Method of manufacturing an article by diffusion bonding and superplastic forming
AssigneeROLLS-ROYCE plc
InventorRichard G. MILBURN
Life of this patent
Estimating the term…
Loading patent…
AssigneeROLLS-ROYCE plc
InventorRichard G. MILBURN
Estimating the term…
In a method of manufacturing an article (28) by diffusion bonding and superplastic forming stop off material (122) is applied to prevent diffusion bonding in a predetermined pattern on a first surface (106) of a first metal workpiece (100) and the predetermined pattern is spaced from the edges of the first surface (106) of the first metal workpiece (100). Stop off material (124) to prevent diffusion bonding is applied in a predetermined position on the first surface (106) of the first metal workpiece (100) and the predetermined position extends from the predetermined pattern of stop of material (122) on the first surface (106) of the first metal workpiece (100) towards one edge of the first surface (106) of the first metal workpiece (100). A recess (130, 132) is provided in a second predetermined position on the second surface (108) of the first metal workpiece (100) or a fourth surface (112) of a second metal workpiece (102), the recess (130,132) extends towards the same edge of the first metal workpiece (100) or a corresponding edge of the second metal workpiece (102). The first and second metal workpieces (100, 102) are diffusion bonded together. During superplastic forming the recess (130, 132) and the stop off material (124) in the predetermined position define an inflation passage (148) for superplastic forming of the metal workpieces (100, 102) to a hollow article (28).
A method of manufacturing an article by diffusion bonding and superplastic forming comprising the steps of:—
A method as claimed in claim wherein step d) comprises providing a first recess in a second predetermined position on the second surface of the first metal workpiece and a second recess in a third predetermined position on the fourth surface of the second metal workpiece, the first recess extending towards the same edge of the first metal workpiece and the second recess extending towards a corresponding edge of the second metal workpiece, step e) comprises assembling at least the first metal workpiece and the second metal workpiece in stack such that the first recess in the second predetermined position on the second surface of the first metal workpiece and the second recess in fourth surface of the second metal workpiece are aligned with the stop off material arranged in the predetermined position on the first surface of the first metal workpiece and step j) comprises heating and internally pressurising the sealed integral structure to cause the first metal workpiece and the second metal workpiece, where the stop off material was arranged in the predetermined position, the first recess was arranged in the second predetermined position and the second recess was arranged in the third predetermined position, to be hot formed to create an inflation passage within the sealed integral structure.
Dependencies are inferred from the claim text.