# US 2011/0168796 A1 · Method, system and devices for railroad track reconditioning and repair

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2011/0168796 A1
- Document ID: US20110168796A1
- Status: Published application
- Kind: A1
- Application number: 12/686,016
- Filed: 2010-01-12
- Published: 2011-07-14
- Earliest claimed: 2010-01-12
- Assignees: Delta Railroad Construction, Inc.
- Inventors: Larry Laurello; Paul Laurello; Michael Laurello; Rick Ryel
- Web page: https://patentgrep.com/patent/US20110168796A1

## CPC

- E01B 29/40: Means or arrangements for temporarily supporting laid tracks, or rails or sleepers in the track (temporary fishplates E01B11/18)
- Y10T 29/4973: Replacing of defective part
- E01B: PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS (derailing or rerailing blocks on track, track brakes or retarders B61K)
- Y10T: TECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION

## Abstract

A method, system and devices for reconditioning, repair and replacement of railroad track components including direct fixation fasteners includes the use of temporary direct fixation fasteners which serve as temporary rail support and fastening and as guides for installation of permanent anchor inserts for installation and anchoring of new permanent direct fixation fasteners. The method of use of the temporary direct fixation fasteners enables operational use of the railroad line at various stages throughout reconditioning, repair and replacement processes.

## Claims

### Claim 1

A method of replacing existing direct fixation fasteners attached to rails of a railroad, wherein each existing direct fixation fastener is supported by a substrate and anchored to the substrate by nuts on existing anchor studs and attached to the rails by clips, the method comprising the steps of:
removing the existing direct fixation fasteners from rails by removing the nuts from the existing anchor studs and removing the clips from the rails;
installing temporary direct fixation fasteners on the substrate by securing the temporary direct fixation fasteners to the existing anchor studs by use of nuts, and clipping the rails to the temporary direct fixation fasteners by installation of clips which extend from the temporary direct fixation fasteners to the rails supported by the temporary direct fixation fasteners;
forming holes in the substrate for permanent anchor inserts by inserting a drill through permanent anchor insert openings in the temporary direct fixation fasteners;
installing permanent anchor inserts in the substrate by inserting the permanent anchor inserts through the permanent anchor insert openings in the temporary direct fixation fasteners;
removing the temporary direct fixation fasteners from the substrate by removing the nuts from the existing anchor studs, and removing the temporary direct fixation fasteners from the rails;
eliminating the existing anchor studs from above the surface of the substrate;
placing permanent direct fixation fasteners on the substrate and over the permanent anchor inserts, and fastening the permanent direct fixation fasteners to the permanent anchor inserts by engaging and tightening permanent bolts with the permanent anchor inserts, and
attaching the rails to the permanent direct fixation fasteners by installation of clips which extend from the permanent direct fixation fasteners to the rails.

### Claim 2 (depends on 1)

The method of claim 1 further comprising the step of placing a temporary positioning collar about each of the permanent anchor inserts, and placing the temporary positioning collar in contact with the permanent anchor insert openings in the temporary direct fixation fasteners, whereby the permanent anchor insert is held in position in the permanent anchor insert hole by the temporary direct fixation fastener and the temporary positioning collar.

### Claim 3 (depends on 2)

The method of claim 2 further comprising the step of bonding the permanent anchor insert to the permanent anchor insert hole with epoxy while the permanent anchor insert is held in position in the permanent anchor insert hole by the temporary direct fixation fastener and the temporary positioning collar.

### Claim 4 (depends on 1)

The method of claim 1 further comprising the step of installing one or more gauge rods between parallel rails of a railroad prior to removing existing direct fixation fasteners from the rail.

### Claim 5 (depends on 1)

The method of claim 1 further comprising the step of positioning each of the temporary direct fixation fasteners on the substrate by adjustment of the position of the temporary direct fixation fasteners relative to the existing anchor studs.

### Claim 6 (depends on 1)

The method of claim 1 further comprising the step of installing a pad under each temporary direct fixation fastener between a bottom surface of the temporary direct fixation fastener and the substrate under the temporary direct fixation fastener.

### Claim 7 (depends on 1)

The method of claim 1 further comprising the step of installing at least one pad over a rail supporting surface of the temporary direct fixation fastener.

