LNG Containment System and Method of Assembling LNG Containment System
AssigneeExxonMobil Upstream Research Company
InventorsKailash C. Gulati, Thomas A. Ballard, Alexander V. Krimotat
Life of this patent
Estimating the term…
Loading patent…
AssigneeExxonMobil Upstream Research Company
InventorsKailash C. Gulati, Thomas A. Ballard, Alexander V. Krimotat
Estimating the term…
An LNG system generally comprises a primary container, and a secondary container positioned around the primary container. The secondary container generally comprises a first end wall, a second end wall, and at least two side walls. At least one of the walls is fabricated from a plurality of prefabricated wall panels. Each of the wall panels is fabricated from a combination of concrete and steel. The wall panels are preferably prefabricated offsite, and then transported to the construction site where they are adjoined together in end-to-end fashion to form walls. A method for constructing a full containment LNG system is also provided. In one embodiment, walls and a roof for a secondary container are assembled, but leaving an end open. At least one primary tank is brought into the secondary container. A second end wall is then erected to form the enclosure for the secondary container.
A method of assembling an LNG full containment system, comprising the steps of:
A method for assembling an LNG full containment system, comprising the steps of:
Dependencies are inferred from the claim text.