# US 2010/0250746 A1 · Information technology source migration

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2010/0250746 A1
- Document ID: US20100250746A1
- Status: Published application
- Kind: A1
- Application number: 12/413,902
- Filed: 2009-03-30
- Published: 2010-09-30
- Earliest claimed: 2009-03-30
- Assignees: Hitachi, Ltd.
- Inventors: Atsushi MURASE
- Web page: https://patentgrep.com/patent/US20100250746A1

## CPC

- G06F 11/3409: {for performance assessment}
- G06F 9/50: Allocation of resources, e.g. of the central processing unit [CPU]
- G06F 9/5088: {involving task migration}
- G06F 11/3433: {for load management (allocation of a server based on load conditions G06F9/505; load rebalancing G06F9/5083; redistributing the load in a network by a load balancer H04L67/1029)}
- G06F 11/3476: {Data logging (G06F11/14, G06F11/2205 take precedence)}
- G06F 2201/815: Virtual
- G06F 2201/87: Monitoring of transactions
- G06F 2201/875: Monitoring of systems including the internet
- G06F 2201/88: Monitoring involving counting
- H04L 43/0888: Throughput
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- H04L: TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION (arrangements common to telegraphic and telephonic communication H04M)

## Abstract

A method of managing IT sources among a first computer system and at least one computer service system comprises obtaining a resource utilization trend of the first computer system based on a history of utilization of an IT resource in the first computer system; obtaining a data sending throughput rate from the first computer system to each of the at least one computer service system; and, based on the resource utilization trend and the data sending throughput rate, selecting a target computer service system to migrate a workload from the first computer system, determining a start time to start a precede data copy associated with the workload to be migrated, prior to switching over processing of the workload at a switching time, and starting the precede data copy from the first computer system to the target computer service system at the start time.

## Claims

### Claim 1

A method of managing IT (Information Technology) sources among a first computer system and at least one computer service system which are connected with a network, the method comprising:
obtaining a resource utilization trend of the first computer system based on a history of utilization of an IT resource in the first computer system;
obtaining a data sending throughput rate from the first computer system to each of the at least one computer service system;
selecting, based on the resource utilization trend and the data sending throughput rate, a target computer service system among the at least one computer service system to migrate a workload from the first computer system to the target computer service system;
determining, based on the resource utilization trend and the data sending throughput rate, a start time to start a precede data copy associated with the workload to be migrated from the first computer system to the target computer service system, prior to switching over processing of the workload to be migrated from the on premise system to the target computer service system at a switching time; and
starting the precede data copy associated with the workload to be migrated from the first computer system to the target computer service system at the start time.

### Claim 2 (depends on 1)

A method according to claim 1,
wherein obtaining the data sending throughput rate comprises sending a small amount of data from the first computer system to each of the at least one computer service system periodically to obtain a real-time data sending throughput rate for each of the at least one computer service system.

### Claim 3 (depends on 1)

A method according to claim 1,
wherein the determining includes determining the start time such that a difference between the start time and the switching time is at least equal to an estimated copy time of a total amount of data associated with the workload to be migrated from the first computer system to the target computer service system.

### Claim 4 (depends on 3)

A method according to claim 3,
wherein the starting of the precede data copy is triggered when remaining time to consume rest of the IT resource in the first computer system calculated based on the resource utilization trend becomes lower than the estimated copy time plus a margin.

### Claim 5 (depends on 1)

A method according to claim 1, further comprising:
migrating the workload from the first computer system to the target computer service system either immediately after completion of the precede data copy or by an independent trigger.

### Claim 6 (depends on 5)

A method according to claim 5, wherein if the independent trigger is activated and the precede data copy has not been completed, migration of the workload waits until the precede data copy is completed.

### Claim 7 (depends on 5)

A method according to claim 5, further comprising:
transferring the resource utilization trend of the first computer system to the target computer service system during migration of the workload to the target computer service system.

### Claim 8 (depends on 7)

A method according to claim 7, wherein the IT resource includes at least one of virtual server instances and storage capacity, the method further comprising:
starting automated virtual server provisioning in the target computer service system based on the resource utilization trend transferred from the first computer system.

