# US 2010/0169048 A1 · Maintenance planning method

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2010/0169048 A1
- Document ID: US20100169048A1
- Status: Published application
- Kind: A1
- Application number: 12/441,303
- Filed: 2007-09-07
- Published: 2010-07-01
- Earliest claimed: 2006-09-14
- Assignees: MTU Aero Engines AG
- Inventors: Klaus Hanreich; Rolf Burmeister; Torsten Petrick; Ferdinand Exler
- Web page: https://patentgrep.com/patent/US20100169048A1

## CPC

- F01D 5/005: {Repairing methods or devices}
- G06Q 10/00: Administration; Management
- F05D 2230/80: Repairing, retrofitting or upgrading methods
- F01D: NON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES (machines or engines for liquids F03; non-positive displacement pumps F04D)
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- F05D: INDEXING SCHEME FOR ASPECTS RELATING TO NON-POSITIVE-DISPLACEMENT MACHINES OR ENGINES, GAS-TURBINES OR JET-PROPULSION PLANTS

## Abstract

A maintenance planning method for turbomachines, especially for gas turbine aircraft engines, is disclosed. In an embodiment, the method includes: a) data obtained from the previous maintenance of turbomachines is stored in a database in a structured manner, where the data especially correlates maintenance work carried out with operating loads of a serviced turbomachine; b) in order to pre-plan the maintenance of a turbomachine undergoing further maintenance, the maintenance work to be carried out is planned in terms of type and sequence on the basis of the database; and c) the turbomachine undergoing further maintenance is inspected for the final planning of the maintenance, and the type and/or sequence of the maintenance work to be carried out, which was specified during the pre-planning of the maintenance, is adapted and/or supplemented on the basis of the inspection.

## Claims

### Claim at position 1

1-3. (canceled)

### Claim 4

A maintenance planning method for a turbomachine, comprising the steps of:
storing data obtained from a previous maintenance of turbomachines in a database in a structured manner, wherein the data correlates maintenance work carried out with operating loads of a serviced turbomachine;
pre-planning a maintenance of a turbomachine, wherein the maintenance to be carried out is planned in terms of a type and a sequence on a basis of the database; and
inspecting the turbomachine that is to receive the maintenance for a final planning of the maintenance, wherein in the final planning the type and/or the sequence of the maintenance to be carried out, which was specified during the pre-planning of the maintenance, is adapted and/or supplemented on a basis of the inspection.

### Claim 5 (depends on 4)

The maintenance planning method according to claim 4, wherein a point in time for the maintenance to be carried out is specified for the turbomachine on the basis of the database.

### Claim 6 (depends on 4)

The maintenance planning method according to claim 4, wherein:
the data is stored in the structured manner in a form of decision trees such that the data correlates the maintenance work carried out of component cleaning and/or component coating removal and/or component coating and/or component replacement with the operating loads of a number of hours of operation and/or a number of take-offs and/or a number of landings.

### Claim 7 (depends on 4)

The maintenance planning method according to claim 4, wherein the turbomachine is a gas turbine aircraft engine.
