# US 2010/0168893 A1 · Production schedule creation device and method, production process control device and method, computer program, and computer-readable recording medium

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2010/0168893 A1
- Document ID: US20100168893A1
- Status: Published application
- Kind: A1
- Application number: 12/655,847
- Filed: 2010-01-08
- Published: 2010-07-01
- Earliest claimed: 2003-12-24
- Assignees: Nippon Steel Corporation
- Inventors: Yasuhito Yaji; Kenji Sugiyama; Tetsuaki Kurokawa; Masanori Shioya; Kuniharu Ito; Hirokazu Kobayashi
- Web page: https://patentgrep.com/patent/US20100168893A1

## CPC

- G05B 19/41865: {characterised by job scheduling, process planning, material flow}
- G05B 2219/32297: Adaptive scheduling, feedback of actual proces progress to adapt schedule
- G05B 2219/32301: Simulate production, process stages, determine optimum scheduling rules
- Y02P 90/02: Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
- Y02P 90/80: Management or planning
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- Y02P: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS

## Abstract

A production schedule creation device includes: a production simulator (100) simulating a production process expressing the production state and the production constraint of the production process; a mathematical expression holding device holding a mathematical model (110) crated by acquiring information relating to creation of the production schedule in attention as a mathematical model expressing, in a mathematical expression, the production state and the production constraint of the production process; and an optimization calculation device (120) performing optimization calculation by using a predetermined evaluation function for the mathematical model (110) and calculating a production instruction for the production simulator. The production instruction obtained by the optimization calculation device is supplied to the production simulator (100) so as to execute simulation. Thus, an optimum solution can be obtained by performing only one simulation.

## Claims

### Claim 1

A production schedule creation device, comprising:
a production simulator that simulates a production process expressing a production state and a production constraint of the production process;
a mathematical expression model holding device that holds a mathematical expression model which is created by acquiring information relating to creation of a production schedule to which attention is paid, with a time period previously set from a schedule creation starting time of the above described production process (schedule creation time period) as a target, and is a mathematical expression-model expressing the production state and the production constraint of the above described production process in a mathematical expression; and
an optimization calculation device that performs optimization calculation processing by using a predetermined evaluation function for the above described mathematical expression model, and calculates a production instruction for said production simulator,
wherein the production schedule in the above described production process is created from a simulation result obtained by repeating processing of calculating the production instruction for a time period previously set from present time by the above described optimization calculation processing (instruction calculation time period) to supply the production instruction to said production simulator, executing simulation for only a previously set time period (simulation time period) to determine a production schedule for a previously set time period (schedule determination time period), and setting a date and time immediately after the above described determined time period as a new schedule creation starting time and time to formulate a production schedule.

### Claim 2 (depends on 1)

The production schedule creation device according to claim 1,
wherein said production simulator is a production simulator of a discrete system.

### Claim 3 (depends on 2)

The production schedule creation device according to claim 2,
wherein said production simulator of the discrete system is a simulator expressing the above described production process in a discrete event model, and detects a present production state and production constraint from said simulator when an event occurs.

### Claim 4 (depends on 1)

The production schedule creation device according to claim 1,
wherein the above described time period previously set from the schedule creation starting time is for a previously set target time period.

### Claim 5 (depends on 1)

The production schedule creation device according to claim 1,
wherein the above described time period previously set from the schedule creation starting time is a time period set to be a predetermined divided range from a time of occurrence of the above described event as a prediction range of a future production state.

### Claim 6 (depends on 1)

The production schedule creation device according to claim 1,
wherein the mathematical expression model created by acquiring the information relating to creation of the above described production schedule to which attention is paid is constructed for products, a transportion means, relationship of operation groups accompanying processing of equipment, and a constraint.

### Claim 7 (depends on 1)

The production schedule creation device according to claim 1,
wherein the mathematical expression model created by acquiring the information relating to creation of the above described production schedule to which attention is paid is a mathematical expression model composed of the above described detected present production state and production constraint.

### Claim 8 (depends on 1)

The production schedule creation device according to claim 1,
wherein said optimization calculation device performs the optimization calculation processing by using a previously set evaluation function.

### Claim 9 (depends on 1)

The production schedule creation device according to claim 1,
wherein said optimization calculation device performs the optimization calculation processing by using a previously set linear evaluation function.

### Claim 10 (depends on 1)

The production schedule creation device according to claim 1,
wherein said optimization calculation device creates the above described production schedule as an optimization or sub-optimization problem.

### Claim 11 (depends on 1)

The production schedule creation device according to claim 1,
wherein said optimization calculation device obtains at least an optimum occurring event and its time of occurrence within the above described set prediction range.

