# US 2010/0166504 A1 · Concentrically Loaded, Adjustable Piering System

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2010/0166504 A1
- Document ID: US20100166504A1
- Status: Published application
- Kind: A1
- Application number: 12/632,572
- Filed: 2009-12-07
- Published: 2010-07-01
- Earliest claimed: 2008-12-30
- Inventors: Steven Patton
- Web page: https://patentgrep.com/patent/US20100166504A1

## CPC

- E02D 5/00: Bulkheads, piles, or other structural elements specially adapted to foundation engineering (engineering elements in general F16)
- E02D: FOUNDATIONS; EXCAVATIONS; EMBANKMENTS (specially adapted for hydraulic engineering E02B); UNDERGROUND OR UNDERWATER STRUCTURES {(tunnels, tunnelling, mining E21)}

## Abstract

A piering system includes a heave plate attached to a foundation and supported by a pier. A downward facing socket is permanently attached to the heave plate. The socket receives the top end of a heavy stud of a coupling assembly, the bottom end of the stud is screwed into a captive nut of a shim-block. A nut is welded to the stud leaving about ½ inch of the stud protruding upwards for insertion into the socket. The nut may be turned to adjust the height of the stud. The shim-block and coupling assembly are supported by a head plate which is supported by the pier. The head plate includes a wide table for supporting a pair of jacks on opposite sides of a house jack facilitating installation of the system. The cooperation of the ball and socket helps to prevent “off-set loads” which otherwise may break the piering system.

## Claims

### Claim 1

A piering system for supporting a foundation, the piering system comprising:
a pier which includes a starter segment made of pipe welded to a disc, and alternating overlapping segments of pipe having different diameters, the smaller segments fitting inside the larger;
a head plate supported by the pier, the head plate comprising:
a head plate table welded to a head plate pipe; and
four gussets welded to the bottom of the head plate table and to the sides of the headplate pipe;
a shim block attached to the head plate table leaving space on the head plate table to place a jack for leveling the foundation, the shim block comprising:
an outer pipe;
an inner pipe inside the outer pipe;
a shim block base welded on the bottom of the outer pipe to prevent the inner pipe from falling out; and
a shim block nut fixed at the top of the outer pipe;
a threaded stud screwed into the shim block nut;
a heave plate residing on top of the threaded stud, having a pipe nipple welded near the center of a bottom surface of the heave plate to receive the threaded stud for providing vertical support to the heave plate while allowing a tilt of the heave plate; and
at least two attachments permanently fixedly connecting the heave plate to the foundation.

### Claim 2

A piering system for supporting a foundation, the piering system comprising:
a pier reaching downward under the foundation to a stable base;
a head plate vertically supported by the pier;
a shim block vertically supported by the head plate and adjustable in height; and
a heave plate fixedly attached to a bottom surface of the foundation and vertical supported by the shim block.

### Claim 3 (depends on 2)

The piering system of claim 2, wherein the heave plate may pivot with respect to the shim block to compensate for angled bottom surfaces of the foundation.

### Claim 4 (depends on 3)

The piering system of claim 3, wherein the heave plate includes a downward opening socket and the shim block includes an upward reaching stud residing in the socket to allow the heave plate to pivot with respect to the shim block to compensate for angled bottom surfaces of the foundation.

### Claim 5 (depends on 4)

The piering system of claim 4, wherein:
the upward reaching stud is a threaded stud, and is threaded into a nut fixed to the shim block; and
the stud may be turned to advance or retreat vertically to adjust the height of the heave plate with respect to the shim block.

### Claim 6 (depends on 5)

The piering system of claim 5, wherein the upward reaching stud is an approximately 1½ inch diameter grade-8 threaded stud.

### Claim 7 (depends on 3)

The piering system of claim 3, wherein the shim block comprises:
a horizontal base;
a vertical column;
a fixed nut welded proximal to the top of the column; and
the threaded stud screwed into the fixed nut.

### Claim 8 (depends on 2)

The piering system of claim 2, wherein the heave plate is attached to the foundation by at least two permanent attachments.

### Claim 9 (depends on 8)

The piering system of claim 8, wherein the heave plate is attached to the foundation by at least two concrete anchors driven through holes in the heave plate and into the foundation.

### Claim 10 (depends on 9)

The piering system of claim 9, wherein the heave plate comprises a section of steel angle.

### Claim 11 (depends on 9)

The piering system of claim 9, wherein the heave plate comprises an approximately 14 inch long section of six inch by four inch, ⅜ inch thick steel angle.

### Claim 12 (depends on 2)

The piering system of claim 2, wherein the pier comprises overlapping inner and outer cylinders reaching down to the stable base and cut off approximately ten inches below the foundation.

### Claim 13 (depends on 12)

The piering system of claim 12, wherein the head plate comprises:
an approximately horizontal head plate table; and
a head plate cylinder reaching downward from the head plate table and fitting over the top of the pier to position the head plate vertically supported by the pier.

### Claim 14 (depends on 13)

The piering system of claim 13, wherein the head plate table has sufficient surface area to carry a house jack approximately centered on the head plate table and at least one additional jack beside the house jack.

### Claim 15 (depends on 14)

The piering system of claim 14, wherein the head plate table is approximately six inches by approximately fourteen inches of steel plate for providing support for the house jack and two additional jack, one on each side of the house jack.

### Claim 16 (depends on 2)

The piering system of claim 2, wherein the shim block is attached to the head plate by two bolts.

### Claim 17 (depends on 2)

The piering system of claim 2, wherein the shim block is attached to the head plate by two straps.

### Claim 18

A method for constructing a pier system to stabilize and level a structure, the method comprising:
constructing a pier comprising the steps of:
forming hole about 26 inches below the foundation;
placing a pier base having a base cylinder portion in the bottom of the hole;
placing a first outer cylinder over the base cylinder portion;
inserting a first inner cylinder inside a recess in the first outer cylinder, the first inner cylinder butting against the base cylinder portion; and
repeating the steps of adding an additional overlapping outer cylinder and an additional inner cylinder providing a 50 percent overlap of consecutive cylinders creating a link between the outer cylinders and advancing the cylinders downward using a hydraulic ram until bedrock is reached;
completing the piering system comprising the steps of:
cutting the top most cylinders to be approximately ten inches below the foundation;
positioning a head plate on top of the pier to provide a stable platform for a house jack;
positioning the house jack on the head plate;
positioning a heave plate between the house jack and the foundation;
using the house jack to apply a vertical lifting force to lift the foundation of the structure to adjust the structure, the heave plate distributing the lifting force to avoid damage to the foundation;
after adjustment is finished, positioning additional jacks on the head plate on either side of the house jack to support the foundation;
removing the house jack;
positioning a shim block and coupling assembly on the head plate;
advancing the coupling assembly upward until the coupling assembly reaches into a socket of the heave plate;
removing the additional jacks;
drilling holes through the holes in the heave plate into the foundation; and
driving concrete anchors through the holes in the heave plate and into the holes drilled into the foundation to fix the heave plate to the foundation.

### Claim 19 (depends on 18)

The method of claim 18, further including bending straps over to lock the shim block to the head plate.

### Claim 20 (depends on 18)

The method of claim 18, further including bolting the shim block to the head plate.
