# US 2010/0300691 A1 · Permeability flow balancing within integral screen joints and method

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2010/0300691 A1
- Document ID: US20100300691A1
- Status: Published application
- Kind: A1
- Application number: 12/476,843
- Filed: 2009-06-02
- Published: 2010-12-02
- Earliest claimed: 2009-06-02
- Assignees: Baker Hughes Incorporated
- Inventors: MICHAEL H. JOHNSON; NAMHYO KIM
- Web page: https://patentgrep.com/patent/US20100300691A1

## CPC

- E21B 43/2406: {Steam assisted gravity drainage [SAGD]}
- E21B 2200/02: Down-hole chokes or valves for variably regulating fluid flow
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS

## Abstract

A method for uniform heating of a formation including applying a high temperature fluid to a tubular located within an open hole formation borehole; modifying a permeability of the tubular along its length by reducing permeability at a heel of the borehole and by increasing permeability towards a toe of the borehole; and impeding annular movement of the heated fluid by radially extending one or more baffles from the tubular.

## Claims

### Claim 1

A method for uniform heating of a formation comprising:
applying a high temperature fluid to a tubular located within an open hole formation borehole;
modifying a permeability of the tubular along its length by reducing permeability at a heel of the borehole and by increasing permeability towards a toe of the borehole; and
impeding annular movement of the heated fluid by radially extending one or more baffles from the tubular.

### Claim 2 (depends on 1)

A method as claimed in claim 1 wherein the method further comprises anchoring a plurality of portions of the tubular; and
Restricting thermal growth of the tubular with the plurality of anchors.

### Claim 3 (depends on 1)

A method as claimed in claim 1 wherein the impeding is by sealing an annulus defined between the tubular and the formation.

### Claim 4 (depends on 1)

A method as claimed in claim 1 wherein the impeding is by extending the baffles into proximity with the formation.

### Claim 5 (depends on 1)

A method as claimed in claim 1 wherein the applying is by injecting steam into the tubular.

### Claim 6 (depends on 1)

A method as claimed in claim 1 wherein the modifying is by positioning one or more permeability control devices in the tubular to control pressure drop across the tubular.

### Claim 7 (depends on 6)

A method as claimed in claim 6 wherein the permeability control devices are configured to be less permeable at a heel of the borehole than at a toe of the borehole.

### Claim 8 (depends on 6)

A method as claimed in claim 6 wherein the one or more permeability control devices is a number of devices positioned in the tubular each having a distinct permeability which increases as the devices become closer to the toe.

### Claim 9 (depends on 1)

A method as claimed in claim 1 wherein the impeding is forcing high temperature fluid to enter the formation in discrete areas between the one or more baffles.

### Claim 10 (depends on 1)

A method as claimed in claim 1 further includes creating a uniformly distributed temperature profile in the formation.