### Claim 12 (depends on 1)

The production schedule creation device according to claim 1,
wherein production simulate processing of simulating an operation/situation of all or a part of the above described products, transportion means, relationship of operation groups accompanying processing of equipment, and a constraint, based on the calculation result of said optimization calculation device, and
production schedule determining processing of adopting and determining a production schedule for a previously set determination time period out of the production schedule obtained by the above described production processing
are performed to determine the production schedule for the above described previously set time period (schedule determination time period).

### Claim 13 (depends on 1)

The production schedule creation device according to claim 1,
wherein said production/production simulator proceeds with simulation and determines the production schedule for the above described previously set time period (schedule creation time period).

### Claim 14 (depends on 1)

The production schedule creation device according to claim 1,
wherein processing of performing optimization calculation by separating a future prediction range from the occurrence event of the above described event, and supplying the result to said simulator to advance event occurrence time is repeatedly performed every time an event occurs, and sequence of occurrence of a series of events and event occurrence times obtained from a result of the repeated calculation for each of the above described prediction ranges are determined as the production schedule.

### Claim 15 (depends on 11)

The production schedule creation device according to claim 11,
wherein a series of processing of determining a production schedule of a new determination time period from the above described new schedule creation starting time and date is performed for each of new schedule creation starting times and times which are set in sequence, by
mathematical expression model obtaining processing of setting a date and time immediately after the determination time period of the production schedule determined by the above described production schedule determination processing elapses as the new schedule creation starting time and time, and obtaining a solution for a mathematical expression model based on a new mathematical expression model constructed by processing of constructing the above described mathematical expression model based on the production schedule already determined by the above described production schedule determination processing,
production simulate processing of simulating an operation/situation of a manufacturing process/conveyance based on the solution for the mathematical expression model obtained by the above described mathematical model obtaining processing, and
production determination processing of adopting only a production schedule of a previously set determination time period out of the production schedule obtained by the above described production simulate processing, and determining the production schedule.

### Claim 16 (depends on 2)

The production schedule creation device according to claim 2,
wherein the above described production simulator of the discrete system is constructed by using a Petri net model.

### Claim 17 (depends on 1)

The production schedule creation device according to claim 1,
wherein said optimization calculation device uses an LP (linear programming).

### Claim 18

A method for creating a production schedule by a production schedule creation device having a production simulator that simulates a production process expressing a production state and a production constraint of the production process, a mathematical expression model holding device that holds a mathematical expression model which is created by acquiring information relating to creation of a production schedule to which attention is paid, with a time period previously set from a schedule creation starting time of the above described production process (schedule creation time period) as a target, and is a mathematical expression model expressing the production state and the production constraint of the above described production process in a mathematical expression, and an optimization calculation device that performs optimization calculation processing by using a predetermined evaluation function for the above described mathematical expression model, and calculates a production instruction for the above described production simulator,
wherein the production schedule in the above described production process is created from a simulation result obtained by repeating processing of calculating the production instruction for a time period previously set from present time by the above described optimization calculation processing (instruction calculation time period) to supply the production instruction to the above described production simulator, executing simulation for only the previously set time period (simulation time period) to determine a production schedule for a previously set time period (schedule determination time period), and setting a date and time immediately after the above described determined time period as a new schedule creation starting time and time to formulate a production schedule.

### Claim 19

A computer program causing a computer to realize functions as a production simulator that simulates a production process expressing a production state and a production constraint of the production process, a mathematical expression model holding device that holds a mathematical expression model which is created by acquiring information relating to creation of a production schedule to which attention is paid, with a time period previously set from a schedule creation starting time of the above described production process (schedule creation time period) as a target, and is a mathematical expression model expressing the production state and the production constraint of the above described production process in a mathematical expression, and an optimization calculation device that performs optimization calculation processing by using a predetermined evaluation function for the above described mathematical expression model, and calculates a production instruction for the above described production simulator,
wherein the production schedule in the above described production process is created from a simulation result obtained by repeating processing of calculating the production instruction for a time period previously set from present time by the above described optimization calculation processing (instruction calculation time period) to supply the production instruction to the above described production simulator, executing simulation for only a previously set time period (simulation time period) to determine a production schedule for a previously set time period (schedule determination time period), and setting a date and time immediately after the above described determined time period as a new schedule creation starting time and time to formulate a production schedule.

