# US 2010/0165934 A1 · Method and apparatus for resource allocation in an orthogonal frequency division multiplexing communication system

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2010/0165934 A1
- Document ID: US20100165934A1
- Status: Published application
- Kind: A1
- Application number: 12/478,036
- Filed: 2009-06-04
- Published: 2010-07-01
- Earliest claimed: 2008-12-31
- Assignees: Motorola, Inc.
- Inventors: Daniel R. Tayloe; Chih-Ming J. Chiang; Mark T. Pflum
- Web page: https://patentgrep.com/patent/US20100165934A1

## CPC

- H04W 52/262: {taking into account adaptive modulation and coding [AMC] scheme}
- H04L 1/0015: {characterised by the adaptation strategy}
- H04L 1/0003: {by switching between different modulation schemes}
- H04L 5/0007: {the frequencies being orthogonal, e.g. OFDM(A) or DMT}
- H04L 5/0085: {when channel conditions change}
- H04W 52/143: {Downlink power control}
- H04W 52/362: {Aspects of the step size}
- H04W 72/04: Wireless resource allocation
- H04W: WIRELESS COMMUNICATION NETWORKS (broadcast communication H04H; communication systems using wireless links for non-selective communication, e.g. wireless extensions H04M1/72)
- H04L: TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION (arrangements common to telegraphic and telephonic communication H04M)

## Abstract

A method and Node B are disclosed for allocation of “sticky” resources in an Orthogonal Frequency Division Multiplexing communication system. The Node B comprises a scheduler that is configured to make a sticky resource allocation to a user equipment, determine that a transmit power level allocated for transmissions to the user equipment should be adjusted, determine whether the resources allocated to the user equipment comprise a Quadrature Phase Shift Keying (QPSK) modulation scheme, and in response to determining that the resources allocated to the user equipment comprise a QPSK modulation scheme, adjust the allocated transmit power level without informing the user equipment of the adjustment. The Node B further may condition the determination to adjust the allocated transmit power level without informing the UE of the adjustment based on a size of the adjustment.

## Claims

### Claim 1

A method for allocating resources in an Orthogonal Frequency Division Multiplexing communication system, the method comprising:
making a sticky resource allocation to a user equipment;
determining that a transmit power level allocated for transmissions to the user equipment should be adjusted;
determining whether the resources allocated to the user equipment comprise a Quadrature Phase Shift Keying (QPSK) modulation scheme; and
in response to determining that the resources allocated to the user equipment comprise a QPSK modulation scheme, adjusting the allocated transmit power level without informing the user equipment of the adjustment.

### Claim 2 (depends on 1)

The method of claim 1, wherein adjusting the allocated transmit power level without informing the user equipment of the adjustment comprises determining a size of the adjustment and determining to adjust the allocated transmit power level without informing the user equipment of the adjustment based on the size of the adjustment.

### Claim 3 (depends on 1)

The method of claim 1, wherein adjusting the allocated transmit power level without informing the user equipment of the adjustment comprises
comparing an adjustment of the transmit power level to a threshold;
when the adjustment is less than the threshold, adjusting the allocated transmit power level without informing the user equipment of the adjustment.

### Claim 4 (depends on 3)

The method of claim 3, wherein the method further comprises, when the adjustment exceeds the threshold, adjusting the allocated transmit power level and informing the user equipment of the adjustment.

### Claim 5 (depends on 1)

The method of claim 1, further comprising, in response to determining that the resources allocated to the user equipment comprise a modulation scheme different from a QPSK modulation scheme, adjusting the allocated the transmit power level and informing the user equipment that the allocated resources have been adjusted.

### Claim 6

A Node B that is capable of allocating resources in an Orthogonal Frequency Division Multiplexing communication system, the Node B comprising a scheduler that is configured to make a sticky resource allocation to a user equipment, determine that a transmit power level allocated for transmissions to the user equipment should be adjusted, determine whether the resources allocated to the user equipment comprise a Quadrature Phase Shift Keying (QPSK) modulation scheme, and in response to determining that the resources allocated to the user equipment comprise a QPSK modulation scheme, adjust the allocated transmit power level without informing the user equipment of the adjustment.

### Claim 7 (depends on 6)

The Node B of claim 6, wherein the scheduler is configured to adjust the allocated transmit power level without informing the user equipment of the adjustment by determining a size of the adjustment and determining to adjust the allocated transmit power level without informing the user equipment of the adjustment based on the size of the adjustment.

### Claim 8 (depends on 6)

The Node B of claim 6, wherein the scheduler is configured to adjust the allocated transmit power level without informing the user equipment of the adjustment by comparing an adjustment of the transmit power level to a threshold and when the adjustment is less than the threshold, adjust the allocated transmit power level without informing the user equipment of the adjustment.

### Claim 9 (depends on 8)

The Node B of claim 8, wherein the scheduler is further configured to, when the adjustment exceeds the threshold, adjust the allocated transmit power level and informing the user equipment of the adjustment.

### Claim 10 (depends on 6)

The Node B of claim 6, wherein the scheduler is further configured to, in response to determining that the resources allocated to the user equipment comprise a modulation scheme different from a QPSK modulation scheme, adjust the allocated the transmit power level and inform the user equipment that the allocated resources have been adjusted.
