 15 (depends on 1)

The method of claim 1, wherein the number of equations in the submodel for the first non-tank production entity is proportional to the number of operational time intervals for the first non-tank production entity; and
wherein the number of equations in the submodel for the second non-tank production entity is proportional to the number of operational time intervals for the second non-tank production entity.

### Claim 16 (depends on 1)

The method of claim 1, further comprising calculating the number of operational time intervals for the tank entity using the number of operational time intervals for the first non-tank production entity and the number of operational time intervals for the second non-tank production entity.

### Claim 17

A computer system that is programmed to perform steps that comprise:
(a) constructing a mathematical model of the production facility, wherein the mathematical model includes a representation of a first non-tank production entity, a second non-tank production entity, and a tank production entity;
wherein the first non-tank production entity is represented by a submodel containing a set of equations that model the behavior of the first non-tank production entity, the number of equations in the submodel being related to the number of operational time intervals for the first non-tank production entity;
wherein the second non-tank production entity is represented by a submodel containing a set of equations that model the behavior of the second non-tank production entity, the number of equations in the submodel being related to the number of operational time intervals for the second non-tank production entity;
wherein the tank entity is represented by a submodel containing a set of equations that model the behavior of the tank entity, the number of equations in the submodel being related to the number of operational time intervals for the first non-tank production entity and the number of operational time intervals for the second non-tank production entity;
(b) solving the mathematical model to obtain solution results for the first non-tank production entity, the second non-tank production entity, and the tank entity.

### Claim 18 (depends on 17)

The computer system of claim 17, wherein the mathematical model further includes decision variables relating to the duration of each of the operational time intervals of the first non-tank production entity and the second non-tank production entity.

### Claim 19

A non-transitory computer-readable storage medium comprising instructions for:
(a) constructing a mathematical model of the production facility, wherein the mathematical model includes a representation of a first non-tank production entity, a second non-tank production entity, and a tank production entity;
wherein the first non-tank production entity is represented by a submodel containing a set of equations that model the behavior of the first non-tank production entity, the number of equations in the submodel being related to the number of operational time intervals for the first non-tank production entity;
wherein the second non-tank production entity is represented by a submodel containing a set of equations that model the behavior of the second non-tank production entity, the number of equations in the submodel being related to the number of operational time intervals for the second non-tank production entity;
wherein the tank entity is represented by a submodel containing a set of equations that model the behavior of the tank entity, the number of equations in the submodel being related to the number of operational time intervals for the first non-tank production entity and the number of operational time intervals for the second non-tank production entity;
(b) solving the mathematical model to obtain solution results for the first non-tank production entity, the second non-tank production entity, and the tank entity.

### Claim 20 (depends on 19)

The computer-readable storage medium of claim 19, wherein the mathematical model further includes decision variables relating to the duration of each of the operational time intervals of the first non-tank production entity and the second non-tank production entity.