System and method for concrete slab connection
AssigneeP.N.A. Construction Technologies, Inc.
InventorDonald S. Nadler
Life of this patent
Estimating the term…
Loading patent…
AssigneeP.N.A. Construction Technologies, Inc.
InventorDonald S. Nadler
Estimating the term…
Systems and methods of transferring loads between adjacent cast-in-place slabs, such as concrete slabs, and for accurately positioning dowels between adjacent sections of slabs are provided. A generally planar plate-type dowel is used which may be positioned within a cutaway in a preexisting slab of concrete. The dowel is shaped to generally conform to the shape of the cutaway, which is made by a saw blade. Once the dowel is positioned within the preexisting slab, a new slab is poured adjacent the preexisting slab. Rubber seals are included on the edges of the dowels to provide spacing or a gap between the dowel and the preexisting slab to allow for lateral independent movement of the adjacent slabs, and to prevent concrete from the newly poured second slab from entering into the gap. A saw unit for making a generally planar cut horizontally into an edge of a hardened concrete slab is also provided.
A method for transferring loads between first and second cast-in-place, substantially horizontal concrete slabs for substantially overcoming stresses in said slabs to avoid stress relief cracks therein, said method comprising the steps of:
An article of manufacture comprising at least first and second adjacent cast-in-place concrete slabs formed on a preexisting substantially horizontal slab support, said article of manufacture comprising:
A cutting unit for cutting multiple substantially horizontal aligned slots in a cast-in-place first concrete slab wherein dowel plates are provided with first portions to be received in said slots, wherein said concrete slab is of a type that has a base, a substantially horizontal upper surface, and wherein a substantially upright outer edge is formed between said base and said upper surface and wherein said slots are sized and shaped to receive said first portions of said dowel plates and wherein projecting unitary second portions of said dowel plates are to be embedded by a later poured second concrete slab adjacent said first concrete slab, said cutting unit comprising:
In a method of preparing a first concrete slab for receiving multiple planar dowels therein prior to pouring a second concrete slab adjacent to first concrete slab of said first concrete slab, said method comprising the steps of:
Dependencies are inferred from the claim text.