# US 2010/0166420 A1 · Apparatus and method for controlling route and resource in packet-optic convergence network

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2010/0166420 A1
- Document ID: US20100166420A1
- Status: Published application
- Kind: A1
- Application number: 12/640,811
- Filed: 2009-12-17
- Published: 2010-07-01
- Earliest claimed: 2008-12-22
- Assignees: Electronics and Telecommunications Research Institute
- Inventors: Hyung Seok CHUNG; You Hyeon JEONG
- Web page: https://patentgrep.com/patent/US20100166420A1

## CPC

- H04L 47/825: {Involving tunnels, e.g. MPLS}
- H04L 45/302: Route determination based on requested QoS
- H04L 45/62: {Wavelength based (optical switching H04Q11/0062)}
- H04L 45/64: using an overlay routing layer
- H04L 47/70: Admission control; Resource allocation
- H04L 47/805: {QOS or priority aware}
- H04L 47/822: {Collecting or measuring resource availability data}
- H04Q 11/0071: {Provisions for the electrical-optical layer interface}
- H04Q 2011/0077: {Labelling aspects, e.g. multiprotocol label switching [MPLS], G-MPLS, MPAS}
- H04L: TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION (arrangements common to telegraphic and telephonic communication H04M)
- H04Q: SELECTING (switches, relays, selectors H01H; wireless communication networks H04W)

## Abstract

There is provided a method of controlling routes and resources in a packet-optic convergence network. The method includes receiving PTL route information between edge devices of the packet-optic convergence network, in which the PTL route information is provided through a route management system; monitoring a resource use state according to PTL route in the process of reserving, changing, or releasing resources in response to a request for the reservation, change, or release of the resources by a service control system; and changing PTL routes or resources allocated to the PTL routes through the route management system on the basis of the resource use state according to PTL route, thereby ensuring greater stability in providing an IP premium service with a Quality of Service (QoS) guarantee.

## Claims

### Claim 1

A method of controlling routes and resources in a resource admission control system included in a packet-optic convergence network, the method comprising:
Monitoring a resource use state according to Packet Transport Layer (PTL) route in the process of reserving, changing, or releasing resources in response to a request of a service control system; and
changing PTL routes or resources allocated to the PTL routes through a route management system on the basis of the resource use state according to PTL route.

### Claim 2 (depends on 1)

The method of claim 1, further comprising:
receiving PTL route information between edge devices of the packet-optic convergence network, the PTL route information being provided through the route management system.

### Claim 3 (depends on 2)

The method of claim 2, wherein the monitoring of the resource use state comprises:
monitoring a resource of a PTL route corresponding to a particular service session on the basis of the PTL route information, when the service control system makes a request for reservation, change, or release of resources for the particular service session; and
monitoring the resource use state in the process of reserving, changing, or releasing the resources on the basis of the monitored resource of the corresponding PTL route.

### Claim 4 (depends on 2)

The method of claim 2, wherein the changing of the PTL routes or the resources allocated to the PTL routes through the route management system comprises:
increasing an amount of allocated resources for a PTL route having a large amount of resources relative to a resource use rate thereof;
decreasing the amount of allocated resources for a PTL route having a small amount of resources relative to a resource use rate thereof;
canceling a PTL route having a resource use rate below a preset standard; and
additionally setting a PTL route having a resource use rate above the preset standard.

### Claim 5 (depends on 4)

The method of claim 4, further comprising updating the PTL route information on the basis of a result of the changing of the PTL routes or the resources allocated to the PTL routes through the route management system.

### Claim 6

A method of controlling routes and resources in a route management system included in a packet-optic convergence network, the method comprising:
setting Packet Transport Layer (PTL) routes between edge devices of the packet-optic convergence network and allocating resources to the PTL routes, and providing PTL route information to a resource admission control system; and
changing the PTL routes or the resources allocated to the PTL routes in response to a resource change request of the resource admission control system.

### Claim 7 (depends on 6)

The method of claim 6, further comprising reporting, to the resource admission control system, a result of the changing of the PTL routes or the resources allocated to the PTL routes.

### Claim 8

An apparatus of controlling routes and resources in a packet-optic convergence network, the apparatus comprising:
a route management system setting Packet Transport Layer (PTL) routes and allocating resources to the PTL routes; and
a resource admission control system reserving, changing, or releasing the resources in response to a request of a service control system, and then changing the PTL routes or the resources allocated to the PTL routes through the route management system on the basis of a resource use state according to PTL route.

### Claim 9 (depends on 8)

The apparatus of claim 8, wherein the route management system changes the PTL routes or the resources allocated to the PTL routes in response to the request of the service control system, and reports, to the resource admission control system, a result of the changing of the PTL routes or the resources allocated to the PTL routes.

### Claim 10 (depends on 8)

The apparatus of claim 8, wherein the resource admission control system causes the route management system to increase an amount of allocated resources for a PTL route having a large amount of resources relative to a resource use rate thereof, decrease the amount of allocated resources for a PTL route having a small amount of resources relative to a resource use rate thereof, cancel a PTL route having a resource use rate below a preset standard, and additionally set a PTL route having a resource use rate above the preset standard.