### Claim 20

A computer-readable recording medium recording a computer program causing a computer to realize functions as a production simulator that simulates a production process expressing a production state and a production constraint of the production process, a mathematical expression model holding device that holds a mathematical expression model which is created by acquiring information relating to creation of a production schedule to which attention is paid, with a time period previously set from a schedule creation starting time of the above described production process (schedule creation time period) as a target, and is a mathematical expression model expressing the production state and the production constraint of the above described production process in a mathematical expression, and an optimization calculation device that performs optimization calculation processing by using a predetermined evaluation function for the above described mathematical expression model, and calculates a production instruction for the above described production simulator,
wherein the production schedule in the above described production process is created from a simulation result obtained by repeating processing of calculating the production instruction for a time period previously set from present time by the above described optimization calculation processing (instruction calculation time period) to supply the production instruction to the above described production simulator, executing simulation for only the previously set time period (simulation time period) to determine a production schedule for a previously set time period (schedule determination time period), and setting a date and time immediately after the above described determined time period as a new schedule creation starting time and time to formulate a production schedule.

### Claim 21

A production process control device, comprising:
a production simulator that simulates a production process expressing a production state and a production constraint of the production process;
a mathematical expression model holding device that holds a mathematical expression model which is created by acquiring information relating to creation of a production schedule to which attention is paid, with a time period previously set from a schedule creation starting time of the above described production process (schedule creation time period) as a target, and is a mathematical expression model expressing the production state and the production constraint of the above described production process in a mathematical expression; and
an optimization calculation device that performs optimization calculation processing by using a predetermined evaluation function for the above described mathematical expression model, and calculates a production instruction for said production simulator,
wherein production control of the production process is performed based on a simulation result obtained by repeating processing of calculating the production instruction for a time period previously set from present time by the above described optimization calculation processing (instruction calculation time period) to supply the production instruction to the above described production simulator, executing simulation for only the previously set time period (simulation time period) to determine a production schedule for a previously set time period (schedule determination time period), and setting a date and time immediately after the above described determined time period as a new schedule creation starting time and time to formulate a production schedule.

### Claim 22

A method for controlling a production process using a production process control device having a production simulator that simulates a production process expressing a production state and a production constraint of the production process, a mathematical expression model holding device that holds a mathematical expression model which is created by acquiring information relating to creation of a production schedule to which attention is paid, with a time period previously set from a schedule creation starting time of the above described production process (schedule creation time period) as a target, and is a mathematical expression model expressing the production state and the production constraint of the above described production process in a mathematical expression, and an optimization calculation device that performs optimization calculation processing by using a predetermined evaluation function for the above described mathematical expression model, and calculates a production instruction for the above described production simulator,
wherein production control of the production process is performed based on a simulation result obtained by repeating processing of calculating the production instruction for a time period previously set from present time by the above described optimization calculation processing (instruction calculation time period) to supply the production instruction to the above described production simulator, executing simulation for only a previously set time period (simulation time period) to determine a production schedule for a previously set time period (schedule determination time period), and setting a date and time immediately after the above described determined time period as a new schedule creation starting time and time to formulate a production schedule.

### Claim 23

A computer program causing a computer to realize functions as a production simulator that simulates a production process expressing a production state and a production constraint of the production process, a mathematical expression model holding device that holds a mathematical expression model which is created by acquiring information relating to creation of a production schedule to which attention is paid, with a time period previously set from a schedule creation starting time of the above described production process (schedule creation time period) as a target, and is a mathematical expression model expressing the production state and the production constraint of the above described production process in a mathematical expression, and an optimization calculation device that performs optimization calculation processing by using a predetermined evaluation function for the above described mathematical expression model, and calculates a production instruction for the above described production simulator,
wherein production control of the production process is performed based on a simulation result obtained by repeating processing of calculating the production instruction for a time period previously set from present time by the above described optimization calculation processing (instruction calculation time period) to supply the production instruction to the above described production simulator, executing simulation for only a previously set time period (simulation time period) to determine a production schedule for a previously set time period (schedule determination time period), and setting a date and time immediately after the above described determined time period as a new schedule creation starting time and time to formulate a production schedule.

### Claim 24

A computer-readable recording medium recording a computer program causing a computer to realize functions as a production simulator that simulates a production process expressing a production state and a production constraint of the production process, a mathematical expression model holding device that holds a mathematical expression model which is created by acquiring information relating to creation of a production schedule to which attention is paid, with a time period previously set from a schedule creation starting time of the above described production process (schedule creation time period) as a target, and is a mathematical expression model expressing the production state and the production constraint of the above described production process in a mathematical expression, and an optimization calculation device that performs optimization calculation processing by using a predetermined evaluation function for the above described mathematical expression model, and calculates a production instruction for the above described production simulator,
wherein production control of the production process is performed based on a simulation result obtained by repeating processing of calculating the production instruction for a time period previously set from present time by the above described optimization calculation processing (instruction calculation time period) to supply the production instruction to the above described production simulator, executing simulation for only the previously set time period (simulation time period) to determine a production schedule for a previously set time period (schedule determination time period), and setting a date and time immediately after the above described determined time period as a new schedule creation starting time and time to formulate a production schedule.