Method, management procedure, process, an instrument and apparatus for delay estimation and mitigation of delay risks in projects and program
OwnerCristian Mircean, Oliver Mâckelinventors
Life of this patent
Estimating the term…
Loading patent…
OwnerCristian Mircean, Oliver Mâckelinventors
Estimating the term…
In a method of delay estimation and a project management tool with at least a delay estimation module, the delay estimation module and the method of delay estimation estimating delays at least by dividing a work breakdown structure of a project plan in a plurality of elements, identifying a plurality of risks and uncertainties in connection with the plurality of elements provided in the work breakdown structure, estimating a plurality of best duration uncertainty distributions for each element of the plurality of elements, synthesizing, using the plurality of best duration uncertainty distributions, a work breakdown structure of a project plan with uncertainties, and creating an estimate of delays for the project plan.
A method of delay estimation, comprising:
A project management tool, comprising
Dependencies are inferred from the claim text.