### Claim 8 (depends on 1)

The method of claim 1 wherein the step of clipping the rails to the temporary direct fixation fasteners is performed by engaging clips with clip shoulders on the temporary direct fixation fasteners and placing the clips in contact with a base of the rails.

### Claim 9 (depends on 8)

The method of claim 8 further comprising the step of installing an insulator between the clip and the base of the rails.

### Claim 10 (depends on 1)

The method of claim 1 further comprising the step of aligning a drill for forming holes in the substrate for the permanent anchor inserts with side walls of the permanent anchor insert openings in the temporary direct fixation fasteners.

### Claim 11 (depends on 10)

The method of claim 10 wherein a portion of the drill is placed in contact with a rail which is supported by the temporary direct fixation fastener through which a drill bit of the drill is passed to form a hole in the substrate for a permanent anchor insert.

### Claim 12 (depends on 1)

The method of claim 1 further comprising the step of installing epoxy in the holes for the permanent anchor inserts prior to insertion of the permanent anchor inserts in the permanent anchor insert holes.

### Claim 13 (depends on 2)

The method of claim 2 further comprising the step of installing epoxy in the holes for the permanent anchor inserts prior to insertion of the permanent anchor inserts in the permanent anchor insert holes.

### Claim 14 (depends on 1)

The method of claim 1 further comprising the step of using the railroad in operation with the rails supported by and clipped to the temporary direct fixation fasteners.

### Claim 15 (depends on 1)

The method of claim 1 further comprising the step of removing the clips from the temporary direct fixation fasteners prior to forming the holes in the substrate for the permanent anchor inserts.

### Claim 16 (depends on 1)

The method of claim 1 further comprising the step of reconditioning or repairing or replacing the substrate prior to or after installation of the temporary direct fixation fasteners.

### Claim 17 (depends on 1)

The method of claim 1 further comprising the step of using the railroad in operation with permanent anchor insert holes formed in the substrate.

### Claim 18 (depends on 1)

The method of claim 1 further comprising the step of using the railroad in operation with permanent anchor inserts installed in the substrate.

### Claim 19 (depends on 2)

The method of claim 2 further comprising the step of using the railroad in operation with permanent anchor inserts installed in the substrate.

### Claim 20 (depends on 1)

The method of claim 1 further comprising the step of cutting the existing anchor studs at or below a surface of the substrate.

### Claim 21 (depends on 20)

The method of claim 20 further comprising the step of sealing ends of the existing anchor studs proximate to a surface of the substrate.

### Claim 22 (depends on 1)

The method of claim 1 further comprising the step of removing the temporary bolts from permanent anchor inserts prior to placing the permanent direct fixation fastener on the substrate and over the permanent anchor inserts.

### Claim 23 (depends on 2)

The method of claim 2 further comprising the step of removing the temporary positioning collar prior to placing the permanent direct fixation fastener on the substrate and over the new permanent anchor inserts and prior to tightening the bolts with the permanent anchor inserts.

### Claim 24

A method of replacement of existing direct fixation fasteners of rails of a railroad track wherein the existing direct fixation fasteners which support the rails of the railroad track are secured by nuts threaded on to existing anchor studs which extend upward from a substrate, the method comprising the steps of:
lifting a rail from the existing direct fixation fasteners;
removing the existing direct fixation fasteners from the existing anchor studs and the substrate;
installing temporary direct fixation fasteners on the existing anchor studs and on the substrate by positioning the temporary direct fixation fasteners so that the existing anchor studs extend through existing anchor stud openings in the temporary direct fixation fasteners, and securing the temporary direct fixation fasteners by use of nuts to the existing anchor studs;
forming permanent anchor insert holes in the substrate by passing a drill through permanent anchor insert openings in the temporary direct fixation fasteners, and
installing permanent anchor inserts in the permanent anchor insert holes in the substrate by passing the permanent anchor inserts through the permanent anchor insert openings in the temporary direct fixation fasteners.

### Claim 25 (depends on 24)

The method of claim 24 further comprising the step of securing a rail to the temporary direct fixation fasteners by clips which extend from the temporary direct fixation fasteners to the rail prior to formation of the permanent anchor insert holes in the substrate.

