System feasible duration evaluation method for project management under budget and time constraints
AssigneeNational Taiwan University of Science and Technology
InventorYi-Kuei Lin
Life of this patent
Estimating the term…
Loading patent…
AssigneeNational Taiwan University of Science and Technology
InventorYi-Kuei Lin
Estimating the term…
A system feasible duration evaluation method for project management under budget and time constraint is disclosed. The project includes plural arcs between a start node and a terminal node in a virtual network. The method includes the steps of providing a virtual network in a computer for simulating the project; inputting a plurality of activity, a budget constraint and a time constraint; distributing orderly the activity in the virtual network; defining a duration vector; checking if the activity duration satisfy the time constraint for dealing the activity in the duration vector of the minimal path; checking if the activity cost satisfy the budget constraint for dealing the activity in the duration vector; defining a upper duration vector; defining a lower duration vector; and listing the system feasible durations that satisfies the upper duration vector and the lower duration vector.
A system feasible duration evaluation method for project management under budget and time constraints, using a computer containing an input unit, an operation unit and an output unit to execute a feasible duration evaluation software which provides a virtual network for simulating a project, the virtual network having a start node, a terminal node and plural arcs, wherein the unit of the arc is a duration and the arcs are located between the start node and the terminal node for constituting plural minimal paths, the method comprising the steps of:
Dependencies are inferred from the claim text.