# US 2010/0244911 A1 · Supply circuitry for sleep mode

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2010/0244911 A1
- Document ID: US20100244911A1
- Status: Published application
- Kind: A1
- Application number: 12/728,796
- Filed: 2010-03-22
- Published: 2010-09-30
- Earliest claimed: 2009-03-24
- Assignees: Dolphin Integration
- Inventors: Romuald Soileux; Sébastien Gaubert
- Web page: https://patentgrep.com/patent/US20100244911A1

## CPC

- H03K 17/223: {in field-effect transistor switches}
- H03K 19/0016: {by using a control or a clock signal, e.g. in order to apply power supply}
- H03K: PULSE TECHNIQUE (measuring pulse characteristics G01R; modulating sinusoidal oscillations with pulses H03C; transmission of digital information H04L; discriminator circuits detecting phase difference between two signals by counting or integrating cycles of oscillation H03D3/04; automatic control, starting, synchronisation or stabilisation of generators of electronic oscillations or pulses where the type of generator is irrelevant or unspecified H03L; coding, decoding or code conversion, in general H03M)

## Abstract

The invention concerns a supply circuitry system and method, including a supply circuitry arranged to control a power-up phase at the end of a sleep period of a circuit region of an integrated circuit, the supply circuitry comprising: first and second switches coupled between a supply rail and a supply node of the circuit region, the supply rail being coupled to receive a supply voltage (VDD) from a power supply unit; a comparator arranged to provide an output based on a comparison between a voltage at the supply node (VDD_INT) and a reference voltage (VREF); and control circuitry coupled to control terminals of the first and second switches and arranged to activate the first switch at the start of the power-up phase, and to activate the second switch once the output of the comparator indicates that the voltage at the supply node is greater than the reference voltage.

## Claims

### Claim 1

Supply circuitry for controlling a power-up phase at the end of a sleep period of a circuit region of an integrated circuit, the supply circuitry comprising:
first and second switches coupled between a supply rail and a supply node of the circuit region, the supply rail being coupled to receive a supply voltage from a power supply unit;
a comparator arranged to provide an output based on a comparison between a voltage at the supply node and a reference voltage; and
control circuitry coupled to control terminals of the first and second switches and arranged to activate the first switch at the start of the power-up phase, and to activate the second switch once the output of the comparator indicates that the voltage at the supply node is greater than the reference voltage.

### Claim 2 (depends on 1)

The supply circuitry of claim 1, wherein the reference voltage is generated from the supply voltage.

### Claim 3 (depends on 2)

The supply circuitry of claim 2, further comprising an element coupled between the supply voltage and the comparator for providing the reference voltage.

### Claim 4 (depends on 3)

The supply circuitry of claim 3, wherein the element is a diode.

### Claim 5 (depends on 1)

The supply circuitry of claim 1, wherein the first switch is activated by a first control signal and the comparator is also activated by the first control signal.

### Claim 6 (depends on 1)

The supply circuitry of claim 1, further comprising an activity control unit arranged to generate a power-down signal to the control circuitry indicating when a sleep period is to be started and when a sleep period is to be ended.

### Claim 7 (depends on 6)

The supply circuitry of claim 6, wherein the control circuitry is arranged to generate an acknowledgement signal to the activity control unit when the output of the comparator indicates that the voltage at the supply node is greater than the reference voltage.

### Claim 8 (depends on 6)

The supply circuitry of claim 6, wherein, in addition to the circuit region, the activity control unit is coupled to at least one further circuit region for controlling the start and end of a sleep period of the at least one further circuit region.

### Claim 9 (depends on 8)

The supply circuitry of claim 8, wherein the activity control unit is coupled to the power supply unit and is arranged to indicate to the power supply unit when any of the circuit regions has started or is to end a sleep period.

### Claim 10 (depends on 1)

The supply circuitry of claim 1, further comprising a third switch coupled between the supply rail and the supply node of the circuit region, and a further comparator arranged to provide an output to the control circuitry based on a comparison between the voltage at the supply node and a further reference voltage.

### Claim 11

In an integrated circuit having a plurality of circuit regions, and a power supply unit, a supply circuit coupled to the power supply unit and configured to control sleep periods of the plurality of circuit regions, comprising:
first and second switches coupled between a supply rail and a supply node of at least one of the circuit regions, the supply rail being coupled to receive a supply voltage from the power supply unit;
a comparator arranged to provide an output based on a comparison between a voltage at the supply node and a reference voltage; and
control circuitry coupled to control terminals of the first and second switches and arranged to activate the first switch at the start of the power-up phase, and to activate the second switch once the output of the comparator indicates that the voltage at the supply node is greater than the reference voltage.

### Claim 12

A method of controlling a power-up phase at the end of a sleep period of a circuit region of an integrated circuit, the integrated circuit comprising first and second switches coupled between a supply rail and a supply node of the circuit region, the supply rail being coupled to receive a supply voltage from a power supply unit, wherein the first and second switches are deactivated during the sleep period, the method comprising:
activating by control circuitry the first switch, and not the second switch, at the start of the power-up phase;
comparing a voltage at the supply node with a reference voltage; and
activating the second switch when the voltage at the supply node is greater than the reference voltage.

### Claim 13 (depends on 12)

The method of claim 12, further comprising:
before activating the first switch, generating by an activity control unit a power-up signal indicating that the sleep period is to be ended; and
providing by the control circuitry an acknowledgement signal to activity control unit when the voltage at the supply node is greater than the reference voltage.

### Claim 14 (depends on 13)

The method of claim 13, further comprising, prior to the step of generating the power-up signal; generating a warning signal to the power supply unit indicating that the sleep period of the circuit region is to be ended.

### Claim 15 (depends on 12)

The method of claim 12, further comprising:
after the step of activating the second switch, comparing the voltage at the supply node with the reference voltage and generating a warning signal if the voltage at the supply node is lower than the reference voltage.