### Claim 26 (depends on 24)

The method of claim 24 further comprising the step of securing a rail to the temporary direct fixation fasteners by clips which extend from the temporary direct fixation fasteners to the rail after formation of the permanent anchor insert holes in the substrate.

### Claim 27 (depends on 24)

The method of claim 24 further comprising the step of securing a rail to the temporary direct fixation fasteners by clips which extend from the temporary direct fixation fasteners to the rail after formation of the permanent anchor insert holes in the substrate and after installation of permanent anchor inserts in the permanent anchor insert holes.

### Claim 28 (depends on 24)

The method of claim 24 wherein the step of installing permanent anchor inserts in the permanent anchor insert holes in the substrate by passing the permanent anchor inserts through the permanent anchor insert openings in the temporary direct fixation fasteners further comprises the step of installing the permanent anchor inserts in epoxy in the permanent anchor insert holes.

### Claim 29 (depends on 24)

The method of claim 24 wherein the step of installing permanent anchor inserts in the permanent anchor insert holes further comprises the step of suspending the permanent anchor inserts in the permanent anchor insert holes by using a temporary bolt in the permanent anchor inserts, with a head of the temporary bolt supported by the permanent anchor insert opening in the temporary direct fixation fastener.

### Claim 30 (depends on 29)

The method of claim 29 further comprising the step of installing a temporary positioning collar on the permanent anchor insert prior to insertion into the permanent anchor insert hole and through the permanent anchor insert opening in the temporary direct fixation fastener, and locating the temporary positioning collar in the permanent anchor insert opening in the temporary direct fixation fastener.

### Claim 31

A system for reconditioning or repair of a railroad track having rails attached to existing direct fixation fasteners supported by a substrate and for repair or replacement of the existing direct fixation fasteners, the system comprising temporary direct fixation fasteners configured to be temporarily installed upon existing anchor studs and in place of the existing direct fixation fasteners, the temporary direct fixation fasteners having openings for the existing anchor studs, a rail bearing surface, openings for permanent anchor inserts, and clip shoulders for attachment of clips between the temporary direct fixation fasteners and a rail supported by the temporary direct fixation fasteners, and permanent anchor inserts installed through the permanent anchor insert openings in the temporary direct fixation fastener, whereby the railroad track can be placed in a fully operational state with the temporary direct fixation fasteners installed in place of the existing direct fixation fasteners after formation of holes in the substrate for the permanent anchor inserts.

### Claim 32 (depends on 31)

The system of claim 31 wherein the railroad track can be placed in a fully operation state with the temporary direct fixation fasteners installed in place of the existing direct fixation fasteners after formation of holes in the substrate for the permanent anchor inserts and after installation of the permanent anchor inserts.

### Claim 33 (depends on 31)

The system of claim 31 further comprising a temporary positioning collar which fits with the temporary direct fixation fastener and the permanent anchor insert to position and hold the permanent anchor insert relative to the temporary direct fixation fastener and a hole in the substrate formed through permanent anchor insert openings in the temporary direct fixation fastener.

### Claim 34 (depends on 31)

The system of claim 31 wherein the openings in the temporary direct fixation fastener for the existing anchor studs are oversized.

### Claim 35 (depends on 31)

The system of claim 31 wherein the permanent anchor insert openings in the temporary direct fixation fastener are configured as guides for a drill bit to form permanent anchor insert holes in the substrate.

### Claim 36 (depends on 32)

The system of claim 32 wherein the permanent anchor inserts and temporary positioning collar are substantially flush with a top surface of the temporary direct fixation fastener when fully installed in the permanent anchor insert holes in the substrate.

### Claim 37 (depends on 31)

The system of claim 31 further comprising clips engaged with the clip shoulders of the temporary direct fixation fasteners and a rail supported by the temporary direct fixation fasteners.

### Claim 38 (depends on 37)

The system of claim 37 wherein the clip shoulders and clips are located proximate to the permanent anchor insert openings in the temporary direct fixation fastener.

### Claim 39 (depends on 31)

The system of claim 31 further comprising an insulator between the clips and the rail.