Evaluating execution plan changes after a wakeup threshold time
AssigneeInternational Business Machines Corporation
InventorsRobert J. Bestgen, Robert V. Downer, Brian R. Muras
Life of this patent
Estimating the term…
Loading patent…
AssigneeInternational Business Machines Corporation
InventorsRobert J. Bestgen, Robert V. Downer, Brian R. Muras
Estimating the term…
In an embodiment an execution plan for a query is created. A wakeup threshold is set proportional to an amount of time taken by the creation of the execution plan. In various embodiments, the wakeup threshold is increased by a percentage equal to one minus a percentage of free resources at a computer system, is increased inversely proportional to an amount of execution time of a previous execution of the execution plan, or is decreased proportional to a number of times the execution plan was executed. A portion of the execution plan is executed to produce a portion of rows in a result set until the wakeup threshold expires. After the wakeup threshold expires, changes to the execution plan are evaluated.
A method comprising:
A computer-readable storage medium encoded with instructions, wherein the instructions when executed comprise:
A computer system, comprising:
Dependencies are inferred from the claim text.