# US 2012/0074690 A1 · Step-to-step wedge thread connections and related methods

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2012/0074690 A1
- Document ID: US20120074690A1
- Status: Published application
- Kind: A1
- Application number: 13/310,241
- Filed: 2011-12-02
- Published: 2012-03-29
- Earliest claimed: 2010-09-24
- Assignees: Hydril Company
- Inventors: David Llewellyn Mallis; Gary W. Ward
- Web page: https://patentgrep.com/patent/US20120074690A1

## CPC

- B23P 11/00: Connecting or disconnecting metal parts or objects by metal-working techniques not otherwise provided for (connecting sheet metal or metal tubes, rods or profiles B21D39/00; riveting B21J; soldering, unsoldering, welding B23K; hand tools for connecting wire or strip B25B25/00; connecting metal parts by adhesives F16B11/00)
- E21B 17/0423: {with plural threaded sections, e.g. with two-step threads}
- F16L 15/002: {with more than one threaded section}
- F16L 15/06: characterised by the shape of the screw-thread
- Y10T 29/49826: Assembling or joining
- Y10T 29/49881: of separate helix [e.g., screw thread]
- B23P: METAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS (arrangements for copying or controlling B23Q)
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- F16L: PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- Y10T: TECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION

## Abstract

A threaded connection includes a pin member comprising a first pin step and a second pin step, and pin wedge threads disposed on each of the first and second pin steps and a box member comprising a first box step and a second box step, and box wedge threads disposed on each of the first and second box steps, wherein an axial separation of the first and second pin steps differs from an axial separation of the first and second box steps.

## Claims

### Claim 1

A threaded connection comprising:
a pin member comprising a first pin step and a second pin step, and pin wedge threads disposed on each of the first and second pin steps; and
a box member comprising a first box step and a second box step, and box wedge threads disposed on each of the first and second box steps;
wherein an axial separation of the first and second pin steps differs from an axial separation of the first and second box steps.

### Claim 2 (depends on 1)

The threaded connection of claim 1, wherein the axial separation of the first and second box steps is less than the axial separation of the first and second pin steps.

### Claim 3 (depends on 2)

The threaded connection of claim 2, further comprising:
corresponding stab flanks and load flanks on the corresponding first pin and box steps, wherein the corresponding load flanks are configured to engage before the corresponding stab flanks on the corresponding first pin and box steps; and
corresponding stab flanks and load flanks on the corresponding second pin and box steps, wherein the corresponding stab flanks are configured to engage before the corresponding load flanks on the corresponding second pin and box steps.

### Claim 4 (depends on 1)

The threaded connection of claim 1, wherein the axial separation of the first and second pin steps is less than the axial separation of the first and second box steps.

### Claim 5 (depends on 4)

The threaded connection of claim 4, further comprising:
corresponding stab flanks and load flanks on the corresponding first pin and box steps, wherein the corresponding stab flanks are configured to engage before the corresponding load flanks on the corresponding first pin and box steps; and
corresponding stab flanks and load flanks on the corresponding second pin and box steps, wherein the corresponding load flanks are configured to engage before the corresponding stab flanks on the corresponding second pin and box steps.

### Claim 6 (depends on 1)

The threaded connection of claim 1, further comprising a threadless mid-step region disposed between the first and second pin and box steps.

### Claim 7 (depends on 6)

The threaded connection of claim 6, further comprising a metal-to-metal mid-seal disposed between the first and second pin and box steps.

### Claim 8 (depends on 1)

The threaded connection of claim 1, wherein corresponding pin and box wedge threads on the first steps have a first wedge ratio and the corresponding pin and box wedge threads on the second steps have a second wedge ratio.

### Claim 9 (depends on 8)

The threaded connection of claim 8, wherein the corresponding pin and box wedge threads on the first steps engage before the corresponding pin and box wedge threads on the second steps.

### Claim 10 (depends on 8)

The threaded connection of claim 8, wherein the corresponding pin and box wedge threads on the first steps engage after the corresponding pin and box wedge threads on the second steps.

### Claim 11 (depends on 8)

The threaded connection of claim 8, wherein the corresponding pin and box wedge threads on the first steps engage simultaneously with the corresponding pin and box wedge threads on the second steps.