### Claim 9 (depends on 1)

A method according to claim 1,
wherein the at least one computer service system includes at least one cloud service system; and
wherein the first computer system is one of an on premise computer system or another cloud service system.

### Claim 10 (depends on 1)

A method according to claim 1, further comprising:
monitoring both a server resource consumption trend and a storage resource consumption trend of the first computer system;
determining which of the server resource and the storage resource will be first to be consumed down to a corresponding threshold level, the threshold level being equal to or greater than zero;
calculating a consumed storage amount of the storage resource when the threshold level is first reached; and
using the calculated consumed storage amount for determining the start time.

### Claim 11 (depends on 1)

A method according to claim 1, further comprising:
selecting the target computer service system which has a shortest copy time for the precede data copy.

### Claim 12 (depends on 11)

A method according to claim 11, wherein the target computer service system having the shortest copy time is selected by referring to a data transfer performance summary table containing, for each computer service system, an ID, an I/O throughput rate, and an estimated copy time.

### Claim 13 (depends on 1)

A method according to claim 1, further comprising:
after completion of migrating the workload from the first computer system to the target computer service system, directing an access target for the first computer system to the target computer service system instead of to the first computer system.

### Claim 14

A management system for managing IT (Information Technology) sources, the management system comprising:
a first computer system;
at least one computer service system; and
a service director computer connected to the first computer system and the at least one computer service system via a network, wherein the service director computer
obtains a resource utilization trend of the first computer system based on a history of utilization of an IT resource in the first computer system;
obtains a data sending throughput rate from the first computer system to each of the at least one computer service system;
selects, based on the resource utilization trend and the data sending throughput rate, a target computer service system among the at least one computer service system to migrate a workload from the first computer system to the target computer service system;
determines, based on the resource utilization trend and the data sending throughput rate, a start time to start a precede data copy associated with the workload to be migrated from the first computer system to the target computer service system, prior to switching over processing of the workload to be migrated from the on premise system to the target computer service system at a switching time; and
starts the precede data copy associated with the workload to be migrated from the first computer system to the target computer service system at the start time.

### Claim 15 (depends on 14)

A management system according to claim 14,
wherein the start time is determined such that a difference between the start time and the switching time is at least equal to an estimated copy time of a total amount of data associated with the workload to be migrated from the first computer system to the target computer service system.

### Claim 16 (depends on 15)

A management system according to claim 15,
wherein the starting of the precede data copy is triggered when remaining time to consume rest of the IT resource in the first computer system calculated based on the resource utilization trend becomes lower than the estimated copy time plus a margin.

### Claim 17 (depends on 14)

A management system according to claim 14, wherein the service director computer further:
migrates the workload from the first computer system to the target computer service system after completion of the precede data copy either immediately after completion of the precede data copy or by an independent trigger.

### Claim 18 (depends on 17)

A management system according to claim 17, wherein the service director computer further:
transfers the resource utilization trend of the first computer system to the target computer service system during migration of the workload to the target computer service system.

### Claim 19 (depends on 18)

A management system according to claim 18,
wherein the IT resource includes at least one of virtual server instances and storage capacity, and
wherein the service director computer starts automated virtual server provisioning in the target computer service system based on the resource utilization trend transferred from the first computer system.

### Claim 20

A computer-readable storage medium storing a plurality of instructions for controlling a data processor to manage IT (Information Technology) sources among a first computer system and at least one computer service system which are connected with a network, the plurality of instructions comprising:
instructions that cause the data processor to obtain a resource utilization trend of the first computer system based on a history of utilization of an IT resource in the first computer system;
instructions that cause the data processor to obtain a data sending throughput rate from the first computer system to each of the at least one computer service system;
instructions that cause the data processor to select, based on the resource utilization trend and the data sending throughput rate, a target computer service system among the at least one computer service system to migrate a workload from the first computer system to the target computer service system;
instructions that cause the data processor to determine, based on the resource utilization trend and the data sending throughput rate, a start time to start a precede data copy associated with the workload to be migrated from the first computer system to the target computer service system, prior to switching over processing of the workload to be migrated from the on premise system to the target computer service system at a switching time; and
instructions that cause the data processor to start the precede data copy associated with the workload to be migrated from the first computer system to the target computer service system at the start time.