# US 2011/0222643 A1 · Cladding tube for nuclear fuel rod, method and apparatus for manufacturing a cladding tube

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2011/0222643 A1
- Document ID: US20110222643A1
- Status: Published application
- Kind: A1
- Application number: 13/121,917
- Filed: 2009-09-29
- Published: 2011-09-15
- Earliest claimed: 2008-09-30
- Assignees: Areva Np
- Inventors: Jean-Luc Doudoux; Eric Galban; Yves Charbonnier; Jérôme Boussin; Matthieu Ponce; Jan Patrice Simoneau; Jörg Peucker; Holger Schmidt; Klaus L. Nissen
- Web page: https://patentgrep.com/patent/US20110222643A1

## CPC

- B21B 21/02: Rollers therefor
- B21B 15/00: Arrangements for performing additional metal-working operations specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
- B21B 25/00: Mandrels for metal tube rolling mills, e.g. mandrels of the types used in the methods covered by group B21B17/00; Accessories or auxiliary means therefor {; Construction of, or alloys for, mandrels or plugs}
- B21H 8/00: Rolling metal of indefinite length in repetitive shapes specially designed for the manufacture of particular objects {, e.g. checkered sheets}
- G21C 3/06: Casings; Jackets
- G21C 3/07: characterised by their material, e.g. alloys
- G21C 3/08: provided with external means to promote heat-transfer, e.g. fins, baffles
- G21C 21/02: Manufacture of fuel elements or breeder elements contained in non-active casings
- B21B 21/00: Pilgrim-step tube-rolling {, i.e. pilger mills}
- Y02E 30/30: Nuclear fission reactors
- B21B: ROLLING OF METAL (auxiliary operations used in connection with metal-working operations covered in B21, see B21C; bending by rolling B21D; manufacture of particular objects, e.g. screws, wheels, rings, barrels, balls, by rolling B21H; pressure welding by means of a rolling mill B23K20/04)
- B21H: MAKING PARTICULAR METAL OBJECTS BY ROLLING, e.g. SCREWS, WHEELS, RINGS, BARRELS, BALLS (essentially from sheet metal B21D)
- G21C: NUCLEAR REACTORS (fusion reactors, hybrid fission-fusion reactors G21B; nuclear explosives G21J)
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION

## Abstract

A cladding tube for nuclear fuel made from metal and including concave dimples on its external surface. A nuclear fuel assembly includes at least a plurality of nuclear fuel rods provided with such cladding tubes. The cladding tube is advantageously manufactured by pilgrim rolling, the dimples being formed during the pilgrim rolling.

## Claims

### Claim at position 1

1-20. (canceled)

### Claim 21

A cladding tube for a nuclear fuel rod, the cladding tube being made from a metal, the cladding tube comprising dimples on an external surface.

### Claim 22 (depends on 21)

The cladding tube according to claim 21 wherein the cladding tube comprises an internal surface, the internal surface being smooth.

### Claim 23 (depends on 21)

The cladding tube according to claim 21 wherein the cladding tube has an external diameter between 6 and 20 mm.

### Claim 24 (depends on 21)

The cladding tube according to claim 21 wherein the cladding tube has a wall thickness between 0.4 and 1.5 mm.

### Claim 25 (depends on 24)

The cladding tube according to claim 24 wherein each dimple has a depth between 10% and 60% of the wall thickness of the cladding tube.

### Claim 26 (depends on 21)

The cladding tube according to claim 21 wherein each dimple has a contour in a shape of an ellipse or a circle.

### Claim 27 (depends on 26)

The cladding tube according to claim 26 wherein the contour of each dimple has a maximum dimension greater than 0.8 mm.

### Claim 28 (depends on 21)

The cladding tube according to claim 21 wherein the cladding tube is made from a zirconium-based alloy.

### Claim 29 (depends on 21)

The cladding tube according to claim 21 wherein the dimples are obtained by punching.

### Claim 30 (depends on 21)

A nuclear fuel assembly comprising: a bundle of nuclear fuel rods, each of the fuel rods comprising a cladding tube filled with a stack of nuclear fuel pellets, wherein the cladding tube of at least one of the fuel rods is the cladding tube according to claim 21.

### Claim 31

A method of manufacture by pilgrim rolling of a metal cladding tube from a tubular blank, the method comprising the following steps: progressively deforming a blank by rolling between a mandrel inserted inside the blank and two dies disposed about the mandrel;
reciprocally moving the two dies along the mandrel; and advancing the blank along the mandrel between reciprocating movements of the dies, wherein dimples are formed on an external surface of the blank during the rolling of the blank.

### Claim 32 (depends on 31)

The method according to claim 31 wherein the dimples are formed with the aid of at least one punch disposed on one of the dies.

### Claim 33 (depends on 32)

The method according to claim 32 wherein the diameter of the blank is reduced during the pilgrim rolling.

### Claim 34 (depends on 31)

The method according to claim 31 wherein the dimples are formed at a front end of the mandrel with respect to a direction of advancing the blank along the mandrel during the pilgrim rolling.

### Claim 35 (depends on 31)

The method according to claim 31 wherein the blank is turned about an axis of the mandrel between reciprocating movements of the dies.

### Claim 36 (depends on 31)

The method according to claim 31 wherein the metal cladding tube has a smooth internal surface.

### Claim 37

A pilgrim rolling apparatus for the manufacture of a metal tube from a tubular blank, the pilgrim rolling apparatus comprising: at least two dies; and a mandrel received between the dies mounted to carry out reciprocating movements along the mandrel for rolling a blank fitted onto the mandrel between the mandrel and the dies, wherein at least one of the dies has at least one punch to form dimples on an external surface of the blank fitted on the mandrel during the reciprocating movements of the dies.

### Claim 38 (depends on 37)

The apparatus according to claim 37 wherein each die comprises a peripheral groove, the grooves of the dies forming a passage for the mandrel between the dies, each punch being disposed at a base of the groove of the corresponding die.

### Claim 39 (depends on 38)

The apparatus according to claim 38 wherein the mandrel is of convergent shape along an axis of the mandrel, the or each punch being disposed in a calibration region of the groove of the corresponding die defining the passage for the mandrel when the dies are advanced and surround an end of the mandrel with a smaller diameter.

### Claim 40 (depends on 37)

The apparatus according to claim 37 wherein each die comprises at least one punch.
