Paving machine control and method
AssigneeCaterpillar Trimble Control Technologies LLC
InventorsAndrew James Worsley, Jason Grier Lindsay Hill
Life of this patent
Estimating the term…
Loading patent…
AssigneeCaterpillar Trimble Control Technologies LLC
InventorsAndrew James Worsley, Jason Grier Lindsay Hill
Estimating the term…
A control and a method of control for a machine that applies a material to a subgrade at a work site and pulls a floating screed, having a screed plate, over the top surface of the material behind the machine is useful in paving with asphalt material. The floating screed is attached to the machine by a tow arm at a tow point on said tow arm. The vertical height of the tow point is controlled by an hydraulic cylinder on said machine in response to a valve control signal applied to an hydraulic valve by a valve control drive. The screed determines the thickness of the material on the subgrade and is manipulated by adjusting the height of the tow point. A first sensor is mounted on the floating screed for sensing three-dimensional position. A second sensor for senses the pitch of said screed. A processor circuit is responsive to the first and second sensors for determining the height of the trailing edge of the screed plate and the movement of the screed over the top surface of the material. An adjusted height error value is combined with a tow point correction value produced by a three dimensional positioning system to provide for adjustment of the tow point by no more than a predetermined amount as the screed plate travels a predetermined minimum distance.
A control for a machine that applies a material to a subgrade at a work site and pulls a floating screed having a screed plate over the top surface of the material behind the machine, said floating screed being attached to the machine by a tow arm at a tow point on said tow arm, the vertical height of said tow point being controlled by an hydraulic cylinder on said machine in response to a valve control signal applied to an hydraulic valve by a valve control drive, said screed determining the thickness of the material on the subgrade and being manipulated by adjusting the height of said tow point, comprising:
A method of controlling a machine that applies a material to a subgrade and pulls a floating screed having a screed plate over the top surface of the material behind the machine, said floating screed being attached to the machine by a tow arm at a tow point on said tow arm, the vertical height of said tow point being controlled by an hydraulic cylinder on said machine in response to a valve control signal applied to an hydraulic valve, said screed determining the thickness of the material on the subgrade and being manipulated by adjusting the height of said tow point such that the top surface of the material follows a reference surface, said machine having a sensor for sensing the position of the screed forward of the trailing edge of the screed plate, comprising the steps of:
A control for a machine that applies a material to a subgrade at a work site and pulls a floating screed having a screed plate over the top surface of the material behind the machine, said floating screed being attached to the machine by a tow arm at a tow point on said tow arm, the vertical height of said tow point being controlled by an hydraulic cylinder on said machine in response to a valve control signal applied to an hydraulic valve by a valve control drive, said screed determining the thickness of the material on the subgrade and being manipulated by adjusting the height of said tow point, comprising:
A method of controlling a machine that applies a material to a subgrade and pulls a floating screed having a screed plate over the top surface of the material behind the machine, said floating screed being attached to the machine by a tow arm at a tow point on said tow arm, the vertical height of said tow point being controlled by an hydraulic cylinder on said machine in response to a valve control signal applied to an hydraulic valve, said screed determining the thickness of the material on the subgrade and being manipulated by adjusting the height of said tow point such that the top surface of the material follows a reference surface, comprising the steps of:
Dependencies are inferred from the claim text.