### Claim 12 (depends on 1)

The threaded connection of claim 1, wherein an axial separation of the first and second pins steps differs from an axial separation of the first and second box steps by between about 0.0005 inches and about 0.015 inches.

### Claim 13 (depends on 1)

The threaded connection of claim 1, wherein an axial separation of the first and second pins steps differs from an axial separation of the first and second box steps by about 0.002 and 0.005 inches.

### Claim 14 (depends on 1)

The threaded connection of claim 1, wherein an axial separation of the first and second pins steps differs from an axial separation of the first and second box steps by about 0.003 inches.

### Claim 15 (depends on 1)

The threaded connection of claim 1, wherein an axial separation of the first and second pins steps differs from an axial separation of the first and second box steps by about 0.0005 times the OD of the pipe.

### Claim 16 (depends on 1)

The threaded connection of claim 1, wherein the pin and box wedge threads comprise a generally dovetail-shaped cross-section.

### Claim 17 (depends on 1)

The threaded connection of claim 1, wherein clearance exists between roots and crests of the pin and box wedge threads on both the corresponding first and second pin and box steps at a final makeup.

### Claim 18 (depends on 1)

The threaded connection of claim 1, wherein interference exists between roots and crests of the pin and box wedge threads on both the corresponding first and second pin and box steps at a final makeup.

### Claim 19 (depends on 1)

The threaded connection of claim 1, wherein clearance exists between roots and crests of the pin and box wedge threads on the corresponding first pin and box steps, and interference exists between roots and crests of the pin and box wedge threads on the corresponding second pin and box steps at a final makeup.

### Claim 20 (depends on 1)

The threaded connection of claim 1, wherein interference exists between roots and crests of the pin and box wedge threads on the corresponding first pin and box steps, and clearance exists between roots and crests of the pin and box wedge threads on the corresponding second pin and box steps at a final makeup.

### Claim 21 (depends on 1)

The threaded connection of claim 1, wherein interference exists between roots and crests of the pin and box wedge threads on the corresponding first pin and box steps, and clearance exists between roots and crests of the pin and box wedge threads on the corresponding second pin and box steps at a final makeup.

### Claim 22 (depends on 1)

The threaded connection of claim 1, wherein the pin wedge threads and the box wedge threads interfere at thread roots and crests over all or a portion of the pin wedge threads and the box wedge threads.

### Claim 23 (depends on 1)

The threaded connection of claim 1, wherein the pin wedge threads and the box wedge threads interfere at thread roots on the first corresponding box and pin steps and at thread crests on the second corresponding box and pin steps, wherein there is a radial clearance between thread roots on the second corresponding box and pin steps and thread crests of the first corresponding box and pin steps.

### Claim 24 (depends on 1)

The threaded connection of claim 1, further comprising a vanishing box thread on the box member, wherein a thread height of the box thread diminishes along an axial length of the box thread.

### Claim 25

A threaded connection comprising:
a pin member comprising a first pin step and a second pin step, and pin wedge threads disposed on each of the first and second pin steps; and
a box member comprising a first box step and a second box step, and box wedge threads disposed on each of the first and second box steps;
wherein the pin wedge threads on at least one of the first and second pin steps and the corresponding box wedge threads on at least one of the first and second box steps are axially misaligned.

### Claim 26

A method of making up a threaded connection, the method comprising:
rotationally engaging a pin member having pin wedge threads with a box member having corresponding box wedge threads, wherein the pin and box wedge threads are formed on corresponding first and second pin and box steps of the pin and box members; and
engaging opposing pin and box stab and load flanks at different times during makeup of the threaded connection.

### Claim 27 (depends on 26)

The method of claim 26, further comprising:
engaging corresponding load flanks before stab flanks on the corresponding first pin and box steps;
engaging corresponding stab flanks before load flanks on the corresponding second pin and box steps.

### Claim 28 (depends on 26)

The method of claim 26, further comprising:
engaging corresponding stab flanks before load flanks on the corresponding first pin and box steps;
engaging corresponding load flanks before stab flanks on the corresponding second pin and box steps.

### Claim 29 (depends on 26)

The method of claim 26, further comprising engaging corresponding metal sealing surfaces disposed between first and second pin and box steps.
