# US 2010/0168892 A1 · Method and system for synchronizing chamber down times by controlling transport sequencing in a process tool

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2010/0168892 A1
- Document ID: US20100168892A1
- Status: Published application
- Kind: A1
- Application number: 12/643,294
- Filed: 2009-12-21
- Published: 2010-07-01
- Earliest claimed: 2008-12-31
- Assignees: Advanced Micro Devices, Inc.
- Inventors: Kilian Schmidt
- Web page: https://patentgrep.com/patent/US20100168892A1

## CPC

- H10P 72/0612: {Production flow monitoring, e.g. for increasing throughput}
- G05B 19/41835: {characterised by program execution}
- G05B 19/41865: {characterised by job scheduling, process planning, material flow}
- G05B 2219/32065: Synchronise set points of processes
- G05B 2219/32234: Maintenance planning
- G05B 2219/45031: Manufacturing semiconductor wafers
- Y02P 90/02: Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
- Y02P 90/80: Management or planning
- H10P: GENERIC PROCESSES OR APPARATUS FOR THE MANUFACTURE OR TREATMENT OF DEVICES COVERED BY CLASS H10
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- Y02P: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS

## Abstract

A cluster tool may be operated on the basis of an enhanced sequencing regime in which the supply of substrates is controlled such that a planned time of maintenance is reached for two or more process chambers simultaneously. Consequently, the occurrence of non-correlated sequential down times of various process chambers may be significantly reduced, thereby enhancing throughput and availability of complex cluster tools.

## Claims

### Claim 1

A method of processing substrates in a manufacturing environment according to a sequence of interrelated process steps, the method comprising:
determining a first metric for a first process chamber of a first plurality of process chambers used to perform a first process step of said sequence of interrelated process steps, said first metric indicating a time to a first planned maintenance event for said first process chamber;
determining a second metric for a second process chamber of a second plurality of process chambers used to perform a second process step of said sequence of interrelated process steps, said second metric indicating a time to a second planned maintenance event for said second process chamber; and
controlling supply of substrates to said first and second plurality of process chambers on the basis of said first and second metrics so as to synchronize said first and second planned maintenance events.

### Claim 2 (depends on 1)

The method of claim 1, further comprising controlling supply of substrates so as to maintain full processing capacity of said first and second process steps.

### Claim 3 (depends on 1)

The method of claim 1, wherein one of said first and second plurality of process chambers represents the lowest processing capacity of said sequence.

### Claim 4 (depends on 3)

The method of claim 3, further comprising supplying said substrates equally to said one of said first and second plurality of process chambers that represents the lowest processing capacity.

### Claim 5 (depends on 1)

The method of claim 1, further comprising determining a third metric for a third process chamber of a third plurality of process chambers used to perform a third process step of said sequence of interrelated process steps, wherein said third metric indicates a time to a third planned maintenance event for said third process chamber and wherein supply of substrates to said third plurality of process chambers is controlled so as to synchronize said third planned maintenance event with said first and second planned maintenance event.

### Claim 6 (depends on 1)

The method of claim 1, wherein controlling supply of substrates to said first and second plurality of process chambers comprises determining a processing capacity for each of said first and second pluralities of process chambers for processing said substrates in said sequence.

### Claim 7 (depends on 6)

The method of claim 6, wherein determining a processing capacity for each of said first and second process chambers comprises identifying process recipes to be applied for processing said substrates and determining said processing capacities for each of said process recipes.

### Claim 8 (depends on 1)

The method of claim 1, wherein controlling supply of substrates to said first and second plurality of process chambers comprises determining a percentage of substrates to be supplied to each process chamber and determining whether or not said percentage is equal to or less than a process capacity of said process chamber.

### Claim 9 (depends on 1)

The method of claim 1, wherein said sequence of interrelated processes is performed in a cluster tool.

### Claim 10 (depends on 1)

The method of claim 1, further comprising processing a plurality of substrates through at least one of said first and second process chambers.

### Claim 11

A method of sequencing substrates in a cluster tool, the method comprising:
determining a time to maintenance for two or more of a plurality of process chambers of said cluster tool, said plurality of process chambers performing two or more interrelated process steps, said two or more of the plurality of process chambers being used for performing at least two different process steps of said plurality of interrelated process steps; and
controlling supply of substrates to said two or more process chambers so as to synchronize said time to maintenance for said two or more process chambers.

### Claim 12 (depends on 11)

The method of claim 11, further comprising determining a processing capacity for each of said plurality of process chambers and wherein supply of substrates is controlled on the basis of said processing capacities.

### Claim 13 (depends on 12)

The method of claim 12, wherein controlling supply of substrates to said two or more process chambers comprises determining a percentage of substrates to be supplied to each of said two or more process chambers and verifying that each percentage is compatible with an associated processing capacity of said two or more process chambers.

### Claim 14 (depends on 12)

The method of claim 12, wherein said processing capacity is determined for each process recipe to be applied when processing said substrates in said cluster tool.

### Claim 15 (depends on 12)

The method of claim 12, wherein one of said two or more process chambers has the lowest processing capacity.

### Claim 16 (depends on 11)

The method of claim 11, further comprising processing a plurality of substrates through at least one of said first and second process chambers.

### Claim 17 (depends on 13)

The method of claim 13, further comprising updating said percentages after at least one of an occurrence of a tool failure of said cluster tool and completing a maintenance activity associated with said time to maintenance.

### Claim 18

A control system, comprising:
a maintenance monitor operatively connectable to a plurality of process chambers used to process substrates according to at least two different process steps, said maintenance monitor being configured to provide a value indicating a time to a planned maintenance for each of said plurality of process chambers; and
a synchronizing unit operatively connected to said maintenance unit and configured to determine a sequencing regime for said plurality of process chambers so as to synchronize the time to a planned maintenance for at least two of said plurality of process chambers.

### Claim 19 (depends on 18)

The control system of claim 18, further comprising a control unit connected to said synchronizing unit and to a transport system connected to said plurality of process chambers, wherein said control unit is configured to control said transport system on the basis of said sequencing regime.

### Claim 20 (depends on 18)

The control system of claim 18, wherein said control system is a part of a cluster process tool configured to process substrates for semiconductor products.
